GE Multilin
T60 Transformer Protection System
5-161
5 SETTINGS
5.6 GROUPED ELEMENTS
5
Figure 5–77: GROUND DISTANCE ZONES 2 AND HIGHER SCHEME LOGIC
GROUND DIRECTIONAL SUPERVISION:
A dual (zero-sequence and negative-sequence) memory-polarized directional supervision applied to the ground distance
protection elements has been shown to give good directional integrity. However, a reverse double-line-to-ground fault can
lead to a maloperation of the ground element in a sound phase if the zone reach setting is increased to cover high resis-
tance faults.
Ground distance zones 2 and higher use an additional ground directional supervision to enhance directional integrity. The
element’s directional characteristic angle is used as a
maximum torque angle
together with a 90° limit angle.
The supervision is biased toward operation in order to avoid compromising the sensitivity of ground distance elements at
low signal levels. Otherwise, the reverse fault condition that generates concern will have high polarizing levels so that a cor-
rect reverse fault decision can be reliably made.
$.&'5
$1'
$1'
$1'
25
4XDGULODWHUDO
FKDUDFWHULVWLF
RQO\
$1'
25
0(025<
9B!SX
,B!SX
6(77,1*
(QDEOHG
'LVDEOHG
*1'',67=)81&7,21
6(77,1*
2II
*1'',67=%/.
6(77,1*
,$
,%
',67$1&(6285&(
,&
9$*
9%*
9&*
9B
,B
:
\H
97
V
6(77,1*6
*1'',67==20=$1*
581
$(/(0(17
581
%(/(0(17
581
&(/(0(17
*1'',67=32/&855(17
*1'',67=121+20*(1$1*
*1'',67=&203/,0,7
*1'',67=',55&$
*1'',67
',5&203/,0,7
=
*1'',67=92/7/(9(/
*1'',67=48$'5*7%/'
*1'',67=48$'5*7%/'5&$
*1'',67=48$'/)7%/'
*1'',67=48$'/)7%/'5&$
7,0(5
F\FOH
F\FOH
6(77,1*
*1'',67=6839
581
_,1²î,B_!3LFNXS
)/(;/2*,&23(5$1'6
*1'',67=3.3$
*1'',67='32$
)/(;/2*,&23(5$1'6
*1'
=
',67
3.3%
*1'',67='32%
)/(;/2*,&23(5$1'6
*1'
=
',67
3.3&
*1'',67='32&
)/(;/2*,&23(5$1'
*1'
=
',67
3.3
)/(;/2*,&23(5$1'6
23(132/(23 $
ƹ
23(132/(23 %
ƹ
23(132/(23 &
ƹ
'/DQG/RQO\
*1'',67=6831,1
*1'',67=',56831
)/(;/2*,&23(5$1'
23(132/(23
,1
,B
,B
*1'',67=5(95($&+
*1'',67=5(95($&+5&$
*1'',67=5($&+
*1'',67=5&$
*1'',67==20=0$*
*1'',67===$1*
*1'',67===0$*
*1'',67=6+$3(
*1'',67=',5
25
'/DQG/RQO\
Summary of Contents for UR T60
Page 10: ...x T60 Transformer Protection System GE Multilin TABLE OF CONTENTS ...
Page 14: ...xiv T60 Transformer Protection System GE Multilin 0 1 BATTERY DISPOSAL 0 BATTERY DISPOSAL 0 ...
Page 34: ...1 20 T60 Transformer Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 436: ...5 298 T60 Transformer Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 678: ...C 30 T60 Transformer Protection System GE Multilin C 7 LOGICAL NODES APPENDIX C C ...
Page 688: ...D 10 T60 Transformer Protection System GE Multilin D 1 IEC 60870 5 104 PROTOCOL APPENDIX D D ...
Page 700: ...E 12 T60 Transformer Protection System GE Multilin E 2 DNP POINT LISTS APPENDIX E E ...