5-128
C70 Capacitor Bank Protection and Control System
GE Multilin
5.6 GROUPED ELEMENTS
5 SETTINGS
5
5.6.5 NEUTRAL CURRENT
a) MAIN MENU
PATH: SETTINGS
ÖØ
GROUPED ELEMENTS
Ö
SETTING GROUP 1(6)
ÖØ
NEUTRAL CURRENT
The C70 contains protection elements for neutral time overcurrent (ANSI device 51G), neutral instantaneous overcurrent
(ANSI device 50G), and neutral current unbalance (ANSI device 60N). A maximum of six ground time overcurrent and
twelve ground instantaneous overcurrent elements are available, dependent on the CT/VT modules ordered with the relay.
Three neutral current unbalance elements are available.
NEUTRAL CURRENT
NEUTRAL TOC1
MESSAGE
NEUTRAL TOC2
↓
MESSAGE
NEUTRAL TOC6
MESSAGE
NEUTRAL IOC1
MESSAGE
NEUTRAL IOC2
↓
MESSAGE
NEUTRAL IOC12
MESSAGE
NEUTRAL
DIRECTIONAL OC1
MESSAGE
NEUTRAL CURRENT
UNBALANCE 1
MESSAGE
NEUTRAL CURRENT
UNBALANCE 2
MESSAGE
NEUTRAL CURRENT
UNBALANCE 3
Summary of Contents for UR Series C70
Page 2: ......
Page 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Page 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...