GE Multilin
C70 Capacitor Bank Protection and Control System
1-1
1 GETTING STARTED
1.1 IMPORTANT PROCEDURES
1
1 GETTING STARTED 1.1IMPORTANT PROCEDURES
Please read this chapter to help guide you through the initial setup of your new relay.
1.1.1 CAUTIONS AND WARNINGS
Before attempting to install or use the relay, it is imperative that all WARNINGS and CAUTIONS
in this manual are reviewed to help prevent personal injury, equipment damage, and/or down-
time.
1.1.2 INSPECTION CHECKLIST
1.
Open the relay packaging and inspect the unit for physical damage.
2.
View the rear nameplate and verify that the correct model has been ordered.
Figure 1–1: REAR NAMEPLATE (EXAMPLE)
3.
Ensure that the following items are included:
• Instruction
manual.
• GE EnerVista CD (includes the EnerVista UR Setup software and manuals in PDF format).
• Mounting
screws.
For product information, instruction manual updates, and the latest software updates, please visit the GE Multilin website at
.
If there is any noticeable physical damage, or any of the contents listed are missing, please contact GE
Multilin immediately.
GE MULTILIN CONTACT INFORMATION AND CALL CENTER FOR PRODUCT SUPPORT:
GE Multilin
215 Anderson Avenue
Markham, Ontario
Canada L6E 1B3
TELEPHONE
:
(905) 294-6222,
1-800-547-8629 (North America only)
FAX
:
(905) 201-2098
:
HOME PAGE
:
CAUTION
WARNING
®
®
Technical Support:
Tel: (905) 294-6222
Fax: (905) 201-2098
http://www.GEmultilin.com
Model:
Mods:
Wiring Diagram:
Inst. Manual:
Serial Number:
Firmware:
Mfg. Date:
C70E00HCHF8AH6AM6BP8BX7A
000
834727A1
GEK-113329
MAZB98000029
D
2006/07/31
Control Power:
Contact Inputs:
Contact Outputs:
88-300V DC @ 35W / 77-265V AC @ 35VA
300V DC Max 10mA
Standard Pilot Duty / 250V AC 7.5A
360V A Resistive / 125V DC Break
4A @ L/R = 40mS / 300W
RATINGS:
C70
GE Multilin
Made in
Canada
-
M
A
A
B
9
7
0
0
0
0
9
9
-
Capactior Bank Protection Relay
834726A1.CDR
NOTE
Summary of Contents for UR Series C70
Page 2: ......
Page 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Page 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...