![GE TYPHOON FLA 7000 Getting Started Download Page 99](http://html1.mh-extra.com/html/ge/typhoon-fla-7000/typhoon-fla-7000_getting-started_4110878099.webp)
8.2
Place the sample on the stage
Placing a gel sample on the Fluor
stage
Efnisyfirlit
•
The sample must not be thicker than 30 mm. For solutions, the maxim-
um height is 4 mm.
•
Make sure there are no bubbles or gaps on the contact surface.
Aðgerð
Þrep
Place the sample on the Fluor stage.
1
Place the fluorescent plate for digitization on top of the sample.
2
Getting Started with Typhoon FLA 7000 28-9607-64 AD
99
8 Reading digitization samples
8.2 Place the sample on the stage