![GE Senographe DS Operator'S Manual Download Page 178](http://html1.mh-extra.com/html/ge/senographe-ds/senographe-ds_operators-manual_4259012178.webp)
Chapter 16
Page no. 178
16-errors.fm
GE Healthcare
Senographe DS Acquisition System
Revision 1
Operator Manual 5307907-3-S-1EN
Error messages
Table 2 Error messages displayed on the AWS monitor
Message on AWS screen
Explanation
Corrective action
AA
These messages relate to power on/off events:
AA1
Error: Could not connect to
the remote provider !
The specified remote host could
not be found. It may be tempo-
rarily off-line, its address may
have changed or been incor-
rectly entered, the application
on the remote provider may not
be running, or there may be a
network error.
1. Try again after a short wait.
2. If the message is repeated, check that
the server address is correct and that the
remote application is running.
3. If the problem persists, contact
your
Field Service Representative
.
AA2
ATTENTION Do you really
want to SHUT DOWN the
complete system? This
action will stop the work-
station and the X genera-
tor!
This message appears as part
of the normal shutdown
sequence.
Click
Yes
or
No
as required.
AA3
End of remote connection
in progress
A GE Insite connection is being
closed.
No action is required; you can now use
the system.
AA4
Image detection failure,
exam forbidden
An image detection subsystem
is not ready for acquisition after
start-up.
1. Wait to see if the problem clears.
2. If the problem persists, contact
your
Field Service Representative
.
AA5
Initialization not complete,
please wait
A system initialization process is
in progress.
Wait until system initialization is com-
plete.
AA6
No Ups Power Backup
A UPS error has been detected
or communication with the UPS
has been lost.
1. Stop system usage and shut down the
system.
2. Check the mains power supply.
3. Check (on UPS panel) that the batter-
ies are charging. Do not attempt to
restart the system unless the batteries
have been recharged.
4. Restart the system.
5. If the problem persists, contact
your
Field Service Representative
.
AA7
Senograph failure, exam
forbidden
A Senographe (Gantry) subsys-
tem is not ready for acquisition
after start-up.
1. Wait to see if the problem clears.
2. If the problem persists, contact
your
Field Service Representative
.
AA8
Shutdown Process started
...
The AWS shutdown process
has been started because a
UPS primary power failure lon-
ger than 10 seconds has been
detected.
1. Wait for the end of the shutdown
sequence.
2. Check mains power supply.
3. Restart the system when power OK.
4. If the problem persists, contact
your
Field Service Representative
.
FOR
TRAINING
PURPOSES
ONLY!
NOTE:
Once
downloaded,
this
document
is
UNCONTROLLED,
and
therefore
may
not
be
the
latest
revision.
Always
confirm
revision
status
against
a
validated
source
(ie
CDL).