SecoGear Medium-voltage Switchgear Application and Technical Guide
DET-882
Standard SecoGear Construction, Features, and Installation
64
©2017 General Electric All Rights Reserved
Figure 6-29: Section Cutaway (Height, Width, and Depth)
Anchoring Details
Refer to the SecoGear Installation, Operation and
Maintenance manual (DEH-50009) for further installation
instructions.
All shipping split hardware shall be disassembled before
adjacent shipping packages are set in place. Reassemble
to secure shipping split.
Anchor bolts, washers, and channels are to be provided by
the purchaser. Recessed steel channels for supporting the
equipment are recommended. However, it is allowable to
mount. All dimensions shown below are for reference only.
Embedded Floor Channel Requirements
1.
Each floor channel shall be level over its entire length
and floor channels shall be level with each other. This is
critical to prevent distortion of the equipment and to
ensure proper mechanical and electrical connections
between shipping splits and close-coupled equipment.
2.
The finished floor shall be slightly pitched away from
the mounting channels. Ensure pitch does not exceed
flat and level requirements.
3.
The foundation must be flat and level in all planes,
perpendicular on both axes to be within 6.35 mm [0.25
in.] over a 3048 mm [10 in.] span.
4.
The finished floor shall not be higher than the channels.
5.
When bolting to floor channels, they must be drilled and
tapped (weld nuts may be welded inside of the
channels).
Maximum 25.4 mm [1.0 in.] conduit can be accommodated
in this location.
Figure 6-30: SecoGear Installation Drawing – Indoor Anchoring Method
A = Main Busbar
Compartment
B = Circuit Breaker
Compartment
C = Cable
Compartment
D = Front Doors
D
D
B
B
A
C
C
SecoGear
Rear Door
Finished
Floor (Even
& Level)
SecoGear
Front Door
Primary Conduit
Leads
Anchoring Detail in Figure 6-31
Concrete Foundation