Chapter 5: Quick Steps
5495975-1EN Rev.9
5-3
© 2013-2017 General Electric Company. All rights reserved.
Adjust the Overhead Tube Suspension (OTS) Position
1. Use the Longitudinal Lock Release button to move the OTS along the bridge of the overhead rail sys-
tem.
a) Press and hold the Longitudinal Lock Release button on the User Interface.
b) Move the OTS to the desired position.
c) Release the Longitudinal Lock Release button.
2. Use the Vertical Lock Release button to move the telescopic column up and down.
a) Press and hold the Vertical Lock Release button on the User Interface.
b) Move the telescopic to the desired vertical position.
c) Release the Vertical Lock Release button.
3. Use the Lateral Lock Release button to move the OTS carriage from side to side on the bridge.
a) Press and hold the Lateral Lock Release button on the User Interface.
b) Move the OTS carriage to the desired position.
c) Release the Lateral Lock Release button.
4. Use the All-Lock, Lock Release button to simultaneously move the OTS in vertical, lateral and longitu-
dinal directions. If detents are on and the OTS is in lateral detent the system will maintain the lateral
position but move freely in vertical an longitudinal.
a) Press and hold the All-Lock, Lock Release button on the User Interface.
b) Move the OTS to the desired position.
c) Release the All-Lock, Lock Release button.
Note:
Detents remain activated if the detent button is selected.
Adjust the Tube Position
1. Use the Tube Angulation Lock Release button to rotate the tube about the short axis (cranial to cau-
dal).
a) Press and hold the Tube Angulation Lock Release button on the User Interface.
b) Move the tube unit to the desired angle.
c) Release the Tube Angulation Lock Release button.
2. Use the OTS Rotation Detent Release lever to rotate the tube about the vertical axis of the telescopic
column.
a) Press the Rotation Detent Release lever on the right side of the OTS.
b) Rotate the tube unit.
c) Release the lever. The OTS locks in the next 30 degree position.