Installation
2-7
January 2006
Wiring the Wall-Mount
All connections to the wall-mount unit are made through the panel at
the bottom of the case as shown in Figure 2-8 below. Any I/O cabling
is brought into the unit through a gland at the lower left of the case
and connects to the terminal blocks on the left side of the case. Wiring
for these connections is shown in Figure 2-11 on page 2-8. The dew
point sensor and temperature sensor cable connectors are located near
the center of this panel.
Figure 2-8: Wall-Mount Wiring Entrance Locations
Figure 2-9: Wall-Mount Bottom Panel (viewed from under the unit)
DEW POINT
Gland for
I/O Wiring
IN/OUT
LAN
COM
Optional Ethernet
LAN Connector
Serial Port
Dew Point Sensor
Gland for
AC Power
Wiring
4 ASB 250V TYPE T
90/250 VAC 47-63 Hz
AC LINE
TEMP
Temperature Sensor
Summary of Contents for Optica
Page 1: ...GE Sensing Optica General Eastern Dew Point Analyzer Operator s Manual ...
Page 11: ...Chapter 1 ...
Page 20: ...Chapter 2 ...
Page 43: ...Chapter 3 ...
Page 58: ...Chapter 4 ...
Page 80: ...Chapter 5 ...
Page 94: ...Chapter 6 ...
Page 95: ...Network Based Programming Introduction 6 1 Programming Screens 6 1 ...
Page 99: ...Chapter 7 ...
Page 109: ...Appendix A ...
Page 114: ...Appendix B ...
Page 115: ...Humidity Equations and Conversion Chart Introduction B 1 Vapor Pressure B 1 Humidity B 2 ...
Page 119: ...Appendix C ...
Page 120: ...Configuring the Serial Interface Wiring to a Personal Computer C 1 ...
Page 122: ...Appendix D ...
Page 127: ...Appendix E ...
Page 128: ...Glossary ...
Page 130: ...Appendix F ...
Page 133: ...Appendix G ...