
CHAPTER 4: PROGRAMMING
S4 ALARMS/CONTROL
PQM POWER QUALITY METER – INSTRUCTION MANUAL
4–39
4.5
S4 Alarms/Control
4.5.1
Current/
Voltage
Alarms
]] SETPOINTS
]] S4 ALARMS/CONTROL
]] SETPOINTS
]] S5 TESTING
SETPOINT
DETECT I/V ALARMS
USING PERCENTAGE: NO
PHASE UNDERCURRENT
RELAY: OFF
Range: NO, YES
PHASE UNDERCURRENT
LEVEL
d
100 A
PHASE UNDERCURRENT
DELAY: 10.0 s
DETECT UNDERCURRENT
WHEN 0A: NO
PHASE OVERCURRENT
RELAY: OFF
PHASE OVERCURRENT
LEVEL
t
100 A
PHASE OVERCURRENT
DELAY: 10.0 s
PHASE OVERCURRENT
ACTIVATION: AVERAGE
NEUTRAL OVERCURRENT
RELAY: OFF
NEUTRAL OVERCURRENT
LEVEL
t
100 A
NEUTRAL OVERCURRENT
DELAY: 10.0 s
Range: 0.5 to 600.0 s; Step 0.5 s
Range: ALARM, AUX1, AUX2,
AUX3, OFF
] CURRENT/VOLTAGE
]
Range: NO, YES
Range: 0.5 to 600.0 s; Step 0.5 s
Range: 1 to 12000 in steps of 1, or 1
to 150% of CT in steps of 1,
set by the DETECT I/V
ALARMS USING PERCENTAGE
value
Range: AVERAGE, MAXIMUM
CONTINUED ON
NEXT PAGE
Range: ALARM, AUX1, AUX2,
AUX3, OFF
Range: 1 to 12000 A in steps of 1, or
to 150% of CT instepsof1, set by
the DETECT I/V ALARMS USING
PERCENTAGE value
Range: 0.5 to 600.0 s; Step 0.5 s
Range: ALARM, AUX1, AUX2,
AUX3, OFF
MESSAGE
MESSAGE
MESSAGE
Range: 1 to 12000 A in steps of 1, or 1
to 100% of CT in steps of 1, set
by the DETECT I/V ALARMS
USING PERCENTAGE value.