APPENDIX B: INSTALLING AND CONNECTING DNP3 I/O MODULES
D400 SUBSTATION GATEWAY INSTRUCTION MANUAL
GE INFORMATION
177
Table 57: Site ground connection examples
After site ground has been connected, you are now ready to connect power, and DNP3 link
cabling to the DNP I/O module. See “Connecting DNP3 I/O modules (Low Voltage)” on
page 178 or “Connecting DNP3 I/O modules (High Voltage)” on page 180.
Module Type
Site Ground Connection
DC Analog Input Module
Digital Input Module
Control Output Module
Combination Input Output Module
12 AWG
GND Wire
Site
100
47
97
48
49
50
98
99
TB1
2.05 mm (12 AWG)
green wire
Site Ground
12 AWG
GRN GND
Site
132
63
129
64
65
66
130 131
TB1
2.05 mm (12 AWG)
green wire
Site Ground
12 AWG
GRN GND
Site
106
50
103
51
52
53
104 105
TB1
2.05 mm (12 AWG)
green wire
Site Ground
Site
100
47
97
48
49
50
98
99
TB1
12 AWG
Green Wire
2.05 mm (12 AWG)
green wire
Site Ground
Summary of Contents for Multilin D400
Page 12: ...12 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL PRODUCT SUPPORT ...
Page 28: ...28 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 1 BEFORE YOU START ...
Page 34: ...34 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 2 INSTALLING THE D400 ...
Page 88: ...88 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 5 POWERING UP THE D400 ...
Page 174: ...174 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL APPENDIX A STANDARDS PROTECTION ...
Page 184: ...184 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL APPENDIX C LIST OF ACRONYMS ...
Page 192: ...192 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL INDEX ...