CHAPTER 9: FLEXLOGIC AND OTHER SETPOINTS
FLEXLOGIC
850 FEEDER PROTECTION SYSTEM – INSTRUCTION MANUAL
9–11
Switch Control
SW[X] Open Cmd
SW[X] Close Cmd
SW[X] Remote Open
SW[X] Remote Close
SW[X] Rem Blk Open
SW[X] Rem Blk Close
SW[X] Rem Blk Open Byp
SW[X] Rem Blk Close Byp
Local or Remote Open command initiated to Switch [X]
Local or Remote Close command initiated to Switch [X]
Remote Open command is initiated to Switch [X]
Remote Close command is initiated to Switch [X]
The Open command to Switch [X] is blocked
The Close command to Switch [X] is blocked
The block open signal for Switch [X] is bypassed
The block close signal for Switch [X] is bypassed
[X] - the element number.
Synchrocheck Sync1
OK
Sync1 Live Bus
Sync1 Live Line
Sync1 Dead Bus
Sync1 Dead Line
Sync1 Dead Src OK
Sync1 Close Perm
Synchrocheck 1 permission is given
Synchrocheck 1 bus voltage is live
Synchrocheck 1 line voltage is live
Synchrocheck 1 bus voltage is dead
Synchrocheck 1 line voltage is dead
Synchrocheck 1 dead source permission is given
Synchrocheck 1 breaker closing permission is given
Tab Pushbuttons
TAB PB [X] ON
TAB PB [X] OFF
TAB PB [X] PRESS
Tab Pushbutton [X] is ON
Tab Pushbutton [X] is OFF
Tab Pushbutton [X] is Pressed Down
Thermal Overload
Thermal 1 Alarm A
Thermal 1 Alarm B
Thermal 1 Alarm C
Thermal 1 Alarm
Thermal 1 PKP A
Thermal 1 PKP B
Thermal 1 PKP C
Thermal 1 PKP
Thermal 1 OP A
Thermal 1 OP B
Thermal 1 OP C
Thermal 1 OP
Thermal 2 Alarm A
Thermal 2 Alarm B
Thermal 2 Alarm C
Thermal 2 Alarm
Thermal 2 PKP A
Thermal 2 PKP B
Thermal 2 PKP C
Thermal 2 PKP
Thermal 2 OP A
Thermal 2 OP B
Thermal 2 OP C
Thermal 2 OP
Phase A of thermal overload 1 produced alarm
Phase B of thermal overload 1 produced alarm
Phase C of thermal overload 1 produced alarm
At least one phase of thermal overload 1 produced alarm
Phase A of thermal overload 1 has picked up
Phase B of thermal overload 1 has picked up
Phase C of thermal overload 1 has picked up
At least one phase of thermal overload 1 has picked up
Phase A of thermal overload 1 has operated
Phase B of thermal overload 1 has operated
Phase C of phase thermal overload 1 has operated
At least one phase of thermal overload 1 has operated
Phase A of thermal overload 2 produced alarm
Phase B of thermal overload 2 produced alarm
Phase C of thermal overload 2 produced alarm
At least one phase of thermal overload 2 produced alarm
Phase A of thermal overload 2 has picked up
Phase B of thermal overload 2 has picked up
Phase C of thermal overload 2 has picked up
At least one phase of thermal overload 2 has picked up
Phase A of thermal overload 2 has operated
Phase B of thermal overload 2 has operated
Phase C of phase thermal overload 2 has operated
At least one phase of thermal overload 2 has operated
Timed Undervoltage
Timed UV PKP
Timed UV PKP A
Timed UV PKP B
Timed UV PKP C
Timed UV OP
Timed UV OP A
Timed UV OP B
Timed UV OP C
Timed UV Curve OP
Timed UV Cnt OP
At least one phase of the Timed Undervoltage curve has picked up
Phase A of Timed Undervoltage has picked up
Phase B of Timed Undervoltage has picked up
Phase C of Timed Undervoltage has picked up
Timed Undervoltage has operated
Phase A of Timed Undervoltage has operated
Phase B of Timed Undervoltage has operated
Phase C of Timed Undervoltage has operated
At least one phase of Timed Undervoltage curve has operated
Timed Undervoltage counter has operated
Trip Bus
Trip Bus 1 PKP
Trip Bus 1 OP
Trip Bus 2 to 6
Asserted when the trip bus 1 element picks up
Asserted when the trip bus 1 element operates
The same set of operands as per Trip Bus 1
Trip Circuit Monitoring
TripCoil Mon 1 PKP
TripCoil Mon 1 OP
Trip Coil 1 Monitoring element has picked up.
Trip Coil 1 Monitoring element has operated for an amount of time greater
than the Close Circuit Monitor Pick-up Delay Time.
Undercurrent
Undercur[X] Alarm PKP
Undercur[X] Alarm OP
Undercur[X] Trip PKP
Undercur[X] Trip OP
Undercurrent[X] Alarm has picked up.
Undercurrent[X] Alarm has operated.
Undercurrent[X] Trip has picked up.
Undercurrent[X] Trip has operated.
Undervoltage Restoration UV Restore Init
Ph UV Restore PKP
Ph UV Restore OP
Aux UV Restore PKP
Aux UV Restore OP
Undervoltage restoration element has been initiated
Phase voltage of undervoltage restoration has element picked up
Phase voltage of undervoltage restoration element has operated
Auxiliary voltage of undervoltage restoration has element picked up
Auxiliary voltage of undervoltage restoration element has operated
ELEMENT
OPERANDS
EVENT DESCRIPTION
Summary of Contents for Multilin 850
Page 10: ...VIII 850 FEEDER PROTECTION SYSTEM INSTRUCTION MANUAL ...
Page 135: ...CHAPTER 3 INTERFACES SOFTWARE INTERFACE 850 FEEDER PROTECTION SYSTEM INSTRUCTION MANUAL 3 41 ...
Page 151: ...CHAPTER 3 INTERFACES SOFTWARE INTERFACE 850 FEEDER PROTECTION SYSTEM INSTRUCTION MANUAL 3 57 ...
Page 153: ...CHAPTER 3 INTERFACES SOFTWARE INTERFACE 850 FEEDER PROTECTION SYSTEM INSTRUCTION MANUAL 3 59 ...
Page 439: ...CHAPTER 7 MONITORING FUNCTIONS 850 FEEDER PROTECTION SYSTEM INSTRUCTION MANUAL 7 19 ...
Page 644: ...11 20 850 FEEDER PROTECTION SYSTEM INSTRUCTION MANUAL FLEXELEMENTS CHAPTER 11 METERING ...