GE Consumer Industrial
Electrical Distribution
Project Name:
Sludge Dewatering and Odor Control at Plant 1
Project No. P1-101
Specification:
Revision: 0
02/01/2016
16340
Medium Voltage Switchgear
Volume 1 of
3
Equipment Tag(s):
Shop Order
SWITCHGEAR SWGR-Q-A ( 15LSWGR901 )
111027-01
SWITCHGEAR SWGR-Q-B ( 15LSWGR902 )
111027-04
Manufacturer:
General Electric / Powell BPD
Address:
12305 Kurland Drive
City, State, Zip
Houston, TX 77034
Website:
www.geindustrial.com
GE Base Requisition #:
480-Z7612
Local Service Representative:
GE Energ- Engineering Services
Address:
3601 East LaPalma Ave.
City, State, Zip
Anaheim, CA 92806-2119
Phone:
888-GE4-SERV or 540-387-8617
Website:
www.geindustrial.com
Operation & Maintenance Manuals
g
imagination at work
Summary of Contents for Multilin 350
Page 59: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ...equipment not...
Page 94: ......
Page 95: ...the Fig 3 89184386...
Page 96: ...Fig 5 0209B4678 Rev 0 Fig 5 0209B4645 Rev 0...
Page 97: ...Figs...
Page 98: ...charge...
Page 99: ......
Page 100: ......
Page 101: ...Fig 7 0209B4649 1 Rev 1...
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ...copper and bushings...
Page 108: ......
Page 109: ...drawings particular...
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ...lower followed Fig 32...
Page 121: ......
Page 122: ...in against...
Page 123: ...ground sheath risers convenient...
Page 124: ...ground in...
Page 125: ......
Page 126: ...until it will be a...
Page 127: ...conductor DE APPARATUS THE FICE then...
Page 128: ...the Fig 40 891439D 1...
Page 129: ...MAKE THE FIG 42 891848...
Page 130: ...in...
Page 131: ...responsible policy Fig 45 8918438H...
Page 132: ...be enamel...
Page 133: ...sealer be this Fig 46 8042976...
Page 134: ......
Page 135: ...50 49...
Page 136: ...Fig 53 Fig 52 Fig 51 8043114...
Page 137: ...Fig 54...
Page 149: ......
Page 150: ...62 Intentionally Left Blank...
Page 151: ...63 Intentionally Left Blank...
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ...6...
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 166: ......
Page 174: ...Fig 4 Test Cabinet Wiring Diagram for 2 Trip C 8...
Page 175: ...Fig 5 Test Cabinet Wiring Diagram for 1 Trip Coil UVTD 9...
Page 186: ...10...
Page 187: ...11...