7–10
469 MOTOR MANAGEMENT RELAY – INSTRUCTION MANUAL
CHAPTER 7: TESTING
7.2.8
Output Relays
To verify the functionality of the output relays, perform the following steps:
Using the settings:
S13 TESTING
TEST OUTPUT RELAYS
FORCE OPERATION OF RELAYS:
“1 Trip”
Select and store values as per the table below, verifying operation
NOTE
Note
The 6 SERVICE relay is failsafe or energized normally. Operating the 6 SERVICE relay causes
it to de-energize.
FORCE
OPERATION
SETTINGS
EXPECTED MEASUREMENT
4
FOR SHORT
ACTUAL MEASUREMENT
4
FOR SHORT
1
2
3
4
5
6
1
2
3
4
5
6
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
1 TRIP
4
4
4
4
4
4
2 AUXILIARY
4
4
4
4
4
4
3 AUXILIARY
4
4
4
4
4
4
4 ALARM
4
4
4
4
4
4
5 BLOCK START
4
4
4
4
4
4
6 SERVICE
4
4
4
4
4
4
All Relays
4
4
4
4
4
4
No Relays
4
4
4
4
4
4
Summary of Contents for Masoneilan 469 Series
Page 4: ......
Page 92: ...3 28 469 MOTOR MANAGEMENT RELAY INSTRUCTION MANUAL CHAPTER 3 INSTALLATION ...
Page 256: ...5 112 469 MOTOR MANAGEMENT RELAY INSTRUCTION MANUAL CHAPTER 5 SETTINGS ...
Page 298: ...6 42 469 MOTOR MANAGEMENT RELAY INSTRUCTION MANUAL CHAPTER 6 ACTUAL VALUES ...
Page 321: ...CHAPTER 8 APPENDIX 469 MOTOR MANAGEMENT RELAY INSTRUCTION MANUAL 8 9 808712A1 CDR ...
Page 330: ...8 18 469 MOTOR MANAGEMENT RELAY INSTRUCTION MANUAL CHAPTER 8 APPENDIX ...