2-2-2 Electrical requirements (continued)
Site circuit breaker
It is recommended that the branch circuit breaker for the LOGIQ Totus be readily accessible.
Site power outlets
A dedicated AC power outlet must be within reach of the LOGIQ Totus without extension cords. Other
outlets adequate for the external peripherals, medical and test equipment needed to support this
LOGIQ Totus must also be present within 1 m (3.2 ft.) of the LOGIQ Totus. Electrical installation must
meet all current local, state, and national electrical codes.
LOGIQ Totus power plug
If the LOGIQ Totus arrives without a power plug, or with the wrong plug, you must contact your GE
HealthCare dealer or the installation engineer must supply what is locally required.
Power stability requirements
Voltage drop-out
Max 10 ms.
Power transients
(all applications)
Less than 25% of nominal peak voltage for less than 1 ms for any type of transient, including line
frequency, synchronous, asynchronous, or aperiodic transients.
CAUTION
RISK OF POWER OUTAGE
THE LOGIQ Totus REQUIRES A DEDICATED SINGLE BRANCH CIRCUIT. TO AVOID CIRCUIT
OVERLOAD AND POSSIBLE LOSS OF CRITICAL CARE EQUIPMENT, MAKE SURE YOU DO NOT
HAVE ANY OTHER EQUIPMENT OPERATING ON THE SAME CIRCUIT.
Summary of Contents for LOGIQ Totus
Page 2: ......
Page 4: ...GE HealthCare CONFIDENTIAL Direction 5936427 Rev 1 LOGIQ Totus Basic Service Manual ii...
Page 5: ...GE HealthCare CONFIDENTIAL Direction 5936427 Rev 1 LOGIQ Totus Basic Service Manual iii...
Page 6: ...GE HealthCare CONFIDENTIAL Direction 5936427 Rev 1 LOGIQ Totus Basic Service Manual iv...
Page 643: ......