GE HealthCare CONFIDENTIAL
Direction
5936427
, Rev. 1
LOGIQ Totus
Basic Service Manual
10 - 34
Section 10-7 - When There’s Too Much Leakage Current...
10-7-5
New Unit
If the leakage current measurement tests fail on a new unit and if situation cannot be corrected, submit
a Safety Failure Report to document the system problem. Remove unit from operation.
ELECTRICAL SAFETY
Outlet and Ground Continuity test
Earth leakage current test
Enclosure leakage current test
Table 10-18
Outlet/Ground Continuity
Max Value
Allowed
Value
Measured
OK?
Comments
Outlet (correct ground & wiring config.)
N/A
N/A
System Ground Continuity
0.2 Ohm
Table 10-19
Tester Neutral Tester Polarity
Switch
Max Value Allowed
Value
Measured
OK?
Comments
Enter Name of tested peripheral here:
Closed
Normal
0.3mA(USA)/0.5mA(Others)
Closed
Reversed
0.3mA(USA)/0.5mA(Others)
Open
Normal
1mA
Open
Reversed
1mA
Table 10-20
Tester
Neutral
Tester
Polarity
Switch
Protective
Earth
Switch
Max Value
Allowed
Test 1
Wheel
Test 2
LCD
Optional
Test 3
Optional
Test 4
OK? Comments
Enter Name of tested peripheral here:
Closed
Normal
Closed
0.1mA(USA)/
0.1mA(Others)
Closed
Normal
Open
0.3mA(USA)/
0.5mA(Others)
Closed
Reversed Closed
0.1mA(USA)/
0.1mA(Others)
Closed
Reversed Open
0.3mA(USA)/
0.5mA(Others)
Open
Normal
Closed
0.5mA(USA)/
0.5mA(Others)
Open
Reversed Closed
0.5mA(USA)/
0.5mA(Others)
Summary of Contents for LOGIQ Totus
Page 2: ......
Page 4: ...GE HealthCare CONFIDENTIAL Direction 5936427 Rev 1 LOGIQ Totus Basic Service Manual ii...
Page 5: ...GE HealthCare CONFIDENTIAL Direction 5936427 Rev 1 LOGIQ Totus Basic Service Manual iii...
Page 6: ...GE HealthCare CONFIDENTIAL Direction 5936427 Rev 1 LOGIQ Totus Basic Service Manual iv...
Page 643: ......