GE H
EALTHCARE
D
IRECTION
2286865, R
EVISION
14
LOGIQ™ 7 S
ERVICE
M
ANUAL
8-34
Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later)
8-2-10-1
Peripheral Device Connection/Setup
1.) Connect all of the peripheral devices to the scanner.
2.) Power ON all of the peripheral devices.
3.) Verify that the system boots up with no error. (It will take a few minutes.)
4.) Set up customer data saved at 8-2-6 Pre-installation Procedures.
8-2-10-2
Confirmation of the software version
1.) Touch the
Utility
button on the Touch Panel.
NOTE:
The Operator Login window appears. Select
adm
(Administrator) for the Operator field.
Adm (Administrator) will be shown in the Operator field as default.
Enter the password which is configured already (or the password might not be necessary).
Then click on
Log on
.
Figure 8-90 Utility
Figure 8-91 Log on
Press
Utility
button.
Summary of Contents for LOGIQ 7
Page 2: ......
Page 9: ... vii GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL ...
Page 12: ...GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL x ...
Page 116: ...GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL 4 32 Section 4 7 Site Log ...
Page 393: ......