GE H
EALTHCARE
D
IRECTION
2286865, R
EVISION
14
LOGIQ™ 7 S
ERVICE
M
ANUAL
4-22
Section 4-2 - General Procedure
4-3-5
ECG Checks
Connect the ECG Harness and check:
4-3-6
Cineloop Check
For activating Cine, creating and storing Cine Loops, and information on the Cine Timeline, refer to the
LOGIQ™ 7 Quick Guide.
4-3-7
Backend Processor Checks
•
If all the previous tests have been passed successfully, the backend processor is most likely OK.
•
See Service Platform.
•
If the system seems to be operating erratically, please refer to Chapter 7, Diagnostic/
Troubleshooting.
4-3-8
Probe/Connectors Usage (QG)
The LOGIQ™ 7 Quick Guide, provides information on connecting, activating, deactivating and
disconnecting probes.
Table 4-4 ECG Control
Step
Task
Expected Result(s)
1
Connect the ECG at the Connector on the
Front of the system
It will display a curve along the bottom edge
of the image sector
Summary of Contents for LOGIQ 7
Page 2: ......
Page 9: ... vii GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL ...
Page 12: ...GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL x ...
Page 116: ...GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL 4 32 Section 4 7 Site Log ...
Page 393: ......