Preliminary
While every precaution has been taken to ensure the completeness
and accuracy of this document,
GE Digital Energy
•
IMV
assumes
no responsability nor liability for damages or errors resulting from the
the use of the information contained in this document.
After unpacking the UPS(s) check carefully for any visible
damages, which could have occurred during transport.
Do never try to startup a UPS which shows mechanical or
electrical damage. Contact your next service centre for help.
The following material accompanies the UPS:
•
The UPS operating manual.
•
The PIOR of this UPS. (Putting into operation report)
•
4 Bottom panels which are removed for transport.
•
A plastic bag, containing: 3 Battery fuses, 6 cable ties
for the fastening of input and output cables and
5 Eyelet terminals for the connection of Neutral and
Earth cables to the Input / Output section of the UPS.
The description for the installation and startup of the UPS is
based on a STANDARD CONFIGURATION, i.e. single UPS
with integrated Battery and single Mains (Utility) input.
A description of procedures in case of a parallel system or
external Batteries follows seperately this basic instructions.
Before paralleling UPS’s they must have been running as
single units.
Description of the install procedure for optional equipment:
•
Separate Mains input: See operating manual, chapter
4.8.2., page 31.
•
External Battery cabinet: See operating manual
chapter 7.2, page 65.
For a description of procedure for the paralleling of UPS’s,
refer to the document:
“Installation guide for the RPA kit”