5-6
L60 Line Phase Comparison Relay
GE Multilin
5.1 OVERVIEW
5 SETTINGS
5
Figure 5–1: BREAKER-AND-A-HALF SCHEME
If the relay contains one CT/VT module, then only SRC1 is available and this will be used by 87PC function. If the relay
contains two CT/VT modules, the following table explains how to configure the sources for full functionality.
Table 5–1: SOURCE CONFIGURATION FOR PHASE COMPARISON
FUNCTION
CT/VT MODULE 1 (TYPE 8P)
CT/VT MODULE 1 (TYPE 8F)
SRC 1
SRC 2
SRC 3
SRC 4
Phase current
F1 to F3 CT channels
(used for 87PC first current
and Breaker Failure 1)
Not available
L1 to L3 CT channels
(used for 87PC second
current and Breaker
Failure 2). This source is
configurable only if a
second CT/VT module is
ordered.
Sum of F1:F3 and L1:L3
(used for distance and
overcurrent)
Ground current
F1 (Ground overcurrent)
Not available
---
---
Phase voltage
Not available
Not available
---
Three-phase line VT for
distance and
synchrocheck
Auxiliary voltage
Not available
Not available
Single-phase bus VT for
synchrocheck
---
P
ROTECTED
L
I
NE
VT
2
CT
2
C
B2
C
B1
CT
1
VT
1
1
P
H
L
60
P
H
AS
E
COMPAR
I
SO
N
Summary of Contents for L60
Page 2: ......
Page 4: ......
Page 24: ...1 14 L60 Line Phase Comparison Relay GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1...
Page 42: ...2 18 L60 Line Phase Comparison Relay GE Multilin 2 2 SPECIFICATIONS 2 PRODUCT DESCRIPTION 2...
Page 470: ...D 10 L60 Line Phase Comparison Relay GE Multilin D 1 PROTOCOL APPENDIXD D...
Page 482: ...E 12 L60 Line Phase Comparison Relay GE Multilin E 2 DNP POINT LISTS APPENDIXE E...
Page 498: ...x L60 Line Phase Comparison Relay GE Multilin INDEX Z ZERO SEQUENCE CORE BALANCE 3 9...