1-8
L60 Line Phase Comparison Relay
GE Multilin
1.3 ENERVISTA UR SETUP SOFTWARE
1 GETTING STARTED
1
10. Click
OK
when the relay order code has been received. The new device will be added to the Site List window (or
Online window) located in the top left corner of the main enerVista UR Setup window.
The Site Device has now been configured for Ethernet communications. Proceed to Section c) below to begin communica-
tions.
b) CONFIGURING AN RS232 CONNECTION
Before starting, verify that the RS232 serial cable is properly connected to the RS232 port on the front panel of the relay.
1.
Install and start the latest version of the enerVista UR Setup software (available from the GE enerVista CD or online
from
http://www.GEindustrial.com/multilin
2.
Select the
Device Setup
button to open the Device Setup window and click the
Add Site
button to define a new site.
3.
Enter the desired site name in the “Site Name” field. If desired, a short description of site can also be entered along
with the display order of devices defined for the site. Click the
OK
button when complete.
4.
The new site will appear in the upper-left list in the enerVista UR Setup window. Click on the new site name and then
click the
Device Setup
button to re-open the Device Setup window.
5.
Click the
Add Device
button to define the new device.
6.
Enter the desired name in the “Device Name” field and a description (optional) of the site.
7.
Select “Serial” from the
Interface
drop-down list. This will display a number of interface parameters that must be
entered for proper serial communications.
•
Enter the relay slave address and COM port values (from the
SETTINGS PRODUCT SETUP
COMMUNICATIONS
SERIAL PORTS
menu) in the “Slave Address” and “COM Port” fields.
•
Enter the physical communications parameters (baud rate and parity settings) in their respective fields.
8.
Click the
Read Order Code
button to connect to the UR device and upload the order code. If an communications error
occurs, ensure that the enerVista UR Setup serial communications values entered in the previous step correspond to
the relay setting values.
9.
Click “OK” when the relay order code has been received. The new device will be added to the Site List window (or
Online window) located in the top left corner of the main enerVista UR Setup window.
The Site Device has now been configured for RS232 communications. Proceed to Section c) Connecting to the Relay
below to begin communications.
c) CONNECTING TO THE RELAY
1.
Open the Display Properties window through the Site List tree as shown below:
Summary of Contents for L60
Page 2: ......
Page 4: ......
Page 24: ...1 14 L60 Line Phase Comparison Relay GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1...
Page 42: ...2 18 L60 Line Phase Comparison Relay GE Multilin 2 2 SPECIFICATIONS 2 PRODUCT DESCRIPTION 2...
Page 470: ...D 10 L60 Line Phase Comparison Relay GE Multilin D 1 PROTOCOL APPENDIXD D...
Page 482: ...E 12 L60 Line Phase Comparison Relay GE Multilin E 2 DNP POINT LISTS APPENDIXE E...
Page 498: ...x L60 Line Phase Comparison Relay GE Multilin INDEX Z ZERO SEQUENCE CORE BALANCE 3 9...