![GE Innova 2100-IQ Preinstallation Manual Download Page 50](http://html1.mh-extra.com/html/ge/innova-2100-iq/innova-2100-iq_preinstallation-manual_4332925050.webp)
Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
Direction 5314528-2-1EN, Revision 1
•
SEM (Super Eco Mode) permitting the maximum energy saving.
Table 3-4: Fluoro UPS CE
Losses
Cooling air flow
VFI
SEM
VFI
SEM
2.14 kW
0.64 kW
625 m3/h
190 m3/h
Table 3-5: Fluoro UPS UL
Losses
Cooling air flow
BTU / hr
kW
CFM
m3/h
6751
1.98
301
512
If installed in the technical room, the UPS may impact on it’s layout. It may also
be installed in a separate room. This depends on hospital constraints, local
regulations or EHS rules. Clearance, weight of UPS, airflow and cooling system
should be adapted for the UPS.
ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND
CONNECTING THE CABLES FROM THE PDB TO THE UPS AND CONFIGURING
THE PDB IN BYPASS MODE. GEHC IS RESPONSIBLE FOR POWERING ON THE
SYSTEM WITH THE UPS IN BYPASS MODE. GEDE IS RESPONSIBLE FOR UPS
COMMISSIONING.
The Fluoro UPS can be installed either in an Electrical Local with restricted access
or in the innova technical room as per local regulations.
Make sure that local regulations have been applied for the installation of the Fluoro
UPS (dedicated room/fire detection etc.)
NOTE:
Refer to the UPS vendor Service manual Installation Guide SG Serie 10, 20, 30 & 40 kVA for
more details
2.2.3 IVUS Option
2.2.3.1 Environmental Limitations in Use (room climate)
Humidity (non condensing) :
30 - 80 %
Temperature (at 20% Relative Humidity ) :
15 - 32 C
(60 - 90 F)
Altitude (Relative to see level) :
max 3048 m
(max 10000 ft)
50
2 Environmental Requirements/Limitations
Summary of Contents for Innova 2100-IQ
Page 219: ......