background image

Hardware Installation

 

14 

PACSystems* RXi Box IPC 

GFK-2785C

 

Mounting Procedures 

Using the optional ICRXIACCBPL Backplate, the IPC can be mounted on a DIN rail or a panel. You 
can also mount the IPC directly onto a panel without using a Backplate. 

The IPC has four captive machine screws in its base for attaching the unit to the Backplate or 
panel. 

Mounting the IPC on a DIN Rail 

You will need the following: 

One 2.5mm hex driver (included with the RXi IPC) 

One flat

head

 (or large Phillips) screwdriver 

One Backplate, ICRXIACCBPL 

When installed on the Backplate, the IPC mounts to a standard EN 50022 DIN rail with the 
following dimensions. 

Backplate Orientation 

The Backplate should be installed with the static latches on top and the spring-loaded latches at 
the bottom. 

Backplate, Rear View 

Static Latches (Top) 

Spring-loaded Latches (Bottom) 

Summary of Contents for IC690ACC001

Page 1: ...GE Intelligent Platforms Industrial Computer Products PACSystems RXi Box IPC User s Manual GFK 2785C May 2014 ...

Page 2: ...ade to be accurate the information contained herein does not purport to cover all details or variations in hardware or software nor to provide for every possible contingency in connection with installation operation or maintenance Features may be described herein which are not present in all hardware and software systems GE Intelligent Platforms assumes no obligation of notice to holders of this d...

Page 3: ... free 800 option is unavailable Technical Support Email support ip ge com Customer Care Email customercare ip ge com Primary language of support English Europe the Middle East and Africa Online Technical Support http support ge ip com Phone 800 1 433 2682 EMEA Direct Dial 420 23 901 5850 if toll free 800 option is unavailable or dialing from a mobile telephone Technical Support Email support emea ...

Page 4: ...stallation Guidelines 11 Grounding 12 Mounting Orientation 12 Dimensions and Clearances for Installation 13 Mounting Procedures 14 Mounting the IPC on a DIN Rail 14 Mounting the IPC on a Panel Using a Backplate 18 Mounting the IPC Directly on a Panel 19 Replacing the RTC Battery 21 Disabling the Off Switch 23 Connectors and Cabling 25 Input Power 25 Ethernet Communication Ports 26 Serial Communica...

Page 5: ......

Page 6: ...ivity and allows you to maximize application reusability supporting your current and future needs for business growth These small form factor industrial PCs provide a number of features to support computing applications in demanding environments Dual core 1 0 GHz VIA processor Multiple Gigabit Ethernet interfaces provide network implementation flexibility Built in Data Storage Internal disks provi...

Page 7: ...mm x 81 3mm 7 55 in x 4 55 in x 3 2 in Backplate 226 mm x 137 mm x 12 mm 8 90 in x 5 39 in x 0 47 in Weight IPC without Backplate 1 814 Kg 4 lbs Backplate 0 454 Kg 1 lb Processor 1 0 GHz VIA Eden dual core processor RAM 4GB DDR3 Floating point 64 bit Non volatile storage 32GB mSATA SSD or 250GB SATA drive Non volatile storage NVS can retain data indefinitely without loss of data integrity Time of ...

Page 8: ...er than 50 C 122 F the unit must be installed in a restricted access area as defined below Warning If the Box IPC is operating in ambient temperatures greater than 50 C 122 F its exterior temperatures may be too hot to touch safely To avoid burn hazards the unit must be installed in a restricted access area as defined by Access can only be gained by service persons or by users who have been instru...

Page 9: ...ms RXi Box IPC GFK 2785C RXi Box IPC User Features Power On Off Switch and Status Indicator Indicators SD Card Slot Audio Connector Connectors Blue blinking Booting Blue slow fade S3 Sleep Green solid Running Red solid Fault ...

Page 10: ...ate is S1 CPU Stop Clock The default settings send IPC to sleep state S1 ICRXIBN7x000A The ring LED stays green while the IPC is in Sleep State S1 The ring LED turns off while the IPC is in Sleep State S3 ICRXIBN7x001A The ring LED stays green while the IPC is in Sleep State S1 The ring LED fades blue while the IPC is in Sleep State S3 Forced Shut down Caution Use this option only if the operating...

Page 11: ...on press if power is cycled without a clean Win7 shutdown For ICRXIBN7x000A CA or earlier unit always operates in Last state despite UEFI setting Sleep Mode Setting Options and Ring LED Status Indicator Operation UEFI Hibernation Setting UEFI Sleep State Setting Start Shutdown Sleep Power Button to Sleep Timeout to Sleep Recovers by pressing Disabled S1 CPU Stop Clock Solid Green Solid Green Solid...

Page 12: ... are required if you need to contact Customer Care during the warranty period All shipping containers and all packing material should be saved should it be necessary to transport or ship any part of the system Verify that all components of the system have been received and that they agree with your order If the system received does not agree with your order contact Customer Care If you need techni...

Page 13: ...B compatible mouse 4 Power up the unit and check whether any concealed damage has been caused by incorrect transportation operating storage conditions or handling For ICRXIBN7x000A CA or earlier units only to power up the unit press the Power On Off switch for at least second ICRXIBN7x001A will start up once power is applied without the need to depress the On Off switch If you notice any damage re...

Page 14: ...onnect the IPC to your Ethernet network Note For Ethernet port and cabling information refer to chapter 4 Pinging TCP IP Ethernet Interfaces on the Network PING is the name of a program used on TCP IP networks to test reachability of destinations by sending them an ICMP echo request message and waiting for a reply Most nodes on TCP IP networks including the PACSystems Ethernet Interface implement ...

Page 15: ...wn 2 To completely shut down the IPC turn off or remove the power supplying the IPC Disabling Operating System Shutdown ICRXIBN7xxxxx Models The current On Off button operation requires only a 100ms press to begin a controlled Windows shutdown You can change this setting in Windows to require pressing the On Off switch for 4 seconds to immediately perform a hard shutdown that forces the unit off w...

Page 16: ... must be mounted with its cooling fins vertical to ensure adequate airflow The panel should be capable of supporting the weight of the industrial computer without distortion to the panel Adequate airflow around the exterior of the unit is essential to maintain safe interior temperature of the unit Inlets and outlets must not be obstructed For details see page 13 You may need to allow more space fo...

Page 17: ... 2 and should be as short as possible If using the ICRXIACCBPL to mount the Box IPC add a ground wire from the M8 threaded hole on the metal DIN Backplate M8 screw included to protective earth The frame ground connection on the power plug must be a 16 to 28 AWG 1 31to 0 08mm 2 wire with shortest possible length It is recommended that these ground wires terminate in a star wiring pattern at the sam...

Page 18: ...sions IPC 191 8 mm x 115 6 mm x 81 3 mm 7 55 in x 4 55 in x 3 2 in Backplate 226 mm x 137 mm x 12 mm 8 90 in x 5 39 in x 0 47 in Minimum clearances for heat dissipation Each side 51mm 2 inches Top and bottom 127mm 5 inches 51 mm 2 51 mm 2 127 mm 5 127 mm 5 115 6 mm 4 55 191 8 mm 7 55 226 mm 8 90 137 mm 5 39 ...

Page 19: ...unit to the Backplate or panel Mounting the IPC on a DIN Rail You will need the following One 2 5mm hex driver included with the RXi IPC One flathead or large Phillips screwdriver One Backplate ICRXIACCBPL When installed on the Backplate the IPC mounts to a standard EN 50022 DIN rail with the following dimensions Backplate Orientation The Backplate should be installed with the static latches on to...

Page 20: ...tallation GFK 2785C PACSystems RXi Box IPC 15 1 Install the IPC on the Backplate a Place the IPC and Backplate on a flat surface b Loosen the four captive screws on the IPC s front panel and remove the front panel ...

Page 21: ...e Backplate static latches on top For Backplate orientation refer to page 14 d Align the IPC s four mounting screws with the mounting holes in the Backplate e Using the hex driver tighten the mounting screws f Replace the front panel on the IPC and use the screwdriver to hand tighten the four captive screws to secure it ...

Page 22: ...with the top of the unit rotated approximately 20º from the panel b Engage the spring loaded latches at the bottom of the black DIN rail clip attached to the adaptor on the DIN rail c Rotate the unit up and press it upward to engage the top static latches with the rail d Press the unit into place a b c ...

Page 23: ... One ICRXIACCBPL Backplate 1 Install the IPC on the Backplate See step 1 on page 14 2 Drill four holes in the panel based on screw selection using the spacing shown in the following drawing if holes are tapped recommended minimum panel thickness should be equal to thread diameter Drilling Pattern for Panel Mounting Using a Backplate 208 3mm 8 2 119 4mm 4 7 3 Using the four mounting screws attach t...

Page 24: ... 29 0 116 drill bit and M4x0 7 tap The IPC has four captive machine screws in its base for attaching the unit to the panel 1 Drill four mounting holes using the spacing shown in the following drawing and tap M4x0 7 thru Drilling Pattern for Direct Panel Mounting 171 7mm 6 76 95 5mm 3 76 M4 Thru 2 Place the IPC on a flat surface 3 Loosen the four captive screws on the IPC s front panel and remove t...

Page 25: ... RXi Box IPC GFK 2785C 4 Align the IPC s four mounting screws with the mounting holes in the panel 5 Using the hex driver hand tighten the mounting screws 6 Replace the front panel on the IPC and hand tighten the four screws to secure it ...

Page 26: ...ions when opening the IPC enclosure Wear a properly functioning antistatic strap and be sure that you are fully grounded Never touch any components inside the IPC unless you are wearing an antistatic strap The IPC should be placed on a static safe surface facilitated by antistatic mats Extra caution should be taken in cold dry weather when static charges can easily build up You will need the follo...

Page 27: ...roper disposal refer to Battery Disposal document 82A1540 MD01 6 Install the new battery in the retaining clip The replacement battery must be IC690ACC001 from GE Intelligent Platforms Install the battery with the positive side up That is with the side away from the circuit board The coin cell must be inserted at an angle to go under the positive terminal clip and then slid into the carrier and sn...

Page 28: ...etting affects only the ability to power down the unit You can still use the On Off switch to power on the unit You will need the following One flat or large Phillips screwdriver 1 Turn off or remove the power supplying the IPC 2 Loosen the four captive screws on the IPC s front panel and remove the front panel 3 Move the SW1 1 switch from the default Off position to the On position 4 Replace the ...

Page 29: ...Hardware Installation 24 PACSystems RXi Box IPC GFK 2785C ...

Page 30: ...nt 2 7 6 m 25 ft Yes1 SD Secure Digital slot Maintenance 3 NA NA Audio Maintenance 3 2 m 6 5 ft No 1 Shielding is required to be in compliance with the standards identified in Appendix A 2 Can be permanently connected while the system is running 3 Intended only for temporary connection Input Power The IPC requires 24VDC 18 32V range 48W power supply Class 2 or LPS The IPC is supplied with a Phoeni...

Page 31: ...pes shielded twisted pair STP cable is required to maintain CE compliance 10BASE T Two pairs of wire are used one for transmission and the other for receive 100BASE TX Two pairs of wire are used one for transmission and the other for receive 1000BASE T Four pairs of wire are used for simultaneous transmission and receive in both directions Ethernet Port Pin Assignments Pin No 10BASE T 100BASE TX 1...

Page 32: ...ctor shell provides frame ground To reduce interference shielded cables are required The Serial Communication Port connector is mapped as follows ICRXIBN7x000A CA versions and earlier COM2 ICRXIBN7x001A COM1 USB Ports Two ports are provided for connection of USB 2 0 compatible devices such as a keyboard mouse serial communications or data storage device For maximum cable length refer to page 25 Do...

Page 33: ...VDC 1 10 SGND 11 NC 12 SDA 13 H SYNC 14 V SYNC 15 SCL 1 There is a 1 1A self resetting fuse on the 5V signal pin 9 SD Secure Digital Card Slot The IPC accommodates a user supplied SD card for auxiliary storage Note The SD card slot is defined as a maintenance port and is intended to be used only as a temporary connection Audio Jack The IPC provides an Audio out Microphone in 3 5mm four pin TRRS co...

Page 34: ...stem refer to http windows microsoft com for instructions RXi Box IPC Device Drivers The drivers and the instructions for installing them are available on the GE Intelligent Platforms Support website http support ge ip com The drivers consist of Ethernet drivers two SD card reader driver VIA Graphics driver Note This improves resolution of the standard Windows graphics driver and is necessary to s...

Page 35: ...Retain it in a secure location Use this drive to recover in the event of drive failure The procedure is as follows 1 Power down the RXi system 2 Insert the USB recovery Flash Drive in any available USB port 3 Power on system a As soon as the system turns on press the F7 key to display the boot device select menu b Use the arrow keys too select TOSHIBA MSFT NORB press Enter to select ...

Page 36: ...minute Wait for the RXi recovery screen to appear 5 Click the Start WES7 Recovery button Note clicking the Exit the Program button will abort the recovery and reboot the RXi computer 6 A warning message will be displayed Click OK to continue the recovery and image the system hard drive The drive will be reformatted in the process ...

Page 37: ... Box IPC GFK 2785C 7 The image load process will be displayed as follows 8 When the image load completes the system will prompt to remove the USB drive 9 Remove the USB drive and click OK The system will reboot as a new factory install ...

Page 38: ...p LED will blink on red and then shut off quickly while the entire unit shuts down The Power On Off LED turns off at the same time To recover let the Box IPC cool and then press the Power On Off button to restart The Box IPC will return immediately to what it was doing when shutdown occurred If you initiate a complete power cycle instead of restarting immediately the Box IPC performs the normal po...

Page 39: ...System Recovery 34 PACSystems RXi Box IPC GFK 2785C ...

Page 40: ...rtifications and Installation Guidelines for Conformance This appendix describes the compliance markings that appear on PACSystems RXi industrial computer products and the corresponding standards to which the products have been certified Appendix A ...

Page 41: ...accordance with European Directives Refer to Declaration of Conformity found at http www ge ip com for a complete list of approved products Electromagnetic Compatibility Directive European EMC for Industrial Control Equipment Self Declaration in accordance with European Directives Refer to Declaration of Conformity found at http www ge ip com for a complete list of approved products Note The agenc...

Page 42: ...m 1 0 2 0 GHz 1 V m 2 0 2 7 GHz Fast Transient EN 61000 4 4 2 DC Input 2 kV 33 nF direct Video and Ethernet ports shielded 1 1 kV capacitive clamp RS 232 port unshielded 1 1 kV capacitive clamp Surge EN 61000 4 5 2 DC Input 0 5 kV 12 ohms CM 0 5 kV 2 ohms DM Ethernet port shielded 1 0 kV 2 ohms CM Conducted RF Immunity EN 61000 4 6 2 DC Input 10 V CDN Video and Ethernet ports shielded 10 V current...

Page 43: ...nvironment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his or her own expense Note Chan...

Page 44: ...mining if already used 9 LEDs Ethernet port 5 26 IPC status 5 module 4 power 5 6 Mounting dimensions 13 DIN rail 14 orientation 12 panel direct 19 panel with a Backplate 18 space required 13 Network communications configuration 9 Part numbers 2 Pinging the TCP IP interfaces on the network 9 Ports audio jack 28 Ethernet 26 overview 4 SD card slot 28 serial 27 USB 27 video 28 Power connecting 8 25 d...

Reviews: