User manual IC220SDL953 - September 2011
GFK-2731
B 2
Checklists for the
IC220SDL953 module
B 2.1
Planning
Checklist for planning the use of the safety module
Device type/equipment identification
Version: HW/FW/FW
Date
Author
Test engineer
Remark
No. Requirement (mandatory)
Yes
Remark
1
Has the current module user manual been used as the basis for planning?
Revision:
2
Does the planned use correspond to the intended use?
3
Has the technical data of the module been observed?
4
Are the actuators approved for connection to the module (according to the
technical data and parameterization options)?
5
Has the voltage supply been planned according to the specifications for the
protective extra-low voltage in accordance with PELV?
6
Has the power supply of U
M
and U
S
from a power supply unit been planned?
7
Is external fuse protection of the module planned (according to the
specifications in this user manual for supply voltage U
M
)?
8
Is use in a control cabinet (IP54) planned?
9
Are measures planned to prevent simple manipulation?
10
Are measures planned to prevent connectors being mixed up?
11
Are requirements for the actuators and cable installation observed according
to the SIL/SIL CL CL/Cat./PL to be achieved and is the corresponding
implementation planned?
12
Are the specifications for the address assignment for the islands specified?
13
Are the specifications for the parameterization for each channel specified?
14
Are test intervals specified for testing the shutdown capability of the actuators,
if this is required to achieve a SIL/SIL CL/Cat./PL?
15
Has it been ensured that any person intentionally starting hazardous
movements has a direct view of the danger zone?
16
Have test intervals been defined?
17
Has the switch-off delay for stop category 1 been observed in the calculation of
the total response time for the machine/system?
No. Requirement (optional)
Yes No Remark
18
Have specifications for assembly and electrical installation been defined (e.g.,
EPLAN) and communicated to the relevant personnel?
19
Have specifications for startup been defined and communicated to the relevant
personnel?
Date
Signature (author)
Date
Signature (test engineer)