D
IRECTION
5771498-100, R
EVISION
6
V
ENUE
™ S
ERVICE
M
ANUAL
Chapter 2 - Site Preparations
2-1
P R E L I M I N A R Y
Chapter 2
Site Preparations
Section 2-1
Overview
2-1-1
Purpose of Chapter 2
This chapter provides the information required to plan and prepare for the setup of a Venue™
ultrasound unit. Included are descriptions of the electrical and facility requirements that must be met by
the purchaser. A worksheet is provided at the end of this chapter (see
on page 2-13) to help
ensure that all the required network information is available, prior to setup.
Summary of Contents for H45051VN
Page 477: ......