Chapter 3: Calibration and Maintenance
Special Tools
Service Manual
3-3
3.2 Special Tools
The following tools (or their functional equivalents) are required to complete the recommended service
procedures:
•
Digital Multimeter, 4-1/2 digit
•
Leakage Current Tester
•
PLCC Extractor for removing socketed chips
•
Static Control Work Station (recommended)
•
Light gray touch-up paint (Munsell .16GY8.56-0.44 chroma), 18 ml .................................... 6600-0714-200
•
Servo Humidity Calibration Kit............................................................................................................... 6600-0048-850
•
5 kilogram (5000 gram) Certified Test Weight ................................................................................ 6600-0209-800
3.3 System Calibration
Note:
If only performing line voltage calibration, follow instructions in section
Important:
Be sure to perform System Calibration after replacing a control board.
1.
Turn power off.
2.
Remove electrical enclosure back panel.
3.
Unplug the temperature sensors from J1, J4 and J2 on the control board.
4.
Move jumper JP1 to the CAL MODE position on the control board (refer to
“Figure 3-1 Control Board Test
). Be sure to orient the jumper correctly so pins 5-6 and 7-8 are shorted.
5.
Turn power on.
After running the power-up testing a progress bar is displayed at the top of the screen.
Upon completion, the calibrate mode screen appears.
6.
Using a 4 ½ digit DVM (capable of measuring to 0.1 millivolt) measure VREF at TP1, pins 1 and 6 (pin 6 is
ground) on the control board. Measure to the nearest 0.1 millivolt. (Typical voltage reading will be
1.2350.)
7.
Once "Enter reference voltages" is displayed, enter the VREF using the keypad.
8.
Touch Enter.
9.
Measure the Mains Voltage at the AC connectors at the bottom of the electronics enclosure cover.
10.
Once "Enter mains voltages" is displayed enter the voltage using the keypad.
11.
Touch Enter.
12.
When complete, Calibration DONE appears across the top of screen. Do not shut off the device until the
DONE message is displayed or the new calibration values will not be stored.
13.
If the message “Mains voltage calibration failed. Please enter the mains voltage again” appears this
indicates the entered line voltage is 20% different than the measured value (not the nominal value).
14.
Power down the device and move the calibrate jumper to the NORMAL MODE position. Be sure to orient
the jumper correctly so pins 1-2 and 3-4 are shorted.
15.
System and line voltage calibration are complete.
16.
Proceed to humidifier calibration.
Summary of Contents for Giraffe OmniBed Carestation CS1
Page 4: ...RH 2 Service Manual ...
Page 24: ...Service Language Disclaimer viii Service Manual ...
Page 40: ...Safety and Regulatory Information User Responsibility xxiv Service Manual ...
Page 44: ...Chapter 1 Functional Description Control Board 1 2 Service Manual FIGURE 1 1 Block Diagram ...
Page 74: ...Chapter 3 Calibration and Maintenance Line Voltage Calibration 3 12 Service Manual ...
Page 82: ...Chapter 4 Understanding the Service Interface Upgrade 4 8 Service Manual ...
Page 110: ...Chapter 5 Troubleshooting Diagnostic Readings 5 28 Service Manual ...
Page 211: ...Chapter 7 Repair Procedures Display Harness Connections Service Manual 7 75 ...
Page 212: ...Chapter 7 Repair Procedures Display Harness Connections 7 76 Service Manual ...
Page 294: ...Chapter 8 Illustrated Parts Wiring Diagrams 8 82 Service Manual ...
Page 296: ...Appendix A Compartment and Skin Probe Characteristics A 2 Service Manual ...
Page 304: ...Appendix C RS 232 Serial Data Nurse Call C 4 Service Manual ...