![GE Ettan IPGphor 3 Operating Instructions Manual Download Page 62](http://html.mh-extra.com/html/ge/ettan-ipgphor-3/ettan-ipgphor-3_operating-instructions-manual_128030062.webp)
Place sample cups
Follow the instructions below to place the sample cups.
Action
Step
Position a strip of sample cups in the appropriate position, for example ~1
cm from the end of the gel portion of the IPG strip. Do NOT place the cup
with the feet over a center protrusion.
1
Ensure that the feet of the cups are properly seated at the bottom of the
channel.
Use the insertion tool, wiggle the tool gently while pushing it down.
2
Fill the cups with cover fluid to test for proper seating of the cups.
3
Replace the cover fluid after 10 minutes.
4
62
Ettan IPGphor 3 Operating Instructions 28-9635-51 AC
5 Operation
5.1 Preparations before start
5.1.2 Use the Ettan IPGphor Cup Loading Manifold