
2–10
EPM 5100 ELECTRONIC POWER METER – USER GUIDE
CHAPTER 2: INSTALLATION
2.3
Electrical Installation
2.3.1
Instrument Transformer Connections
Wiring connections from CTs and voltage sources (up to 600 V AC) or PTs may be made
with AWG wire sizes up to #10. Select the wire size according to conventional CT and PT
circuit-design guidelines.
The figures in this section illustrate EPM 5100 Electronic Power Meter and instrument
transformer connections for various combinations and configurations of PTs and CTs. CT
and PT connections must be made using the polarity “dot” conventions shown on these
figures for the EPM 5100 Electronic Power Meter to properly interpret power flows.
All current and voltage inputs (CTs and PTs) must be de-energized and the EPM 5100
Electronic Power Meter completely assembled before connections are made to the
meter.
All field wiring must be completed before power is applied to the EPM 5100 Electronic
Power Meter terminals.
FIGURE 2–10: Typical 2-Element Connection with no PTs
WARNING
WARNING
A
B
C
Line
Load
10
9
3
6
5
2
7
8
4
1