User Manual
Druck DPI612
Page 49 of 105
[EN] English – 109M4017 Revision -
2.3.4
Priming Sequence
1
2
3
4
5
6
7
8
Step
Procedure
1
Turn the Volume Adjuster counter-clockwise. (See Section
1.9.7)
2
Turn the Volume Adjuster 10 turns clockwise
3
Close Release Valve.
4
Close Refill Valve clockwise, finger tight (See Section 1.9.8).
5
Operate Priming Pump until liquid is seen coming from the
open test port / end of hose.
6
Connect IUT to open test port / end of hose.
7
Operate Priming Pump until pressure is indicated (max 10
bar)
8
Operate Volume Adjuster & Refill Valve to achieve required
pressure. (See Section 2.3.5)
Note: If priming a long hose keep the open end of hose vertical to
reduce trapping air.