This job card contains the instructions for interconnecting the workstation to other equipment and 
components as part of the installation. Monitor cabling diagrams are provided to show the 
interconnection of two or four "B" monitors to the appropriate video board slot positions at the rear of 
the computer housing.

Section 2: Prerequisites

The site must be prepared for installation of the workstation. Refer to the 

Centricity RA600 

Workstation Pre-Installation Manual 

for detailed information.

u

The appropriate line voltage, line frequency, and power supply line cords.

u

Ethernet connection.

u

Appropriate furniture for the Workstation (i.e. desk, chair, etc.).

Section 3: Cabling

Table 3-3

 lists the part numbers of interconnecting cables used during installation.

Refer to 

Illustration 1-3

 to see where various connectors are located on the computer housing.

3-1 Components Used During Installation

Caution

!

The maximum magnetic field allowable for installing the GE  
Centricity RA600 Workstation is 1 gauss to ensure proper operation.

Summary of Contents for Centricity RA600

Page 1: ... Systems Information Technologies Centricity RA600 Service Manual RadWorks Release 6 0 FP10516 Revision 2 Published August 2002 Do not duplicate GE Medical Systems Information Technologies 2002 All rights reserved ...

Page 2: ...English This equipment generates uses and can radiate radio frequency energy The equipment may cause radio frequency interference to other medical and non medical devices and radio communications To provide reasonable protection against such interference this product complies with emissions limits for a Group 1 Class A Medical Devices Directive as stated in EN60601 1 2 However there is no guarante...

Page 3: ...agnetic interference for a Class A FCC Device all interconnect cables to peripheral devices must be shielded and properly grounded Use of cables not properly shielded and grounded may result in the equipment causing radio frequency interference in violation of the FCC regulations Do not use devices which intentionally transmit RF Signals Cellular Phones Transceivers or Radio Controlled Products in...

Page 4: ...rs électriques mécaniques ou autres Dieses Kundendienst Handbuch existiert nur in englischer Sprache Falls ein fremder Kundendienst eine andere Sprache benötigt ist es Aufgabe des Kunden für eine entsprechende Übersetzung zu sorgen Versuchen Sie nicht das Gerät zu reparieren bevor dieses Kundendienst Hand buch nicht zu Rate gezogen und verstanden wurde Wird diese warnung nicht beachtet so kann es ...

Page 5: ...cnico oper ador ou Il presente manuale di manutenzione è disponibile soltanto in inglese Se un addetto alla manutenzione esterno alla GEMS richiede il manuale in una lin gua diversa il cliente è tenuto a provvedere direttamente alla traduzione Si proceda alla manutenzione dell apparecchiatura solo dopo aver consultato il pre sente manuale ed averne compreso il contenuto Non tenere conto della pres...

Page 6: ...video Europe s dongle replacement procedure revised initial powerup config Flat panel display coverage other miscellaneous minor fixes 2 8 2002 DB SA WB Add RA600 Identification Connectivity list to Chp 1 revise monitor calibration CNF006 change streaming video SW013 and Static frame capture SW007 to point to kit doc add software patch installation SW014 ...

Page 7: ...nterconnections 37 IST 004 B 1536 x 2048 Flat Panel Portrait Monitor Connections 41 IST 005 C 1280 x 1024 Landscape Monitor Interconnections 45 IST 006 Site Configuration Forms 49 IST 007 Adaptec SCSI Card Installation 53 IST 008 Installing Frame Grabber Board 55 IST 009 Optional Internal Hard Drive Connect Configure 57 IST 010 Installing Additional RAM Modules In CPU 81 IST 011 Installing Global ...

Page 8: ...ver 135 CNF 008 RAID System Recovery and Configuration 143 CNF 009 Configuring Workgroup Server Client System 151 CHAPTER 5 FUNCTIONAL CHECK 161 VF 001 Functional Checks Setup Completion 162 VF 002 Saving Restoring System and User Settings 165 VF 003 Customer Turnover 173 CHAPTER 6 SOFTWARE PROCEDURES 175 SW 001 Restoring RA600 Original System Configuration 177 SW 002 Installing Centricity RA600 S...

Page 9: ...1 232 SW 014 Installing Centricity RA600 Software Patch 233 CHAPTER 7 TROUBLESHOOTING 234 TSG 001 Telneting to a Workstation 236 TSG 002 Workstation Directory Tree 238 TSG 003 Troubleshooting Network Problems 239 TSG 004 Using The VGA Service Monitor 241 TSG 005 Stop a Software Process 243 TSG 006 Display Windows 2000 System Logs 244 TSG 007 Display Centricity RA600 Application Logs 245 TSG 008 Di...

Page 10: ...s no pass through 255 CHAPTER 8 DISASSEMBLY REASSEMBLY PROCEDURES 257 DR 001 Video Board Switch Settings 258 DR 002 PC Port Connection Diagram 260 DR 003 Replace Configure PERC 3 DC RAID controller board 262 DR 004 Replacement of 221S RAID Unit Components 264 CHAPTER 9 RENEWAL PARTS 265 CHAPTER 10 SUGGESTED MAINTENANCE 275 MNT 001 Scheduled Maintenance 276 ...

Page 11: ...about the workstation a list of related manuals and a summary of what is in each chapter Chapter 2 Service Installation Steering Guide This chapter presents an overview of what is required for a complete installation Chapter 3 System Installation This chapter contains the job cards needed to perform the installation configure purchasable options and post installation activities Chapter 4 Software ...

Page 12: ...lp isolate problems and contains job cards for querying the system to display parameters and information about running processes logs software version etc Chapter 8 Disassembly Reassembly This chapter contains job cards for disassembly and reassembly Chapter 9 Renewal Parts Workstation replaceable parts list and part numbers Chapter 10 Suggested Maintenance Suggested maintenance procedures to be p...

Page 13: ... one or two landscape monitors C models l A VGA service monitor for system maintenance tasks Illustration 1 1 shows a workstation configuration with two Barco CRT portrait monitors and the service monitor Illustration 1 1 Centricity RA600 showing BARCO monitors service monitor Barco Monitors Keyboard Computer Unit VGA Service Monitor Mouse ...

Page 14: ...rk Interface Connector RJ45 connector Video board s One or two video boards depending upon the number of video monitors being used See appropriate job card in Chapter 3 for cabling and the location of video board in Computer Unit Keyboard Standard 104 key Mouse 2 button with scrolling wheel Model Type Type Resolution Refresh Rate Video Board Barco A Model Portrait Monochrome CRT 2048 x 2560 71 Hz ...

Page 15: ...1536 x 2048 59 Hz 3MP2FH C Model Landscape Color CRT or flat panel 1280 x 1024 85 Hz 75 Hz for flat panel Matrox G450 Model Type Type Resolution Refresh Rate Video Board VGA Service Monitor Color 640 x 480 default onboard VGA Software Items Installed Item Description Windows 2000 with SP2 Operating System Centricity RA600 Application Software Model Type Type Resolution Refresh Rate Video Board ...

Page 16: ...Introduction Page 16 Illustration 1 2 Computer Unit Front View ...

Page 17: ...uter Unit Rear View Section 5 List of Abbreviations The following abbreviations and terms are used throughout this manual Abbreviation Term Definition CPU Refers to the Computer Unit Central Processor Unit IP Internet Address Internet Protocol ...

Page 18: ...ed content on the workstation computer minimizing virus vulnerability NTFS The system hard drive New Technology File System SMPTE A test pattern displayed on a monitor Society of Motion Picture and Television Engineers Tech Support Technical Assistance offered by the GE Remote On Line Center Centricity RA600 Tech Support by the On Line Center at 800 321 7937 or International at 414 896 5659 LHS Le...

Page 19: ... supporting spare parts for the Dell CPU Server If the ROC does not identify the root of the problem to be Dell related the local FE will be dispatched While on site if the local FE identifies the problem to be Dell related he she will call the ROC for support The ROC will then contact Dell for problem resolution Dell will provide 3 years of Same Day 4 Hour Response Service This will include Parts...

Page 20: ...o http www dell com html us global prem_page tag_trans_form htm which will display the Unit Location Transfer Form The following information will be required to fill out the Transfer Form Unit Information all Unit Service Tag Number Country where system was originally purchased New Location Information all Name of contact person for Dell service Organization Street Address City State Province Zip ...

Page 21: ...Facility Name System Location Bldg Floor etc System ID Too generic What ID Primary Field Engineer Name Primary Field Engineer Phone Customer Contact Name Customer Contact Phone Item Name Number CPU Type Mfr Model Service Nol etc RAM amount Hard Disk Size RAID Unit Mfr Model Size Item Name Number Centricity RA600 Software Version No Centricity RA600 Dongle License Serial No ...

Page 22: ...dress MAC Address Subnet Mask AE Title Internet Connection Gateway Address Remote Connectivity Software Installed VNC PC Anywhere etc VPN Connection Available for GE Service If yes type and connection info Dial In 56KB Modem Phone No Item Name Data Value Multi monitor Yes No Type of Monitor s Single Media Archive SMA Installed Y N Item Name Number ...

Page 23: ...ection if remote type of wide area network WAN used POTS DSL cable etc Archive Module Digitizer Y N Digitizer ID Mfr Model S N QC Module Y N Dicom print option Y N Dicom printer Mfr Model S N Integration module Y N Other Modality Type Description IP Address S M GW Port AE Title Item Name Data Value ...

Page 24: ...Introduction Page 24 Modality Type Description IP Address S M GW Port AE Title ...

Page 25: ...e 27 is an overall process steering diagram for installing the Centricity RA600 Workstation Section 3 Installing Options Table 2 1 lists the procedures for installing optional items in the Centricity RA600 Workstation Optional Item Physical Installation Software Install Configure Additional RAM Module s IST 010 N A RAM is automatically recognized at bootup Optional Hard Drive s IST 009 OS configur...

Page 26: ...Single Media Archive CD R IST 007 SCSI board SW 006 Film Digitizer Lumisys Howtek Vidar IST 007 SCSI board SW 010 Global Modem IST 011 N A Barco 3MP2FH Video Board N A CNF 007 Barco s MediCal Pro monitor calibration software N A CNF 008 RAID Work Group Server IST 013 SW 011 CNF 009 Work Group Client N A SW 012 CNF 009 I Color Streaming Video Capture System IST 008 FP10621 kit document Optional Ite...

Page 27: ...or Physical Connection IST 003 Software Installation Not needed for new installation SW001 Load from cold Ghost SW002 Load from warm Install configure any peripheral software See Table 2 1 Functional Checks VF 001 and Save System User Settings VF 002 Customer Turnover VF 003 Stop Calibrate Monitor s with BARCO Tool MediCal Pro Software CNF 006 Y N Install any optional peripheral device s See Table...

Page 28: ...itor Interconnections IST 004 B 1536 x 2048 Flat Panel Portrait Monitor Connections IST 005 C 1280 x 1024 Landscape Monitor Interconnections IST 006 Site Configuration Forms IST 007 Adaptec SCSI Card Installation IST 008 Installing Frame Grabber Board IST 009 Optional Internal Hard Drive Connect Configure IST 010 Installing Additional RAM Modules In CPU IST 011 Installing Global Modem IST 012 Inst...

Page 29: ...s The site must be prepared for installation of the workstation Refer to the Centricity RA600 Workstation Pre Installation Manual for detailed information uThe appropriate line voltage line frequency and power supply line cords uEthernet connection uAppropriate furniture for the Workstation i e desk chair etc Section 3 Cabling Table 3 1 lists the part numbers of interconnecting cables used during ...

Page 30: ...ection Line voltage selection is automatic for the workstation monitors and most of the peripherals 3 3 Power Connections Power cables must be fitted with proper plugs for the country where the workstation is installed A distribution strip is supplied with the system 3 4 Network Connection The ethernet network connections are made via hubs or switches Cable Part No From To Cable Detail N A CPU Key...

Page 31: ...tration two or four monitors Illustration 3 1 Interconnecting two barco monitors to workstation Slot 4 Slot 3 Interface interconnections to two Barco A 2048 x 2560 portrait monitors Blank Blank Blank Video Card White Black Green White Black Green Barco Monitor 1 rear view Barco Monitor 2 rear view primary monitor Monitor cable connector to video interface Calibrator connector Video card connectors...

Page 32: ...it monitors Blank Video Card Blank Video Card Barco Monitor 1 rear view Barco Monitor 2 rear view primary monitor Monitor cable connector to video interface Calibrator connector Video card connectors cable 1 cable 2 Barco Monitor 3 rear view Barco Monitor 4 rear view primary monitor cable 1 cable 2 Wht Blk Grn Wht Blk Grn Wht Blk Grn Wht Blk Grn Vsync Hsync Video Vsync Hsync Video Vsync Hsync Vide...

Page 33: ... 2 Prerequisites The site must be prepared for installation of the workstation Refer to the Centricity RA600 Workstation Pre Installation Manual for detailed information uThe appropriate line voltage line frequency and power supply line cords uEthernet connection uAppropriate furniture for the Workstation i e desk chair etc Section 3 Cabling Table 3 2 lists the part numbers of interconnecting cabl...

Page 34: ...ection Line voltage selection is automatic for the workstation monitors and most of the peripherals 3 3 Power Connections Power cables must be fitted with proper plugs for the country where the workstation is installed A distribution strip is supplied with the system 3 4 Network Connection The ethernet network connections are made via hubs or switches Cable Part No From To Cable Detail N A CPU Key...

Page 35: ...ion two or four monitors Illustration 3 3 Connecting two barco 1728 by 2304 monitors to workstation Slot 4 Slot 3 Interface interconnections to two Barco A 1728 x 2304 portrait monitors Blank Blank Blank Video Card White Black Green White Black Green Barco Monitor 1 rear view Barco Monitor 2 rear view primary monitor Monitor cable connector to video interface Calibrator connector Video card connec...

Page 36: ...rtrait monitors Blank Video Card Blank Video Card Barco Monitor 1 rear view Barco Monitor 2 rear view primary monitor Monitor cable connector to video interface Calibrator connector Video card connectors cable 1 cable 2 Barco Monitor 3 rear view Barco Monitor 4 rear view primary monitor cable 1 cable 2 Wht Blk Grn Wht Blk Grn Wht Blk Grn Wht Blk Grn Vsync Hsync Video Vsync Hsync Video Vsync Hsync ...

Page 37: ...rerequisites The site must be prepared for installation of the workstation Refer to the Centricity RA600 Workstation Pre Installation Manual for detailed information uThe appropriate line voltage line frequency and power supply line cords uEthernet connection uAppropriate furniture for the Workstation i e desk chair etc Section 3 Cabling Table 3 3 lists the part numbers of interconnecting cables u...

Page 38: ...ection Line voltage selection is automatic for the workstation monitors and most of the peripherals 3 3 Power Connections Power cables must be fitted with proper plugs for the country where the workstation is installed A distribution strip is supplied with the system 3 4 Network Connection The ethernet network connections are made via hubs or switches Cable Part No From To Cable Detail N A CPU Key...

Page 39: ...nection of two B monitors to workstation Slot 4 Slot 3 Slot 2 Slot 1 Interface interconnections to two B 1200 x 1600 portrait monitors Blank Blank Blank Video Card Calibrator Video card connectors connector Monitor 1 Monitor 2 Double headed monitor cable connects to two interface connectors Vsync Hsync Video Vsync Hsync Video B Monitor 1 rear view B Monitor 2 rear view primary monitor cable 1 cabl...

Page 40: ...ard Blank Video Board B Monitor 1 rear view B Monitor 2 rear view cable 1 cable 2 B Monitor 3 rear view B Monitor 4 rear view cable 1 cable 2 Wht Blk Grn Wht Blk Grn Wht Blk Grn Wht Blk Grn Vsync Hsync Video Vsync Hsync Video Vsync Hsync Video Vsync Hsync Video Blue Red leads not used Blue Red leads not used Calibrator Video board connectors connector Monitor 2 Monitor 1 Double headed monitor cabl...

Page 41: ...mputer housing Section 2 Prerequisites The site must be prepared for installation of the workstation Refer to the Centricity RA600 Workstation Pre Installation Manual for detailed information uThe appropriate line voltage line frequency and power supply line cords uEthernet connection uAppropriate furniture for the Workstation i e desk chair etc Section 3 Cabling Table 3 4 lists the part numbers o...

Page 42: ... Line Voltage Selection Line voltage selection is automatic for the workstation monitors and most of the peripherals 3 3 Power Connections Power connection is behind the top rear panel of the B monitor Power cables must be fitted with proper plugs for the country where the workstation is installed A distribution strip is supplied with the system 3 4 Network Connection The ethernet network connecti...

Page 43: ...o the computer housing 3 6 Monitor Connections The monitor video connections are behind the top rear panel of the B monitor A faring in the panel provides outlet for the video and power cables Connect the monitors as shown in appropriate cabling illustration two or four monitors Illustration 3 7 connection of two B monitors to workstation primary monitor ...

Page 44: ...Hardware Installation IST 004 B 1536 x 2048 Flat Panel Portrait Monitor Connections Page 44 Illustration 3 8 Connection of four B monitors to workstation primary monitor ...

Page 45: ...site must be prepared for installation of the workstation Refer to the Centricity RA600 Workstation Technical Reference Manual for detailed information uThe appropriate line voltage line frequency and power supply line cords uEthernet connection uAppropriate furniture for the Workstation i e desk chair etc Section 3 Cabling Table 3 5 lists the part numbers of interconnecting cables used during ins...

Page 46: ... 3 2 Line Voltage Selection Line voltage selection is automatic for the workstation monitors and most of the peripherals 3 3 Power Connections Power cables must be fitted with proper plugs for the country where the workstation is installed A distribution strip is supplied with the system 3 4 Network Connection The ethernet network connections are made via hubs or switches Cable Part No From To Cab...

Page 47: ... monitors as shown in appropriate cabling illustration one or two monitors If the video card has two connectors connect the primary monitor to connector 1 Make the monitor connections according to included manufacturer s documentation Illustration 3 9 connection of one landscape monitor Slot 4 Slot 3 Interface interconnections to one landscape monitor Blank Blank Blank Video Card Landscape Monitor...

Page 48: ...scape monitors 3 7 Video Board Driver Installation Refer to job card SW 003 in chapter 6 for C monitor video board driver installation instructions Slot 4 Slot 3 Interface interconnections to two landscape monitors Video Card Blank Blank Video Card Landscape Monitor 1 Slot 1 Slot 2 Slot 5 Slot 6 Blank Blank Landscape Monitor 2 ...

Page 49: ...on page 50 and the Example Site Data Sheet on page 52 and leave it attached in the site s service manual Update these forms for each new option or software release installation Note Photocopy the forms for use on all workstations as required Section 3 Required Data Definitions A blank and an example site data sheet are at the end of this job card Complete a site datasheet per the example site data...

Page 50: ...k administrator Default Gateway As supplied Normally supplied by the network administrator Time zone Select as applicable Double click on task bar clock to change settings Date and time Select as applicable Double click on task bar clock to change settings Root Password As set by GEMS Field Service Workstation Installation Worksheet Machine Type Intel CPU Serial Number System ID Internet Address N...

Page 51: ...cellaneous Initial Software Revision Software Upgrade Revision Miscellaneous Software Upgrade Revision Miscellaneous Software Upgrade Revision Miscellaneous Software Upgrade Revision Miscellaneous Software Upgrade Revision Miscellaneous Software Upgrade Revision Miscellaneous Software Upgrade Revision Miscellaneous Workstation Installation Worksheet ...

Page 52: ...al identifier room number for this system Hostname SCD132 Hostname Maximum of 14 letters number Workgroup Centricity RA600 IP Address 3 28 75 132 Internet IP address Assigned unique number that identifies this station in a network Subnet Mask Netmask 255 255 255 25 2 Netmask A number used by software to identify the subnet field of a network address Default Route 3 28 75 3 Default route a route IP...

Page 53: ...SCSI controller card in the Centricity RA600 Workstation computer Section 2 Tools REquired u5 mm cross head screwdriver u5 mm flat head screwdriver uGrounding wristband Section 3 Materials Required uAdaptec AHA 2930U SCSI Card u50 Pin SCSI Interface Cable Section 4 Prerequisites uCentricity RA600 Workstation with Windows 2000 Pro installed per GEMS specification Section 5 Procedure ...

Page 54: ...hecking Inside the Compuuter 3 Locate an available PCI slot for the Adaptec AHA 2930U SCSI card Note Be sure to observe proper ESD safety precautions when inserting the SCSI card 4 Install the Adaptec AHA 2930U SCSI card into the PCI slot 5 Replace the workstation case cover 6 Connect one end of the 50 Pin SCSI Interface cable to the SCSI card connector at the rear of the computer and the other en...

Page 55: ...move the left hand half of the Dell 1400 computer case l Slide the rear padlock hasp toward the chassis center and press the release button on the lower front of the bezel and remove the left side of the case l For detailed instructions refer to the Dell Online Documentation Dell PowerEdge System Documentation Dell PowerEdge 1400 PowerEdge 1400 Installation and Troubleshooting Caution The componen...

Page 56: ...rabber board 3 Insert the frame grabber board into an available PCI slot 4 Replace the workstation case cover 5 Power on the system 6 When Windows 2000 requests a driver for the frame grabber board insert the Foresight Imaging CD and follow the instructions for installing the appropriate driver 7 Refer to job card SW 007 Installing Foresight Static Frame Capture Software Refer to Kit document FP10...

Page 57: ...kstation Section 2 Tools REquired uPhilips head 2 screw driver uMedium slotted head screw driver uGrounding wristband Section 3 Materials Required uOptional Hard Drive Installation Kit Section 4 Procedure Note The components used in the workstation are static sensitive Observe static precautions when performing this procedure 4 1 Physical Installation of Hard Drive This procedure describes how to ...

Page 58: ... and retain packing material until installation is validated 2 2 Configure the hard drive as SCSI drive 2 by placing a jumper plug across pins 5 6 on the 28 pin connector at the front of the drive Refer to Illustration 3 11 following Illustration 3 11 Hard Drive Jumper configuration 3 Power down the processor and unplug the power cord ...

Page 59: ... 4 Open CPU case by removing side access panel Release and remove the side access panel use the release switch padlock hasp on lower rear panel and the push button in front Refer to Illustration 3 12 and on line CPU documentation as necessary Illustration 3 12 Side Access Panel Release ...

Page 60: ...09 Optional Internal Hard Drive Connect Configure Page 60 5 Identify and disconnect ribbon data cable going to existing CPU hard drive 6 Disconnect power connector from existing hard drives Illustration 3 13 Hard Drive Connector ...

Page 61: ...9 Optional Internal Hard Drive Connect Configure Page 61 7 Remove Dell 1400 front panel by pressing down release button inside top of case and pulling front panel away and then up from chassis Illustration 3 14 Front Panel Release ...

Page 62: ...onnect Configure Page 62 8 To access hard drive cage in CPU chassis l Pull out and down on the handle of the drive bay door on the front of the chassis until the cage front is about 1 inch out of the bay Illustration 3 15 Illustration 3 15 Hard Drive Cage Access ...

Page 63: ... Optional Internal Hard Drive Connect Configure Page 63 l Then slide out the cage from the chassis to access the drive mounting screws on the top and bottom of the cage Illustration 3 16 Illustration 3 16 Slide out hard drive cage ...

Page 64: ...nward toward the center of the case Illustration 3 17 New Drive Installed In Cage 10 Mount the new drive to the drive cage with the four screws provided 11 Slide the drive cage back into CPU chassis 12 Pull up the drive bay door up and in to its locked position 13 Connect the data ribbon cable to old and new drives 14 Connect a power connector from the CPU power supply to each of the hard drive s ...

Page 65: ...hen be configured 18 Replace the front and side covers on the CPU case when the new drive is shown to be operating as desired 19 This completes the physical installation of the optional hard drive 4 2 Configuring the New Hard Drive in the System Note Volume Set cannot be created on a partition that contains systme files 1 At the Windows 2000 desktop navigate to Start Programs Adminstrative Tools C...

Page 66: ...Hardware Installation IST 009 Optional Internal Hard Drive Connect Configure Page 66 Illustration 3 18 Write signature to new disk ...

Page 67: ...w disk in the lower right pane Illustration 3 19 New Disk 1 with written signature in Disk Management 5 Right click on the Centricity RA600 D drive area and select Extend Volume from the pop up menu then click Next on the Extend Volume Wizard Welcome window Note If instead of the Extend Volume Wizard welcome you get an error message like that in Illustration 3 21 then click OK and skip to section ...

Page 68: ...stallation IST 009 Optional Internal Hard Drive Connect Configure Page 68 Illustration 3 20 Starting Extend Volume wizard Illustration 3 21 Can t extend a volume originally created on basic vis a vis dynamic disk ...

Page 69: ...ck Add to move this available space to the Selected dynamic disks list Leave the default Sizes info set at Maximum and click Next Illustration 3 22 Using finishing Extend Volume wizard 7 In the Completing the Extend Volume Wizard window click Finish Note in the Disk Management display that both the existing and extended disk areas are now designated D ...

Page 70: ... new dynamic disk transfer all existing data from the old to the new disk delete the old disk and then extend the new disk onto the old disk space Note Perform steps 1 thru 5 of section 4 2 then continue with this procedure 1 Right click on the unallocated Disk 1 area and select Create Volume from the popup menu Click Next on the Welcome window of the Create Volume Wizard Illustration 3 23 Create ...

Page 71: ...Select Disks window high light Disk 1 in the All available dynamic disks list and click Add to move it to the Selected dynamic disks list it for the volume Leave the default values in the Size selection and click Next 4 In the Assign Drive Letter or Path window select the Assign a drive letter radio button and select G from the letter list then click Next ...

Page 72: ...and select the following Formatting parameters a File system to use Select NTFS b Allocation unit size Leave Default c Volume label New Volume d Check the Perform a Quick Format check box e Click Next 6 In the Completing the Create Volume window review the volume selections use the Back button to make any necessary corrections and then click Finish Note the appearance of the new Disk 1 volume in t...

Page 73: ... of the D drive to the G drive as follows a Right click on the D area of Disk 0 and select Open from the popup menu b Right click on the G area of Disk 1 and select Open from the popup menu c Select the entire contents of D in the D drive window and copy it to the drive G window Caution Ensure that all of the D drive data is copied or it will be lost in the next steps ...

Page 74: ...a of Disk 0 and select Delete Volume from the popup menu Illustration 3 27 Deleting the D volume 9 When the Are you sure caution appears in the Delete simple volume popup click Yes 10 When the Disk Management popup asks Do you want to continue click Yes Note that following volume deletion the former D drive area now appears as Unallocated space ...

Page 75: ...allation IST 009 Optional Internal Hard Drive Connect Configure Page 75 Illustration 3 28 Clicking through warnings 11 Right click on the G drive area and select Extend Volume Illustration 3 29 Extending the G Drive ...

Page 76: ...inish G Volume Extension 13 In the Select Disks window select Disk 0 In the All available dynamic disks field and then click Add to select this space for extension of G Leave the Size values at default maximum and click Next 14 In the Completing the Extend Volume Wizard window click Finish to complete the G extension Note that the former D drive area now is labeled G ...

Page 77: ...xtended volume as follows a Right click on the Disk 1 New Volume area and select Properties from the popup menu b On the General tab of the New Volume Properties window enter Centricity RA600 in the Label field and click OK Note the new name now appears on both areas of the new volume Verify that the total capacity of the extended drive is as expected ...

Page 78: ...ustration 3 32 Changing the drive letter of the new volume 16 Change the drive letter of the new volume to D as follows a Right click on the new volume area and select Change Drive Letter and Path from the popup menu b In the Change Drive Letter window highlight the G drive and click Edit ...

Page 79: ...3 Complete the drive letter change c In the Edit Drive Letter window select the Assign a drive letter radio button and highlight D then click OK d In the Confirm popup click Yes Note in the Disk Management console display that the new drive is now designated D 17 Close out of the Disk Management window ...

Page 80: ...ional Internal Hard Drive Connect Configure Page 80 Illustration 3 34 The extended D drive 18 Use the Windows 2000 Explore function to verify that the Database folder and its subdirectories files are present as before the installation ...

Page 81: ...400 CPU that has 512MB RAM Minimum RAM for a Centricity RA600 CPU is 512MB Section 2 Prerequisites uA properly installed and configured Dell PowerEdge 1400 CPU with Windows 2000 Pro installed and running uThe RAM upgrade kit with the RAM modules to be added Section 3 Tools Required uGrounding wristband Section 4 Procedure Caution The RAM modules and other components in the Dell 1400 may be damaged...

Page 82: ...half of the workstation case l Slide the rear padlock hasp toward the chassis center and press the release button on the lower front of the bezel and remove the left side of the case Refer to Illustration 3 35 l For detailed removal instructions refer to the Dell Online Documentation Dell PowerEdge System Documentation Dell PowerEdge 1400 PowerEdge 1400 Installation and Troubleshooting Guide Check...

Page 83: ...y mounting bracket has detents to hold it up while accessing the system board 6 Identify RAM module locations DIMM A thru DIMM D See Illustration 3 36 Illustration 3 36 DIMM Module Location on System Board 7 Mount the additional RAM module s into open memory locations For optimal memory operation start from location A closest to the top edge of the system board and work downwards to D leaving no u...

Page 84: ...no user intervention is required 10 When reboot is complete on the Windows desktop right click on the My Computer icon and select Manage 11 In the Computer Management console window a Click to expand the System Interface folder b Click on System Information c Click on System Summary Refer to Illustration 3 37 d Check to make sure that the value for Total Physical Memory is correct according to the...

Page 85: ...stem does not recognize the new RAM module s a Power down the CPU b Disconnect the power cord c Release and raise the power supply d Reseat the RAM modules and repeat steps 8 through 11 13 When the new RAM is acknowledged by the CPU replace the side cover on the CPU case This completes the installation and setup for the optional RAM module s ...

Page 86: ...ive foot pads and Velcro mounting tape strips Section 3 Prerequisites Different countries have different requirements for how modems must function Therefore before you use the modem in a given country u you must first verify that it is approved for use in that country and uyou must configure the modem to match the defaults of the country in which you will use it To find these conditions go to the ...

Page 87: ...he local power outlet 5 Connect the telephone cable from the modem to the local communication outlet 6 Set the modem power switch to ON 7 Power up the CPU 8 Perform a functional check of the modem according to the application it is designed to be part of If the computer is in as shipped condition all necessary software should be in place for full modem functionality Only if necessary perform the V...

Page 88: ... Barco 3M pixel flat panel monitor in the Dell 1400 computer Section 2 Material Required uBarco 3MP2FH video controller board uDell 1400 Computer Section 3 Prerequisite Section 4 Procedure 1 Unpack the 3MP2FH and retain packing material until installation is validated 2 Power off the CPU 4 1 Hardware Setup Caution Wear a protective ESD strap during installation or handling of the board Electrostat...

Page 89: ...es located at SW1 on the 3MP2FH The following table shows their locations and briefly describes their functions and default states Table 3 7 Switch settings for BarcoMed 3MP2FH Switch Function VGA EN Enables VGA on the Primary Head default is ON BIOS EN Allows the system BOIS to read the Video BIOS default is ON NORMAL Controls Board State default is ON INT CLK Internal Clock default is ON The swi...

Page 90: ...By default VGA should be enabled on the primary card If installing 2 cards in the system make sure that the VGA EN option on the 2nd card is set to OFF Illustration 3 39 PCI Slots for video cards Figure 2 illustrates the correct slots location for 3MP2FH cards 4 2 Installing the BarcoMed 3MP2FH Graphics Controller Install the 3MP2FH into your computer following these steps ...

Page 91: ...on 3 39 for correct location 4 Secure the card to the chassis with the PC s I O panel mounting screw and replace the chassis cover 5 Connect the primary display left most display in a linear configuration top most in a vertical configuration to the uppermost connector on the 3MP2FH the output farthest from the motherboard VID 1 in figure 3 using the provided DVI cable Connect the secondary display...

Page 92: ...he Dell website at www support dell com docs under Systems PowerVault Storage 220 221 S Storage Systems language choice Installation Service Guide Service Information for Technicians Section 2 Items Required u Dell 1400 PowerEdge computer with Color monitor keyboard and mouse u Dell PowerVault 221S with two connecting SCSI cables Section 3 Procedure 1 Unpack and identify the system components n De...

Page 93: ...et the Bus Configuration switch for split bus configuration middle position 5 Connect the keyboard and mouse to the computer 6 Connect the computer power cord from the computer to a compatible power outlet 7 Connect the two RAID power cords from the RAID unit power supply modules to compatible power outlets 8 Power up the RAID unit 9 Power up the computer according to the Initial Power Up job card...

Page 94: ...e1400 unit rear view connectors Illustration 3 42 Dell PowerVault 221S RAID unit rear view 2 3 1 4 5 6 2 7 8 9 1 Bus config switch Set to middle pos 2 Fan B fault 3 Fan A fault 4 Power supply status 5 Power supply fault 6 AC status 7 AC connector 8 Power supply on off switch 9 SCSI connector ...

Page 95: ...rds CNF 001 Initial Power Up and Software Configuration CNF 002 Configuring System IP Address Subnet Mask or Default Route Gateway CNF 003 Changing Host Computer Name CNF 004 Adding Configuring TCP IP Printer CNF 005 VNC Server Installation and Configuration CNF 006 Monitor Calibration with Barco Tool MediCal Pro CNF 007 Configuring Barco 3MP2FH Video Driver CNF 008 RAID System Recovery and Config...

Page 96: ... support of the site and to complete the installation process Filling in this data as it is collected will avoid lost time re collecting it later Section 2 Items Required The following items are needed at the initial system power up uA VGA service monitor for A A B and B monitor configurationis uWindows 2000 Registration ID Number uRA600 License File uSite specific configuration information Cautio...

Page 97: ...ation 1 Connect and power on the workstation system in the following order a VGA monitor if system is a A A B or B b System Monitor s c Computer Note The workstation has been configured with default information during the manufacturing process The workstation will need to be configured for site specifics 2 After reboot is complete when the Windows 2000 Welcome window appears click Next 3 Click Yes...

Page 98: ...ss select the appropriate radio button If specific enter the IP address Subnet Mask and Default Gateway addresses in the fields provided b whether you want a specific or automatically supplied DNS server select the appropriate radio button If specific enter the address of the server and an alternate if desired c If the compluter is to be a member of a domain or workgroup select the appropriate rad...

Page 99: ...or or to 75 Hz for an 18 flat panel then click OK to close the Display Properties window 3 2 Install Centricity RA600 License File 1 Locate the Centricity RA600 Configuration floppy license file diskette 2 Copy the RA600 license file into the d AMI_60 bin folder where d is the installation drive 3 Remove the blank license dat file from the d AMI_60 bin folder if present 4 Rename the RA600 license ...

Page 100: ...e code can be found inside the MediCal Pro package on the back of the CD case 3 Set up and configure the MediCal Pro software according to job card CNF 006 Monitor Calibration with Barco Tool MediCal Pro Note The MediCal Pro software is not intended for use with C monitors The software can be used to check C monitor calibration but since C monitor brightness and contrast controls are available on ...

Page 101: ...to pass through a network routing device A default route must be added to tell the workstation how to get to other devices on the other side of the routing device Section 2 Prerequisites The IP address of the default routing device Section 3 Procedure 3 1 Set IP Address Subnet Mask 1 Select Start Settings Control Panel Network and Dial up Connections 2 Right click on Local area connections and sel...

Page 102: ...plied IP address If specific you must enter the IP address Subnet Mask and Default Gateway addresses in the fields provided b whether you want a specific or automatically supplied DNS server If specific enter the address of the servcer and an alternate if desired 5 Click OK twice and close the Network and Dial up Connnections window 6 Reboot the computer for the changes to take effect ...

Page 103: ...o re establishing its membership in any workgroups you want it to remain a member of Be prepared to take care of these items Section 3 Procedure 3 1 Enter Computer Identification 1 Right click on My Computer and select Properties 2 Select the Network Identification tab and click the Properties button Caution All computer names must be unique Having two workstations with the same hostname can slow ...

Page 104: ...puter name in the field provided Note The computer name must be unique on the LAN The preferred naming convention for the Centricity RA600 workstations is RWDxxx where xxx is the last three numbers of the IP address RWD RadWorks Display 4 Click OK to close the Identification Changes window and OK to close the System Properties window ...

Page 105: ...things as printing reports and work lists Section 2 TOOLS REQUIRED Windows 2000 CD ROM Section 3 PREREQUISITES uWorkstation integration completed uWorkstation operating system software installed and configured uWorkstation application software installed and configured uTCP IP printers are on the network and pingable uPrinter network name and or IP address or printer manufacturer and model Section ...

Page 106: ...in the Welcome window and follow the wizard instructions to add the printer 4 When prompted a Enter the name and or IP address of the printer b Select this printer as the default printer c Designate whether the printer is to be shared 5 When the wizard installation completes print a test page to check the connection and installation and click Finish on the wizard ...

Page 107: ...requisites uVNC is installed on the workstation or available on Centricity RA600 RadWorks 6 0 Utility Driver CD ROM uWorkstation user login name and password Section 3 Procedure 3 1 VNC Server Installation and Configuration 1 Power up the CPU and log into the work station as administrator 2 Place the Utility Driver CD ROM in the CD ROM drive and access VNC VNCForWindows 3 Run setup exe 4 Click O K...

Page 108: ...ve Tools Install WinVNC Services 12 Only if the workstation includes A and B monitors ensure that the Palette Options is set for Dynamic Gray Palette as follows a Select Start Settings Control Panel Display b Select DOME tab c From the Palette Options drop down window elect Dynamic Gray Palette d Select OK 13 Restart the CPU 14 At reboot click O K on the WinVNC Error window 15 Enter Password 2geti...

Page 109: ...l port connection K2020JC for USB The B flat panel has a built in sensor does not need a puck Note The MediCal Pro software is not intended for use with C monitors The software can be used to check C monitor calibration but since C monitor brightness and contrast controls are available on the front of the monitor no assurance is possible that the settings will remain manually unchanged between cal...

Page 110: ...most display in should be connected to the PC serial port and any other display s positioned to the right should be daisy chained from the left most out data connector of left monitor to in data connector of right monitor 3 Except for certain Barco monitors those with built in screen sensors connect the screen sensor puck to the first monitor to be calibrated On Barco A B CRT monitors the puck con...

Page 111: ... describing where to find this connection later click OK 7 The following initial conifiguration window appears example shown is for a dual head card which controls one or two monitors Click on Configuration Setup to start the configuration wizard 8 Click Next twice to start the wizard searching first for Barco monitors i e Barco display controller card s The wizard reports its findings If a Barco ...

Page 112: ...oting directions of the wizard check cable connections etc until all the Barco displays are found 10 If the display is not Barco the wizard reports 0 found and asks if this is correct Click Yes twice to start the wizard searching for non Barco display s The wizard again reports findings and asks if this is correct If not click No troubleshoot per the wizard screen instructions ...

Page 113: ...ted information about the display connected then click Next 12 Follow the wizard s direction until all displays have been found and all requested info entered 13 When the Define Heads screen appears follow the on screen instructions to match the display with the proper display controller When the blinking display appears the goal is to select the Head of the blinking display and the number of the ...

Page 114: ...n screen appears you can select to calibrate and do a Q A check immediately Select Next to continue 15 When the following screen appears you can select to calibrate and do a Q A check immediately Check both boxes and select Next to continue Click Finish to finish the wizard and wait The calibration should start ...

Page 115: ...black calibration During calibration you should use the ambient light shield of the sensor At a subsequent step you are asked to remove the sensor and then add it back 17 After each monitor calibration completes click OK to the pop up calibration was successful dialog box After calibrating all displays the Q A Check is started you should see the MediCal Pro Maintenance Q A Tasks dialog box 18 Clic...

Page 116: ...e highlighted patch and press the enter key on the following message 20 After finishing all Q A tasks you should see following message 21 Now your main view should look like one of the examples below The left hand screen is from a dual B flat panel monitor test result with at least one test failed The right hand screen is for a dual monitor requiring the screen sensor that passed all tests ...

Page 117: ...there you will see the target definitions For non Barco color displays enter VALID data for the display brand name type and serial number The white and black is measured on the next calibration same display function DICOM with Ambient Light Correction Section 4 Individual Maintenance Tasks with MediCal Pro 4 1 Q A Check 1 To execute all due tasks for today go to Start Programs MediCal Pro MediCal ...

Page 118: ...view of the available Q A Tasks Select the task you would like to run by clicking on it Right click on the task and select Run Now in the popup menu to execute that particular task Follow further instructions until the execution of the task ends 3 The result of the execution is displayed in the Last Result column of the Q A setup view 4 4 Look up histories of executed tasks 1 If you want to view t...

Page 119: ...esult is the most recent Select a particular result and click on Details for more information about the task result 4 The following view shows the different displays in your display system to which this task result applies Further details a graph or a number of measurement values can be reached by selecting a display and choosing Details The information is applicable for the selected display 4 5 L...

Page 120: ...g view It contains an overview of the different questions of the visual check with the answers next to it in the Result column 4 6 Look up the values for the result of a Measure Uniformity task 1 Go to the history of the Measure Uniformity task for a certain display as explained in the section Look up histories of executed tasks 2 When looking for details on the results of a display the task histo...

Page 121: ...ment values for a particular result A window shows up with the measured values of the uniformity task 4 7 Look up detailed results of a measurement task 1 Go to the history of one of the measurement tasks Measure Display White Measure Display Black Measure Quality Level for a certain display as explained in the section Look up histories of executed tasks ...

Page 122: ...re in the task history details of that task for a certain display you can view a graph of all the results of that task or you can view this information in a table format See the illustrations below for a preview of what you can expect of these views Section 5 Troubleshooting Unsatisfactory Calibration ...

Page 123: ...tion is not visible at the bottom of the main window you need to log in again Go to Tools Options User Login in the menu The login window appears 2 Leave the user name as it is and type advanced as user password Press OK The advanced view of MediCal Pro appears with the configuration of your displays 3 To calibrate a display right click on the picture of a display Select Calibrate in the popup men...

Page 124: ...y Task is WARNING or NOT OK 1 In case a result of the Measure Uniformity task is unsatisfying find out which display is causing the problem See section Look up histories of executed tasks if you need more information about retrieving detailed information on task results 2 Once you know which display is responsible for the problem you should check if the LUC option Luminance Uniformity Correction o...

Page 125: ...e LUC of a display right click on the picture of a display Make sure the option Luminance Uniformity Correction is selected The box in front of the option is checked If the LUC was already enabled do a Full Screen Calibration on this display Select Full Screen Calibration in the same popup menu and follow the instructions of the calibration If the LUC was disabled enable it now Calibration is not ...

Page 126: ... there is a problem with the visual check the first thing you should do is find out which part of the visual check is causing this problem Follow the steps below to have a detailed analysis of the problem if you already know which part of the visual check is problematic you can go to the appropriate troubleshooting item ...

Page 127: ...ook up histories of executed tasks if you need help on this 3 You should see an overview of the results for the Visual Check task where the last result the top one is NOT OK Select this result and click Details to get detailed information 4 The last result of the visual check task is visualized according to the displays in your display system If one or more displays had a negative result for the v...

Page 128: ... is next to the question Verify that the 5 block can be seen in the center of the 0 block and that the 95 block can be seen in the center of the 100 block then the SMPTE test pattern was not displayed correctly See the corresponding item for troubleshooting b If NOT OK is next to the question Is the linearity acceptable then there is a problem with the linearity See the corresponding item for trou...

Page 129: ...in the menu The login window appears 3 Leave the user name as it is and type advanced as user password Press OK The advanced view of MediCal Pro appears with the configuration of your displays 4 To calibrate a display right click on the picture of a display Select Calibrate in the popup menu and follow the instructions for the calibration of the display When the calibration finishes you can calibr...

Page 130: ...You can also check this without executing the task by choosing Test Patterns in the main view A window with available test patterns shows up Select SMPTE from this list and click Load The SMPTE pattern is displayed on the selected display of your configuration Right click on the test pattern for a popup 5 5 Visual check linearity problem 1 In case the linearity of the display is problematic it is ...

Page 131: ...Leave the user name as it is and type advanced as user password Press OK The advanced view of MediCal Pro appears with the configuration of your displays 4 To start the alignment tool for a display right click on the picture of the display Select Alignment in the popup menu Note Make sure the display where you do an alignment is the right one Compare the serial number of the display found in the t...

Page 132: ...o Page 132 The display alignment tool shows on the display Use the indicated tools for horizontal and vertical geometry settings to adjust the alignment of the display see picture below For further information on using the alignment tool refer to the user manual for MediCal Pro ...

Page 133: ...n Right click on the test pattern for a popup menu with further actions for this pattern 5 6 Visual check focus problem 1 The focus problem cannot be solved with the current version of MediCal Pro It is recommended that you consult a service technician with a version of MediCal Maintenance to adjust the focus of your display 2 When the focus of the display is adjusted retry the visual check task a...

Page 134: ...Software Configuration CNF 006 Monitor Calibration with Barco Tool MediCal Pro Page 134 configuration Right click on the test pattern for a popup menu with further actions on this pattern ...

Page 135: ...on 2 Material Required uDell 1400 computer with 3MP2FH video board installed uBarco Coronis 3 Mpixel flat panel display s uPower and video connector cables for the flat panel displays uCD containing video driver for the 3MP2FH video board Section 3 Prerequisites u 3MP2FH video board must be installed in the Dell 1400 computer per IST 0012 uPower cable s connected to standard 110 Vac outlet s uVide...

Page 136: ...lay a list of the known drivers for this device so that I can choose a specific driver Click Next 6 In the Hardware Type page of the wizard highlight Display Adapters and then click Next 7 In the Select a Device Driver page of the wizard click Have Disk Insert your CORONIS Driver Media or browse to the location of your driver and Click OK 8 Select BarcoMed 3MP2FH in the Select a Device Driver wind...

Page 137: ...elect the resolution and refresh rate that your CORONIS display panel supports from the dialog box and click OK Note Note The number of heads that the imaging board can support will multiply the X resolution of your mode For example The BarcoMed 3MP2FH Imaging Board supports two CORONIS display panels If the resolution of each display is 2048 x 1536 Windows 2000 will display the resolution as 4096...

Page 138: ...rs have been installed and the resolution set 4 3 Installing DualView under Windows 2000 DualView allows a dual head graphics board to display two separate desktops one for each monitor instead of a single virtual desktop that spans across both monitors Figure 6 below illustrates the difference between running without and with DualView enabled under Windows 2000 DualView is a feature that is suppo...

Page 139: ...iguring Barco 3MP2FH Video Driver Page 139 In the system shown in the screen capture preceding there is one BarcoMed 3MP2FH Imaging Board installed with Dual View disabled and no 3 rd party VGA card Your configuration may look different ...

Page 140: ...zard appears 3 Click Next 4 In the Choose a Hardware Task page of the wizard select the radio button beside Add Troubleshoot a device and click Next Windows will now search for a new Plug and Play hardware device to install When Windows fails to find a new Plug and Play hardware device the Choose a Hardware Device page of the wizard will appear 5 Select Add a new device and click Next 6 In the Fin...

Page 141: ... 1 To set the resolution for your CORONIS display panel s under DualView right click on the desktop and select Properties Select the Settings tab see figure 5 earlier in this chapter Now select the rectangle that represents the BarcoMed 3MP2FH Imaging Board you are working with Note If you are using the VGA capabilities of your BarcoMed 3MP2FH Imaging Board the resolution for that board will still...

Page 142: ...ol Panel If the OK button on the bottom of the Adapter Control Panel is not visible press CTRL Enter to select OK 7 Click OK in the Windows will now apply your new desktop settings dialog box Your high resolution display s should now synchronize and display the Windows desktop 8 Click Yes when asked Your desktop has been reconfigured Do you want to keep these settings To set the resolution of the ...

Page 143: ... the RAID system has been corrupted or a component has failed because the factory built unit comes preloaded with the necessary software Section 2 Prerequisites uWindows 2000 Server registration ID number uVideo cable is properly connected between the computer and the monitor uCentricity RA600 Workgroup Server Recovery CD ROM set is available uCentricity RA600 license file diskette is available Se...

Page 144: ...ation will boot and the CD ROM is auto mounted 6 Press the C key to continue 7 Press the Y key 8 Press Yes to answer Partition size correct 9 When screen asks whether to Proceed with disk load change the answer to Yes The disk load will take approximately 10 minutes 10 When prompted insert Disk 2 of the set into the CD ROM drive 11 When prompted remove CD from CD ROM drive and reboot the computer ...

Page 145: ...to the Bin folder 17 Start the Centricity RA600 application and check that it is working 18 Use Windows Explorer to find and delete the following folder c RW_BackUp 3 2 Configuring the RAID Management System 1 Select Start Programs Dell OpenManage Applications Array Manager Array Manager Console 2 In left pane of Dell Open Manager window navigate to computer name Arrays PERC Subsystem Logical Arra...

Page 146: ...nfiguration CNF 008 RAID System Recovery and Configuration Page 146 4 From the Task menu select Assign Global Hotspare 5 In right hand pane note that Array Disk 00 is now called Spare Array Disk in the Type column ...

Page 147: ...irtual Disk 8 In the resulting initial wizard window click Next 9 In the following wizard window click Next to accept defaults 10 In the following wizard window leave all defaults except select RAID 5 from the Type pulldown menu and then click Next 11 In the following wizard window click Next to accept default 12 In the final wizard window click on Finish ...

Page 148: ...ation Page 148 3 3 Initializing the RAID 1 Select Programs Dell OpenManage Applications Array Manager Array Manager Console 2 Right click on Disk 1 in the left hand pane select Write Signature and click Yes to confirm 3 Right click on Disk 1 and select Create Volume ...

Page 149: ...Software Configuration CNF 008 RAID System Recovery and Configuration Page 149 4 Click Next in the Welcome window of the Create Volume Wizard 5 Select Disk 1 Select Free Space and then click Next ...

Page 150: ...se maximum then click Next 7 Select Assign a drive letter select F and click Next 8 Check the Format this volume checkbox select NTFS file system enter a Volume label of RA600 WGS check the Perform Quick Format checkbox then click Next 9 Review the Volume Specifications and then click Finish to complete volume creation This completes volume creation ...

Page 151: ...3 SW 011 and SW 012 Section 2 Prerequisites uWindows 2000 Server OS is loaded on the computer uVideo cable s properly connected between the computer and the monitors s uThe RA600 Workgroup server and client installed per job cards IST 013 SW 011 and SW 012 Section 3 Procedure 3 1 Disallow Empty Database Query The following setting is meant to avoid hanging up the system for a long time period if a...

Page 152: ... Start the Centricity RA600 program and wait for the operator console to display 2 Click on Data Selector tab in the Tooltab guide see arrow in preceding screen capture 3 For each worklist name in the Worklist View pull down list a Select the worklist name b Click the Properties button ...

Page 153: ...on CNF 009 Configuring Workgroup Server Client System Page 153 c Uncheck the Allow Empty Query checkbox d Click OK When the empty query option has been disallowed for all worklists proceed to the next Configuration process ...

Page 154: ... settings for the Workgroup Server and for each Client Machine 1 In the Centricity RA600 console select Configuration Generic Properties HIS RIS 2 Highlight Default HIS RIS Implementation and click on the Config button 3 Select RadWorks Worklist tab 4 Highlight Today and click on the Copy button ...

Page 155: ...Software Configuration CNF 009 Configuring Workgroup Server Client System Page 155 5 Select Today Copy and click on Modify 6 Enter the new worklist name of Last 5 Days into the Description field ...

Page 156: ... 009 Configuring Workgroup Server Client System Page 156 7 On the Active studies tab Query group select StudyDate in the Description column modify the first limit by appending minus five 5 at the end of the limit as shown below ...

Page 157: ...009 Configuring Workgroup Server Client System Page 157 8 Close all open windows then close and restart the Centricity RA600 program 9 Add a new worklist called Last 5 Days as follows a From the Database menu select the Add View ...

Page 158: ...lient System Page 158 b In the Add View window make the following entry in the Description field Last 5 Days Do Not Delete c In the List pull down list select Last 5 Days d In the Copy Settings from field ensure that the Local Studies item is selected e Click OK ...

Page 159: ...n Generic Properties and then select the General tab 11 In the Initial View window pulldown list select the Last 5 Days Do Not Delete item and then click OK 12 Close and restart the Centricity RA600 program 13 In the Centricity RA600 console ensure that the program has opened with the initial worklist display of Last 5 Days Do Not Delete ...

Page 160: ...to the ASP workflow environment 3 4 Put Workgroup Server Machine Name in Client Hosts File The clients require an entry for their server in the client machine hosts file C WINNT system32 drivers etc hosts This is mandatory if the client and the server are not on the same network or subnet This also allows easier switching to a back up server The hosts file can be edited to temporarily change the I...

Page 161: ... 5 Functional Check Section 1 Summary of Job Cards Job Card No Functional Check Job Card Title VF 001 Functional Checks Setup Completion VF 002 Saving Restoring System and User Settings VF 003 Customer Turnover ...

Page 162: ... valid network connections uSet the administrator password uLaunch the application program and check functionality Section 2 Prerequisites uWorkstation integration completed uWorkstation operating system software installed and configured uWorkstation application software installed and configured uMonitors calibrated Section 3 Procedure 1 Login as administrator No password is set at this time If a ...

Page 163: ...right click on the clock located on the task bar 2 Select the Adjust Date Time menu option 3 Click the Time Zone tab and set appropriately 4 Click on Apply 5 Select the Date Time tab and set the time and date appropriately ping 3 28 75 100 Return You should see a response from the ping if the Ethernet connection is good Pinging 3 28 75 100 with 32 bytes of data Reply from 3 28 75 100 bytes 32 time...

Page 164: ...1 4 Click OK when done then Cancel 5 Select Start Shut Down 6 Select Log off User and click OK 7 Login as different user when the Windows login screen is displayed 3 4 Application Software Checkout 1 Login to the system with the correct username and password 2 Launch Centricity RA600 and note that the Data Selector comes up in the control console 3 Select and double click to display an image 3 5 S...

Page 165: ...user may manage the settings for a specific user Section 2 Items Required uA formatted diskette only if settings are to be stored offline Section 3 Prerequisites uCentricity RA600 must be installed and running OS is loaded uSystem monitor s keyboard and mouse must be functional and monitor s powered on uAll system and user settings have been completed Note Only the correct drivers will successfull...

Page 166: ...aunch the RadWorksSettings exe program The program should be located at D AMI_60 bin RadWorksSettingsTool exe 2 The Settings tool initial window appears 4 2 Backing Up System Settings 1 Log on to the system as administrator start the Settings application and click the RadWorks System button ...

Page 167: ... Click OK to close the RadWorks System Settings window 4 3 Restoring System Settings 1 Log on to the system as administrator start the Settings application and click the RadWorks System button 2 In the RadWorks System Settings window click the Restore button 3 In the Open window select the files you wish to restore and click Open to restore those system files from the default Backup folder else fi...

Page 168: ...ser Settings window highlight your assigned user profile name and click Save An administrator may select any of the Available Settings profile names for saving 3 In the Save As window enter a name for the backup file and click Save to save the available system files to the default Backup folder else first navigate to the preferred backup device and or folder and then click Save 4 Click OK to close...

Page 169: ... wish to restore and click Open to restore those system files from the default Backup folder else first navigate to the preferred backup device and or folder select the desired files there and then click Open 4 For an administrator only this Open window may be used to select a new User profile to change an existing user profile The system offers two options a Replace the existing profile witht the...

Page 170: ...nistrator start the Settings application and click the RadWorks User button 2 In the RadWorks User Settings window click the Clear button This remove all settings for the current user The next time the current user logs into the system no settings will be loaded and the options for a new user will be presented as in section 4 8 3 Click OK to close the RadWorks System Settings window 4 7 Delete Use...

Page 171: ...lect the desired settings file and click the Delete button This will remove only that settings file for the current user Confirm the deletion in the popup confirmation dialog box 3 Click OK to close the RadWorks System Settings window 4 8 Choose User Profiles Running Centricity RA600 uPrerequisite RA600 newly installed 1 User starts the RA600 application for the first time 2 The initial use dialog...

Page 172: ...lick Cancel to reject the defaults and build his own custom profile from scratch this loads the system defaults c For either of the above choices the user may also check the Only show dialog when Shift key is down check box When this box is checked this initial dialog box will henceforth only appear if the Shift key is held down when RA600 is started The RA600 console launches ...

Page 173: ...te with site specific data uWorkstation application software installed factory completed and configured as appropriate with site specific data uAll calibrations completed as appropriate uEnsure that the site specific remote connectivity information is complete in Section 9 of Chapter 1 Telephone the ROC to deposit this information in their installed base data repository Section 3 Procedure All tas...

Page 174: ...he graphical user interface Monitor s calibrated per procedure If applicable default route information is added If applicable verify that images sent to the printer s print correctly The workstation configuration data has been backed up to the 3 5 diskette and stored away Ethernet pings performed Administrator password is set Save System User settings show customer where they are saved Instruct cu...

Page 175: ...A600 Original System Configuration SW 002 Installing Centricity RA600 Software SW 003 C 2C Matrox Video Board Driver Installation SW 004 A A B Dome Video Board Driver Installation SW 005 Removing Applications Software SW 006 Single Media Archive SMA Install Configure Test SW 007 Installing Foresight Static Frame Capture Software Refer to Kit document FP10621 SW 008 Common Windows 2000 Procedures S...

Page 176: ...g Work Group Server on RA600 SW 012 Installing an RA600 Work Group Client SW 013 Install Setup of Streaming Video Capture System Refer to Kit document FP10621 SW 014 Installing Centricity RA600 Software Patch JobCard No Software Procedure Job Card ...

Page 177: ...kette available uMediCal Pro registration ID number Section 3 Prerequisite uA VGA service monitor for any systems with A A and B monitors is required for all sites at this time Connect the service monitor to the computer motherboard Video connector uGather all necessary data before proceeding If baselining an existing system first examine it to obtain its currently assigned IP Address and Workstat...

Page 178: ...files Refer to job card VF 002 uNew workstations will require that an IP Address and Workstation Name be supplied by the hospital s IS or Network personnel If you are assigning the workstation name use existing naming conventions such as PLT001 Section 4 Procedure 1 Place the RA600 Workstation Recovery CD ROM 1of 2 into the CD ROM drive 2 Restart the workstation 3 The workstation will boot and the...

Page 179: ...orkstation Recovery CD ROM 2of 2 when prompted 9 When the Clone complete message appears remove 2of 2 CD from CD ROM drive and reboot the computer 10 After reboot is complete when the Windows 2000 Welcome window appears perform job card CNF 001 Initial Power Up and Software Configuration on page 96 ...

Page 180: ...llation instructions Section 2 Items Required uCentricity RA600 CD ROM uRA600 license file diskette Section 3 Prerequisite uSystem must be up and running under Windows 2000 OS uIf used the license file must be available on diskette or where it can be reached by a browser uRA600 license file requires an active network communication If the network is not available you must disable MediaSense before ...

Page 181: ...ROM drive When the CD ROM self loads and the Welcome to Setup screen appears click Next Illustration 6 1 Install to folder D ami_60 2 When the Destination Folder screen appears with a C drive location specified click Change 3 When the Change Current Destination Folder screen appears type D AMI_60 in the Folder Name field then click OK ...

Page 182: ...he proper radio button s to choose the installation type according to the functions purchased for this workstation Diagnostic Review Standard Educational and whether or not this workstation will be a Workgroup server b Click the proper radio button s to choose the workstation role If the Workstation was designated a Workgroup server then click the workgroup client The workstation must also be a cl...

Page 183: ...Close the browse window if used ensure the license file field now shows the correct location illustration example shows c license dat and click Next Illustration 6 3 Specify Optional Modules 7 Modules a Highlight any optional program module s purchased for this workstation b Only if Acquisition is selected select the type of acquisition modules from the expansion tree and then the make model of th...

Page 184: ...s continue to the Transmit screen Illustration 6 4 Specify Transmit Parameters and Miscellaneous Install Items 10 Transmit Enter the image data transmission location data for this workstation in the local network a DICOM AE title b Dicom port number c teleradiology name d teleradiology description e If appropriate check the Use modem for remote connections checkbox f Click Next 11 In the Miscellan...

Page 185: ...on on this workstation Demo Data and or Configure multimonitor b Click Next Illustration 6 5 Choose Demo Data or not and Complete Installation 12 In the Ready to Install the Program screen click Install Note that the Installing RadWorks screen appears and installation begins 13 When the Installshield Wizard Completed screen appears click Finish ...

Page 186: ...Delete Information in the Registry and Edit Registry Data Help topics in Regedt32 exe Note You should always back up the registry before you edit it If you are running Windows NT or Windows 2000 you should also update your Emergency Repair Disk ERD To prevent your network adapter from detecting the link state 1 Use Registry Editor Regedt32 exe to view the following key in the registry HKEY_LOCAL_M...

Page 187: ... you set this value data to 1 DHCP and even non DHCP clients ignore Media Sense events from the interface By default Media Sense events trigger the DHCP client to take an action such as attempting to obtain a lease when a connect event occurs or invalidating the interface and routes when a disconnect event occurs 3 Restart your computer ...

Page 188: ...C 2C or 18 flat panel 1x or 2x monitor Section 2 Items Required uCentricity RA600 Tools CD ROM uOne or two C monitor s or 18 flat panel Section 3 Prerequisites uOS is loaded uVideo boards are properly installed in the workstation uVideo cables are properly connected uMonitors connected and powered on Section 4 Procedure 1 Locate and launch the Setup exe program for the Matrox_G450 The program shou...

Page 189: ...up window ensure that the devices supported by this driver include the G450 and click Next 4 In the third setup window check the Add extra Dual Head Multi Display support checkbox and click Next Illustration 6 6 Initial Matrox Setup Windows 5 In the fourth setup window ensure that the selections about to be installed are correct and click Next 6 When the Files have been copied message appears in t...

Page 190: ... the Dual Head tab 10 Expand the Features folder by clicking on the box and highlight the DualHead Multi display item 11 Click on the Change Settings button to bring up the DualHead Multi display window and make the following selections a Check the Use DualHead Multi display checkbox if 2 monitors will be used b Select the Same resolution and color palette for both displays radio button c Select t...

Page 191: ... selections a Click the List all modes button to bring up the List all modes window b For a 1C single color monitor configuration highlight 1280 x 1024 High Color 16 bit 85 Hertz c For an 18 1x flat panel monitor configuration highlight 1280 x 1024 High Color 16 bit 60 Hertz d For a 2C side by side dual color monitor configuration highlight 2560 x 1024 High Color 16 bit 85 Hertz ...

Page 192: ... f Click OK to close the List all modes window Illustration 6 9 Finish Monitor and Matrox properties selection 13 On the Plug and Play window click the Apply button 14 On the Windows will now apply your new desktop settings popup click OK 15 On the Monitor Settings popup click Yes 16 Click OK to close the Plug and Play window 17 Click OK to close the Display Properties window ...

Page 193: ...4 Md5 Section 2 Items Required uCentricity RA600 Tools CD ROM uA VGA service monitor Section 3 Prerequisites uOS is loaded uVideo board switch settings are set correctly uVideo boards are properly installed in the workstation uVideo cables are properly connected Note Only the correct drivers will successfully install with a particular video board Be sure the correct board is installed before proce...

Page 194: ...es have been installed reboot when prompted 6 Log into the system as Administrator There may be no password set at this time If a password has been set it could be CANal1 7 Click OK on the invalid display settings window and skip to step 11 8 Click on Start Settings Control Panel 9 Double click the Display icon in the Control Panel 10 Select the Settings tab in the Display Panel 11 Change the reso...

Page 195: ...tart the workstation 14 Reboot the Workstation re login as Administrator and return to the Display Panel 15 Select the DOME tab from the Display Panel 16 Configure the Panel as listed below a Select Dynamic Gray from the palette option drop box b Select the appropriate resolution that matches that as configured in the Settings table above c Select the correct monitor refresh rate that matches that...

Page 196: ...nfiguration depicted with 4 portrait monitors across by 1 monitor high f Select check on Pedestal g Ensure that Sync on Green and Composite Sync are NOT checked h Ensure that Disabled Direct Draw and Disable Red Blue are NOT checked i Click OK to make the changes permanent j Click OK to test the new settings k Click OK to accept the new settings or wait 15 seconds and OK will be selected automatic...

Page 197: ...deo board s switch settings are set correctly uVideo board s are properly Installed in the workstation uVideo cable s properly connected uVideo board driver installed Section 3 Procedure 1 Login as user Administrator There may be no password set at this time If a password has been set it could be CANal1 2 Select Start Settings Control Panel Add Remove Programs 3 Click on the RadWorks Workstation R...

Page 198: ...Software Procedures SW 005 Removing Applications Software Page 198 5 Confirm the deletion of the application 6 Ignore any warnings about shared programs ...

Page 199: ...uCentricity RA600 Application CD ROM and any included software patch es uApproved SMA Read Write drive with power and signal cables uWritable CDs approved for use with the SMA drive Section 3 Prerequisites Installation of SMA is part of the RA600 installation The prerequisites are therefore the same as job card SW 002 plus the following uSMA Read Write drive must be connected to the RA600 computer...

Page 200: ...the RA600 application If any are present install the patch es at this time according to the release notes included on the patch CD 3 Start the RadWorks RA600 application 4 To add a new column to the data selector for the SMA right click on the column heading to the right of where you want to insert the new column and select Insert column ...

Page 201: ...age 201 5 In the Edit Column Properties dialog box make the new column properties 3109 102C Selected for archiving and click OK 6 Click the Configuration menu in the RadWorks RA600 application and choose Single Media Archive 7 In the Configure Single Media Archiving dialog box ...

Page 202: ...checkbox and browse to the folder where the files are located Highlight the desired file s and click OK on the Browse dialog box e For the Image directory field browse the directory where images will be temporarily held while they are burned onto the CD highlight that directory and click OK f Check the Verify burned contents checkbox if you want the system to do verify the SMA CD write process g C...

Page 203: ... 006 Single Media Archive SMA Install Configure Test Page 203 h Click OK to complete the SMA configuration 8 To test the SMA installation first select some studies in the RadWorks Data Selector for writing to the SMA Either ...

Page 204: ...popup menu Note that the selected studies become marked with Archive in the Select for Archiving column of the Data Selector 9 When all the desired studies have been selected for archiving first ensure a writable CD is in the drive The approximate number of disks required to store the selected studies is shown in the Est number of disks field on the Archive tab to the right of the Data Selctor Ref...

Page 205: ...ite operation either by clicking the Local Database Create Volume button on the Archive tab to the right of the RadWorks Data Selector or by selecting Archiving Create Volume with marked studies from the RadWorks menu bar Once the write process starts the following popup windows describe the process ...

Page 206: ...Software Procedures SW 006 Single Media Archive SMA Install Configure Test Page 206 ...

Page 207: ...621 Page 207 n SW 007 Installing Foresight Static Frame Capture Software Refer to Kit document FP10621 As of Revision 2 this job card is a placeholder for the kit document to ensure instruction sync with the kit The kit and kit document are updated independently of this manual by vendor Foresight Imaging ...

Page 208: ...ugh the network to the workstation Section Topic 2 1 Booting Workstation from a Power Off Condition 2 2 Shutdown Workstation Operating System 3 1 Changing to a Different Login Account 3 2 Log into OS using the Administrator Account 4 1 Reset System when hard blocked 4 2 Shut Down System from Command Prompt 4 3 Reboot System from Command Prompt 5 1 Changing Date Time 5 2 Remove Programs Using the A...

Page 209: ...rnal Hard Disk 7 3 Kill Workstation Application Locally Workstation Application Blocked Windowing System OK 7 4 Workstation Information 7 5 Viewing Windows 2000 IP Configuration 7 6 Using Windows Help Files 7 7 Locating Files Using The Search Utility 7 8 Removing Shortcut From Desktop 7 9 Removing Items From The Recycle Bin 7 10 Removing The Entire Contents Of Recycle Bin 7 11 Displaying Available...

Page 210: ... monitor the on off switch is located on the lower rear side of the Barco monitor 2 Verify that power is applied to the workstation the on off switch is located on the center right front of the CPU tower 3 With the power applied to all the peripheral devices and to the workstation the workstation will self boot the operating system Windows 2000 2 2 Shutdown Workstation Operating System 1 Click on ...

Page 211: ... Login Account 1 Click on Start 2 Select Shut Down 3 Select Log off User and click OK 4 Login as different user when the Windows login screen is displayed 3 2 Log into OS using the Administrator Account 1 At the Windows Workstation login screen press Ctrl Alt Del 2 Enter the user name of Administrator 3 Type in the Administrator password CANal1 Section 4 Shutdown and Reboot Workstation 4 1 Reset S...

Page 212: ...ame ex shutdown L SCD132 2 Confirm the shutdown 4 3 Reboot System from Command Prompt 1 Select Start Programs Accessories Command Prompt type shutdown L hostname R ex shutdown L SCD132 R 2 Confirm the reboot Section 5 OS Config 5 1 Changing Date Time Note This procedure only covers changing the date and time not their format s This procedure cannot be performed as User IIS 1 Right click the Task B...

Page 213: ...pplications Software 1 Click on Start 2 Select Settings 3 Select Control Panel Note Only programs that were designed for Windows can be removed by using the Add Remove Programs function For all other programs check the program s documentation to determine which files should be removed 4 Double click on Add Remove Programs 5 Select the program you wish to remove and click Remove 5 3 Auto Hiding the...

Page 214: ...the Screen Saver tab 4 Select a screen saver if necessary and check the Password protected check box 5 Click OK screen saver password iis user password 5 5 Changing Background on Desktop 1 Using the right mouse button click on the desktop 2 Select Properties 3 Click on the Background tab 4 Select the background 5 Click OK 5 6 Changing the Capacity of the Recycling Bin 1 Right click on the Recyclin...

Page 215: ...con to be renamed 2 Select Rename 3 Enter a new name for the icon 4 Press Enter 5 8 Changing Mouse Sensitivity 1 Select Start Settings Control Panel 2 Double click on the Mouse icon 3 Select Motion tab 4 Slide the motion bar to the desired speed for the mouse 5 Click OK 5 9 Changing OS Passwords 1 Select Start Settings Conrol Panel Users Passwords 2 Select the desired user name from the list provi...

Page 216: ...d Left Handed 1 Select Start Settings Control Panel 2 Double click on the Mouse icon 3 Select right handed or left handed radio button as appropriate 4 Click OK Section 6 Remote Access Section 7 Service Tools 7 1 Viewing Contents of a Floppy Disk 1 Insert the floppy diskette into floppy drive 2 Double click on the My Computer icon on the desktop 3 Click on the 3 5 Floppy A icon 7 2 Viewing Content...

Page 217: ... 2 Click on Task Manager 3 Select the process that is not responding 4 Click on End Task 7 4 Workstation Information For displaying workstation site configuration refer to TSG 011 Display System Hardware Software Configuration on page 249 For changing workstation site configuration settings refer to CNF 002 Configuring System IP Address Subnet Mask or Default Route Gateway on page 101 7 5 Viewing ...

Page 218: ...EC DHCP Enabled Yes Autoconfiguration Enabled Yes IP Address 3 28 77 180 Subnet Mask 255 255 252 0 Default Gateway 3 28 78 254 DHCP Server 3 28 73 209 DNS Servers 3 28 73 209 3 20 66 50 Primary WINS Server 3 28 73 150 Secondary WINS Server 3 20 68 10 Lease Obtained Thursday January 25 2001 12 20 38 AM Lease Expires Thursday February 01 2001 12 20 38 AM 7 6 Using Windows Help Files 1 Select Start H...

Page 219: ...rch Now 7 8 Removing Shortcut From Desktop 1 Click on the desktop Shortcut icon to be removed 2 Right click on the shortcut icon 3 Select Delete 4 Click Yes to send the shortcut to the recycling bin 7 9 Removing Items From The Recycle Bin 1 Double click on the Recycle Bin icon on the desktop 2 Click on the item s to be removed item will be permanently removed from system 3 Select File 4 Select Del...

Page 220: ...pace on Hard Drive 1 Double click on the My Computer icon on the desktop 2 Click on the C icon The approximate free space is shown 3 For more disk information the File menu 4 Click on Properties 7 12 Displaying Available Space on Floppy Drive 1 Double click on the My Computer icon on the desktop 2 Click on the 3 5 Floppy A icon 3 Select File 4 Click on Properties 7 13 Changing File Or Folder Prope...

Page 221: ...lications 8 1 Displaying Application Programs 1 Click on Start 2 Click on Programs 8 2 Starting Application Programs 1 Click on Start 2 Click on Programs 3 Click on the appropriate program Some programs listed may have additional programs under the programs listed 8 3 Changing Screen Saver Properties wait value 1 Right click on the desktop 2 Select Properties 3 Click on the Screen Saver tab ...

Page 222: ...ocedures Page 222 4 Select a screen saver if none is currently selected and then use the up down arrow in the Wait field to change the time The screen saver will be activated when there is no keyboard activity for the time indicated in the Wait field ...

Page 223: ...op and select Properties 2 Select the Settings tab and click the Advanced button 3 On the General tab of the Dome Properties popup window select the desired font size change to Large Small or Custom 4 Click OK to close the news window that the change will take place after Windows is restarted 5 Click Yes to the Are you sure question popup 6 Click Yes to the question popup about Use of existing fil...

Page 224: ...oftware configured to GE specification The RadWorks Acquisition module must be installed as part of the RA600 RadWorks 6 0 application uEnsure that proper SCSI ID has been set on the device interface card if necessary Refer to manufacturer s documentation for details Section 4 Procedure 1 Power up the RA600 workstation and from the Windows 2000 desktop log in as the Administrator need administrato...

Page 225: ...er e g Lumiscan 75 HowteK 450 and click Next 7 In the Ready to Modify the Program window click Install 8 If an Infomation window appears with the name of the device s you selected click OK 9 The wizard then installs a modification to complete the task In the Wizard completed window click Finish 10 Click Finish to exit the wizard 11 Open the RA600 program and check for the presence of the acquisiti...

Page 226: ...lly copy the driver software of the digitizer from the RA600 RadWorks 6 0 CD 3rdparty folder into the manually created DataAcquisitionDrivers folder on the same root as the AMI software ususally D For an automated install specify a typical install to the above named folder for a SCSI type scanner 13 Reboot the workstation ...

Page 227: ...ice Management dialog box 15 Select the digitizer device and click Load to load the device 16 If you want to make this device a default device select the device and click Activate 17 Click OK to close the Device Management window The configuration of the RadWorks Acquisition Module for the digitizer is now complete Test the configuration by using RA600 RadWorks to scan films ...

Page 228: ...ge files and other files with clients in a work group relationship Section 2 Items Required uDell 1400 PowerEdge computer uPowerVault 201S RAID Unit uCentricity RA600 CD ROM uCentricity RA600 Patch CD ROM if applicable uCentricity RA600 Workgroup Server license Section 3 Prerequisites uWindows 2000 Server OS is loaded on the computer uVideo cable is properly connected between the computer and the ...

Page 229: ... and replace all instances of RW_WGS with the new Computer Name 4 1 Installing Workgroup Server on Centricity RA600 Note You must install the Workgroup Server before installing any of the Workgroup Clients Note During the install make sure you create the same default user on the Workgroup Server and all Clients 1 Power up the RA600 workstation and from the Windows 2000 desktop log in as the Admini...

Page 230: ...mage files and other files with clients in a work group relationship Section 2 Items Required uDell 1400 PowerEdge computer uCentricity RA600 CD ROM uCentricity RA600 Patch CD ROM if applicable Section 3 Prerequisites uWindows 2000 Server OS is loaded on the computer uVideo cable is properly connected between the computer and the monitor Section 4 Procedure 4 1 Installing Workgroup Client on Centr...

Page 231: ...ive create one and copy all the contents from the root of the Centricity RA600 CD to this folder After copying make this folder Shared on the network 3 Double click on D Centricity RA600 Release Setup exe 4 Install or reinstall if applicable the RA600 software as described in job card SW 002 When the install wizard asks you to Choose the Radworks role be sure to select the Workgroup client radio b...

Page 232: ...621 Page 232 n SW 013 Install Setup of Streaming Video Capture System Refer to Kit document FP10621 As of Revision 2 this job card is a placeholder for the kit document to ensure instruction sync with the kit The kit and kit document are updated independently of this manual by vendor Foresight Imaging ...

Page 233: ...talled configured in the workstation uCentricity RA600 software application is installed and configured to the site uSoftware patch CD ROM is at hand Section 3 Procedure 1 Login as user Administrator There may be no password set at this time If a password has been set it could be CANal1 2 Insert the patch CD ROM into the CD ROM drive 3 Navigate to the release notes on the CD ROM and double click o...

Page 234: ...es when installing and using the workstation Section 2 Summary of Job Cards Caution Corrective action should be made by authorized and qualified personnel only Job Card No Troubleshooting Job Card TSG 001 Telneting to a Workstation TSG 002 Workstation Directory Tree TSG 003 Troubleshooting Network Problems TSG 004 Using The VGA Service Monitor TSG 005 Stop a Software Process TSG 006 Display Window...

Page 235: ...enter on 800 321 7937 or International on 414 896 2733 Drill down to the RadWorks support line The direct line has an added advantage that it eliminates several menu choice steps TSG 007 Display Centricity RA600 Application Logs TSG 008 Display IP Netmask Default Route Configuration Settings TSG 009 Display Loaded Drivers TSG 010 Display System Services TSG 011 Display System Hardware Software Con...

Page 236: ...ing in from a Sun system sometimes works best when done from an xterm window Caution Be aware that it is possible to render a system inoperable through incorrect use of the telnet access software telnet 3 231 128 110 for example if this were the IP address of a Workstation system This copy of the Ataman TCP Remote Logon Services is registered as licensed to Avnet Computer Account Name geservice ro...

Page 237: ...996 Microsoft Corp c Some basic keyboard functions which may or may not be needed de pending on your terminal type H Delete the last character typed ESC Erase the current line Aa The next character will be sent as an Alt character Ac The next character will be sent as a control character As The next character will be sent as a shift character Au Up Arrow Ad Down Arrow Al Left Arrow Ar Right Arrow ...

Page 238: ...00 RadWorks software Note Database may be on drive d if optional additional hard drive is present c Ami_60 Bin Connect Receive Work CDViewer CDViewer Colortables Database Archive Archive001 Archive002 Archive002a Archive003 Archive004 Archive005 History Input Local General Work Log Print Output Scripts Work Registry Samples Reports Template User Profiles Utils Work Common Viewing ...

Page 239: ...8 75 100 Return IP address 3 28 75 100 is alive ping 3 28 75 132 Return one s own address 3 28 75 132 is alive Ethernet port test including transceiver IP numbers in text are used for example ONLY Use IP numbers for your specific network uArp get current IP to ethernet address translation of connected machines unetstat rn arp a Return Use arp all for more information Net to Media Table Device IP A...

Page 240: ...Troubleshooting TSG 003 Troubleshooting Network Problems Page 240 uipconfig all uFor troubleshooting isolation steps run new CAT 5 cable to eliminate possible cable problems ...

Page 241: ...ill be directed to the VGA monitor However when Windows NT has booted far enough usually at the blue screen the hi res video drivers if installed will be enabled and video will be directed to the portrait monitors In the event of display problems on the portrait monitors video can be directed to the VGA display at Windows NT boot by selecting the boot VGA mode from the boot menu Section 2 Procedur...

Page 242: ...Troubleshooting TSG 004 Using The VGA Service Monitor Page 242 Illustration 7 1 Service Monitor Connection ...

Page 243: ...uction This job card explains how to display and stop a software process If a particular process is thought to be problematic Section 2 GUI Based Procedure 1 Right click the Taskbar and select Task Manager to display the current running processes 2 Select the process to stop and click on the End Task button ...

Page 244: ...rs and OS level logs uSecurity Security and Auditing logs uApplication application related logs not to be confused with the RA600 RadWorks workstation applications log file that is separate See TSG 007 Display Centricity RA600 Application Logs on page 245 Section 2 Procedure 1 Select Start Programs Administrative Tools Event Viewer 2 The appropriate log file can be selected from the Log menu optio...

Page 245: ...on log file radworks log is an ASCII based log file located in the c ami_60 log directory assuming the RadWorks application is installed on the c drive Section 2 GUI Based Procedure 1 The text log files Connect LOG Database LOG Print LOG and RadWorks LOG are located in the LOG subfolder of the AMI_60 folder Navigate to this location using Windows explorer 2 Any ASCII text view program in windows c...

Page 246: ... Introduction This job card explains how to display current network configuration settings Section 2 Procedure 1 Select Start Settings Control Panel Network and Dial up Connections 2 Right click on Local area connections and select Properties 3 Select TCP IP and click on Properties 4 In the popup window view the IP address Subnet Mask and Default Gateway addresses ...

Page 247: ...9 Display Loaded Drivers Section 1 Introduction This job card explains how to display the drivers currently loaded by the Operating System Section 2 Procedure 1 Select Start Settings Control Panel Administrative Tools Computer Management System Tools Device Manager ...

Page 248: ...s Page 248 n TSG 010 Display System Services Section 1 Introduction This job card explains how to display the system services being used by the Operating System Section 2 Procedure 1 Select Start Settings Control Panel Administrative Tools Services ...

Page 249: ...Hardware Software Configuration Section 1 Introduction This job card explains how to display the current hardware and software configuration of the workstation Section 2 GUI Based Procedure 1 Select Start Programs Administrative Tools Computer Management 2 Select appropriate tools and services as required ...

Page 250: ...on Section 1 Introduction This job card explains how to display the current OS version Section 2 GUI Based Procedure 1 Select Start Settings Control Panel System 2 Select the General tab The Main Screen will show the OS and its build version along with any service packs installed ...

Page 251: ...current software version running on the workstation Section 2 Procedure 1 Select Start Programs RadWorks 6 0 RadWorks 6 0 or click on the Workstation icon on the desktop The login prompt for the workstation will display the application title bar 2 With RadWorks running click on the Help menu and select About Name and version are displayed for both RadWorks and the operating system ...

Page 252: ... in the use of the Centricity RA600 application software Section 2 Problem Resolution Problem Possible Solution 1 Can t send images Make sure you have added a destination Select Connection Destinations 2 Don t see all images listed Make sure that you have not selected a filtered worklist Worklist View Local Patients or Local Studies 3 Can t key images in cine mode Key images can only be identified...

Page 253: ...d click OK to close the Automated Hanging Protocols Manager Viewing window 6 Check the location of the new XML file Detailed steps for import to Quality Control follow 1 Select Quality Control Manage Automated Hanging Protocols 2 In the Import Hanging Protocol XML file window first check the Use Automated Hanging Protocol check box then click on the Import button 3 In the Import Hanging Protocol X...

Page 254: ... Ensure that you have checked the Automatically save window settings check box To find this check box select Configuration Quality Control General tab 8 Can t retrieve import from query remote view Ensure that your workstation is set up as a destination on the system you are trying to query Problem Possible Solution ...

Page 255: ...or the Hi Def Accura boaard in video pass through mode You should never use a BNC T connector to split the video signal into the monitor and the board because this will create ghosting The following procedure explains how to set up the Hi Def Accura frame grabber board in video pass through mode Section 2 Procedure 1 Turn on the Centricity RA600 workstation power 2 Remove the left hand half of the...

Page 256: ...u have selected and then connect the corresponding CT channel to the monitor 6 Follow job card SW 007 to install the Imagraph software and configure the channel The autosync function of the softwae will automatically detect the channel that has a valid video signal Note For more details on jumper settings refer to the Hi Def Accura card User Manual Chapter 2 This manual may be down loaded from htt...

Page 257: ... touch the components themselves or any metal part Wear a grounding wrist strap when handling the drive assemblies or boards For more detailed information on the Dell computer refer to the Dell Online Documentation Dell PowerEdge System Documentation Dell PowerEdge 1400 The Dell Online Documentation CD is shipped with each Dell 1400 CPU Section 2 Summary of Job Cards Job Card No Disassembly Reasse...

Page 258: ...This job card describes the various video board switch settings These switches need to be set correctly or the system will not boot Section 2 Tools Required u5 mm cross head screwdriver u5 mm flat head screwdriver uGrounding wristband uSmall Screwdriver for setting Dip switches uSmall Needle Nose pliers for removing and installing jumpers ...

Page 259: ...sable the VGA settings of the Dome MDxxxx and Barco 3MP2FH video boards and must be set correctly for the system to boot This does not apply to C monitor systems Video Board Dip Switch 1 Settings SW 1 SW 2 SW 3 SW 4 MD5PCX A Dual Output On Off On On MD4PCV A Resolution On Off On On MD2PCI B Resolution Using Jumper J4 place jumper Over Pins 2 3 Pin 1 is top pin 3MP2FH 1st Board 3MP2FH 2nd Board if ...

Page 260: ... Port Connection Diagram Section 1 Introduction This job card identifies the onboard ports of the PC Section 2 Procedure Reference Illustration 8 1 below for connections For more information on how slot positions are assigned to different monitors refer to Hardware Installation on page 28 ...

Page 261: ...Disassembly Reassembly Procedures DR 002 PC Port Connection Diagram Page 261 Illustration 8 1 PC Port Connections 1 2 3 4 5 6 ...

Page 262: ...e available Dell PERC 3 DC Board uPhilips screwdrivers Nos 1 and 2 uAnti static guard grounding wrist strap Section 3 Procedure This procedure outlines the physical replacement of the PERC 3 DC circuit board in the Dell 1400 computer and the configuration of the new board from the system hard disk 1 Power down the Dell 1400 computer 2 Power down the Dell RAID unit by turning off both the power swi...

Page 263: ...onfiguration 8 Press F10 key to initiate autoconfiguration 9 When the system asks whether to Save Configuration answer Yes with arrow Enter keys 10 Exit the Configuration Utility 11 Reboot the system when prompted The mismatch error message should not occur on this boot 12 Power down the computer and reconnect the two SCSI cables from the RAID unit 13 Power up the RAID unit both power switches 14 ...

Page 264: ...nral a lighted amber indicator indicates a fault condition For a hard drive a flashing amber indicator indicates a drive failure To avoid data loss in the RAID unit a hard drive must be prepared for replacement with the array manager software that is provided on the Dell OpenManager software CD The Dell documentation for the RAID unit contains all necessary details about diagnosing and repair faul...

Page 265: ...mputer needs replacement transfer all optional components e g RAM upgrade Hard drive upgrade Video other optiona boards etc from the old to the new computer before returning the old computer for warranty purposes Part No FRU Rep Description Qty 2329008 1 Dell 1400 PIII 512MB Unconfigured no video board no software 1 2291997 1 512 MB RAM DIMM 133 Mhz Upgrade 1 2293291 1 36GB Hard Drive Kit Dell ...

Page 266: ...8 1 Barco 3MP Flat Panel Monitor 4362588 1 A Monitor Portrait GS 2048X2506 4 2260812 1 B Monitor Portrait GS 1200X1600 2 2260841 1 C Monitor Landscape 1280X1024 2 2324060 1 Standard 19 Color Monitor 2333243 1 C Monitor 21 with grey black case Sony P N CPD G520P Cables 4363107 1 MD5PCX Video Board to Monitor cable 2 4363099 1 MD4 Video Board to Monitor cable 2 4363115 1 Video Card to C Monitor cabl...

Page 267: ...ean Power Cable 2266211 1 Italian Keyboard 2266216 1 Italian Power Cable 2303424 1 Mechanical Serial wheel mouse Dell P N 310 3777 1 Hi Res service kit 2252691 N 3M Disposable ESD Wristband 4363073 2 VGA Monitor for Service Kit Modem 2245794 1 Modem Single Media Archive Plextor 2266773 1 Adaptec 2930U SCSI Card 1 2274121 N 50 Pin SCSI 2 Interface Cable 1 2334029 1 SMA External Drive HI DEF Frame G...

Page 268: ...d Single frame color 2324574 1 Frame Grabber Board Streaming color TIMS 2335175 1 S Video Y C Adapter for FRMGRB 2335180 1 25DB to 6BNC Jack 7ft Cable GRMGRB Work Group Server 2307368 1 PERC RAID Controller Bd 2184777 12 1 Standard 17 Monitor for WGS 2307370 1 1 meter SCSI Cable 2307365 1 36 gb Disk Drive 2342020 1 RAID Power Supply Module 460 kW 2342021 1 Cluster Card SCSI Management Card Part No...

Page 269: ...rks WebViewer Centricity Web Centricity DA210 Enterprise Archive and RadStore software utilize a dongle or a license file to control software feature access Each dongle or file is coded with the customer s purchased modules and software version and included in the software shipment If the customer damages or loses this dongle a replacement dongle can be attained through GE Cares The dongle is set ...

Page 270: ...omputer or the serial number of the replacement dongle and the serial number of the dongle that is being replaced their email address and the FDO number for the system Additional feature requests MUST be accompanied with an FDO number The support engineer will then generate the appropriate code and email it to the FE Note The FE should expect up to a 1 day turn around time for this code generation...

Page 271: ...2 License file failed or a temporary license file has been shipped Turnkey system uThe FE provides the current FDO number to the ROC and if applicable all previous FDO numbers uThe FE provides the MAC address to the ROC uWithin 1 hour the ROC sends a e mail to the FE with the appropriate license file uIf the FE cannot contact anybody from the ROC the FE sends an e mail to the contact identified fo...

Page 272: ... new software module is sold for a Software Only system Radworks 5 1 or RA 600 3 4 2 CASE IN WHICH A DONGLE CAN BE REPLACED BY A LICENSE FILE uRadworks 5 1 Turnkey systems damaged or lost dongle 3 4 3 CASE IN WHICH A DONGLE CANNOT BE REPLACED BY A LICENSE FILE uRadworks 5 1 and Centricity RA 600 Software Only 3 4 4 PROCESS TO REPLACE A DONGLE BY A LICENSE FILE Radworks 5 1 Turnkey damaged dongle 1...

Page 273: ...on type of software and modules list 2 ROC generates a temporary license file 1 month and sends it to the FE or uploads it on the system ROC decision 3 FE asks for a Service Quotation to from his ASM equivalent to the cost of the dongle and 2 visits on site 4 After approval by the customer of the service quote ROC e mails the permanent license file to FE or uploads it on the system ROC decision 5 ...

Page 274: ...Renewal Parts Page 274 Jorge Aguirre med ge com Maurice Robert med ge com ...

Page 275: ...tenance procedures for the Centricity RA600 Workstation The Centricity RA600 Workstation does not require extensive routine hardware maintenance Reasonable care of its components will help ensure continuous operation Section 2 Summary of Job Cards Job Card No Maintenance Job Card Title MNT 001 Scheduled Maintenance ...

Page 276: ...rocedure 1 Verify the integrity of the external cable connections to the peripheral devices including the network connections 2 Clean the monitor and the keyboard Use an appropriate Computer Systems cleaning kit to be sure not to scratch the monitor part no 46 194427P221 3 Open the computer case 4 Clean the inside of the computer housing Use an appropriate Computer Systems Vacuum Cleaner such as 4...

Page 277: ... Electro Static Discharge hazards to components and the dust hazard to the personnel in the area near the cleaning activity 7 Proceed to the floppy disk drive head cleaning by means of a 3 5 cleaning diskette Local purchase at computer supply store Can be done more often if the floppy disk drive is used regularly by customer 8 Save the site parameters on a new configuration diskette On a 6 month s...

Page 278: ...es GE Medical Systems Information Technologies Telex 3787371 8200 W Tower Ave Milwaukee Wisconsin 53201 U S A Asia Pacific Latin America North America GE Medical Systems Information Technologies GmbH Munzinger Strasse 3 D 79111 Frieburg Germany ...

Reviews: