5
5..8
8..2
2 H
Ha
an
nd
dlliin
ng
g C
Co
ollu
um
mn
n P
Pa
arrttss
C
Ca
au
uttiio
on
n
All handling of the top column should be done by lifting it using the knobs located on the sides of
the top, this to avoid contaminating sensitive part and avoiding body injuries.
C
Ca
au
uttiio
on
n
Part of the top column is made from ceramic filled with isolating oil, therefore it is very important
that the top column is handled carefully.
C
Ca
au
uttiio
on
n
All work done with the EB-Unit parts, including grid cup and cathode, calls for highest possible
cleanliness.
Do N
NO
OT
T touch parts with bare hands. Use a separate set of tools for the column.
All surfaces where parts and tools are placed have to be wiped with alcohol prior to work.
Access the electron beam unit via the column hatch.
Always begin with cleaning of the column, to avoid bringing the chamber contamination into the column.
During normal maintenance and handling procedures, do not use solvent in the column assembly, use as
little solvent as possible in exceptional circumstances.
C
Co
on
ntta
am
miin
na
attiio
on
n iin
n tth
he
e cco
ollu
um
mn
n m
miig
gh
htt lle
ea
ad
d tto
o::
• Beam control errors
• Prolonged pumping times
• Increased risk of arc trips
• Interrupted builds
• Shortened life time of the cathode
02
OM-710430
en-GB
33
Summary of Contents for ArcamEBM Spectra H
Page 1: ...Original language 02 OM 710430 en GB O OM M Operation Manual Spectra H...
Page 2: ...This page is intentionally left blank...
Page 4: ...Table of contents ii 02 OM 710430 en GB This page is intentionally left blank...
Page 6: ...Table of contents ii 02 OM 710430 en GB This page is intentionally left blank...
Page 8: ...This page is intentionally left blank 2 Revision Notes 4 02 OM 710430 en GB...
Page 24: ...5 Safety 412532 Jokab Safety Eden Eva 105261 Light curtain 20 02 OM 710430 en GB...