7
Installation
7
7..6
6..1
10
0 C
Ch
he
ecckk T
Th
he
e C
Ciirrccu
uiitt F
Fllo
ow
wss
1. Turbo pump circuit
2. Z-actuator circuit
3. Heat exchanger circuits
1. Check the flow of the circuits:
• Chamber cabinet heat exchanger circuit: 2
2..5
5 ll//
m
miin
n (1.0 to 3.5)
• Control cabinet heat exchanger circuit: 2
2..5
5 ll//m
miin
n
(1.0 to 3.5)
• Turbo pumps circuit: 1
1..5
5 ll//m
miin
n (0.6 to 2.4)
• Z-actuator feedthrough circuit: 1
1..0
0 tto
o 1
1..5
5 ll//m
miin
n
2. If necessary, adjust the flow.
3. Check and adjust the column circuit flow switch to
trigger the alarm at a flow less than 0
0..5
5 ll//m
miin
n.
1. Shut-off valve
2. Internal shuttle
3. Switch position
4. Turn off the cooling media supply with the shut-off
valve (1) while monitoring the internal shuttle (2) in
the flow switch. The position (3) of the switch can
be moved to adjust the switch point.
5. Verify that a warning appears in EBM control when
the flow is too low.
80
01
IM-710429
en-GB
Summary of Contents for ArcamEBM Spectra H
Page 1: ...Original language 01 IM 710429 en GB I IM M Installation Manual Spectra H...
Page 2: ...This page is intentionally left blank...
Page 4: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Page 6: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Page 8: ...This page is intentionally left blank 2 Revision Notes 4 01 IM 710429 en GB...
Page 36: ...This page is intentionally left blank 5 Safety 32 01 IM 710429 en GB...
Page 44: ...This page is intentionally left blank 6 Technical Data 40 01 IM 710429 en GB...