Before this fine alignment of the cabinets is done, the cabinets have to be roughly aligned and
connected.
1. To prevent damages to the cross connecting cables
and hoses, make sure to support these when moving
the cabinets together.
2. Once the cabinets are put together, minimise the gap
between the two cabinets by adjusting the control cab-
inet feet.
7
7..4
4..2
2..1
1 A
Alliig
gn
n T
Th
he
e C
Ca
ab
biin
ne
ettss A
Att A
A L
Liim
miitte
ed
d S
Siitte
e A
Arre
ea
a
If the site area is limited and the Control Cabinet needs to be put in place first.
1. Roughly level both cabinets when separated.
2. Fine tune the chamber cabinet after its final move.
3. Adjust the gap between the units by adjusting the con-
trol cabinet feet.
01
IM-710429
en-GB
55
Summary of Contents for ArcamEBM Spectra H
Page 1: ...Original language 01 IM 710429 en GB I IM M Installation Manual Spectra H...
Page 2: ...This page is intentionally left blank...
Page 4: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Page 6: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Page 8: ...This page is intentionally left blank 2 Revision Notes 4 01 IM 710429 en GB...
Page 36: ...This page is intentionally left blank 5 Safety 32 01 IM 710429 en GB...
Page 44: ...This page is intentionally left blank 6 Technical Data 40 01 IM 710429 en GB...