This chapter explains the points in the Arcam EBM Installation Checklist (IC).
This checklist includes the actions to be made during the Installation and is to be filled out by Ar-
cam Field Service Engineers (FSE).
Filled in document is to be stored under System S/N and Customer in SuperOffice
7
7..2
2 T
Trra
an
nssp
po
orrtt
7
7..2
2..1
1 S
Siitte
e P
Prre
ep
pa
arra
attiio
on
n
The Pre-Installation Guide provides site preparation instructions before installation of the Arcam EBM
®
system.
C
Ca
au
uttiio
on
n
It is important to follow the recommendations in the Pre-Installation Guide when preparing the
site.
Deviations from the pre-installation guide can cause malfunction or damage to the Arcam EBM
®
system or personal injury.
N
No
otte
e
Supply lines including connections shall follow local regulations and laws. Additional staff execut-
ing connections, for example electricians and plumbers, has to be scheduled to the time of instal-
lation. The customer is responsible for the fixed electrical installation of the EBM system and for
any plumbing work required prior to or during the installation. Arcam EBM is not responsible for
and will not perform any work on customer’s fixed electrical installation or plumbing system.
7
7..2
2..2
2 T
Trra
an
nssp
po
orrtta
attiio
on
n A
An
nd
d S
Stto
orra
ag
ge
e
C
Ca
au
uttiio
on
n
This procedure must be supervised by Arcam Field Service Engineers (FSE) or Arcam trained
personnel.
The equipment arrives at site on pallets and in crates. Upon arrival the crates must be taken indoors and
kept in an environmentally controlled storage facility until the installation (see Pre-Installation Guide).
For moving the cabinets with the shipping crates and for positioning the cabinets without the crates into
their final position, a manually-operated p
pa
alllle
ett jja
acckk. It should have a minimum capacity of 2
25
50
00
0 kkg
g
(5500 lbs).
A standard EUR pallet jack does not fit the Chamber Cabinet. The minimum inner distance between the
forks must be at least 450 mm.
01
IM-710429
en-GB
43
Summary of Contents for ArcamEBM Spectra H
Page 1: ...Original language 01 IM 710429 en GB I IM M Installation Manual Spectra H...
Page 2: ...This page is intentionally left blank...
Page 4: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Page 6: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Page 8: ...This page is intentionally left blank 2 Revision Notes 4 01 IM 710429 en GB...
Page 36: ...This page is intentionally left blank 5 Safety 32 01 IM 710429 en GB...
Page 44: ...This page is intentionally left blank 6 Technical Data 40 01 IM 710429 en GB...