In order to promote reliability and efficient operation, the Arcam EBM® system requires a certain amount of
scheduled preventive maintenance both from the user and the Arcam Field Service Engineers (FSE).
5
5..8
8..2
2 H
Ha
an
nd
dlliin
ng
g C
Co
ollu
um
mn
n P
Pa
arrttss
Always begin with cleaning of the column, to avoid bringing the chamber contamination into the column.
During normal maintenance and handling procedures, do not use solvent in the column assembly, use as
little solvent as possible in exceptional circumstances.
C
Co
on
ntta
am
miin
na
attiio
on
n iin
n tth
he
e cco
ollu
um
mn
n m
miig
gh
htt lle
ea
ad
d tto
o::
• Beam control errors
• Prolonged pumping times
• Increased risk of arc trips
• Interrupted builds
• Shortened life time of the cathode
30
01
IM-710429
en-GB
Summary of Contents for ArcamEBM Spectra H
Page 1: ...Original language 01 IM 710429 en GB I IM M Installation Manual Spectra H...
Page 2: ...This page is intentionally left blank...
Page 4: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Page 6: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Page 8: ...This page is intentionally left blank 2 Revision Notes 4 01 IM 710429 en GB...
Page 36: ...This page is intentionally left blank 5 Safety 32 01 IM 710429 en GB...
Page 44: ...This page is intentionally left blank 6 Technical Data 40 01 IM 710429 en GB...