7
Installation
17. Connect the cable between JJ6
6 (6) on the Beam Con-
trol Unit and JJB
B1
1 (7) on the High Voltage Unit.
18. Connect cable JJ3
3 (4) and JJ4
4 (5) in the Beam Control
Unit.
19. Slide off the protection cover from the end of cable JJ2
2.
N
No
otte
e
Be careful not to touch the end points of the cable. If it should happen, clean the ends with the al-
cohol solvent used for other parts of the machine.
20. Ground the JJ2
2 cable ends against the Beam Control
Unit rear plate.
21. Connect cable JJ2
2 (3) to the Beam Control Unit. Note
the guide groove.
J2 cable
22. Connect cable JJ2
2 by turning the part marked as A
A.
N
No
otte
e
Do not turn B
B. If you accidentally turn B, ensure that all three parts are aligned (C).
23. Connect cable JJ1
1 (2) to the High Voltage Unit.
24. Connect the lliin
ne
e iin
np
pu
utt.
25. Switch on the fuses (1) for:
• H
Hiig
gh
h V
Vo
olltta
ag
ge
e U
Un
niitt
• A
Arrcca
am
m E
EB
BM
M E
Elle
eccttrro
on
niiccss
• B
Be
ea
am
m C
Co
on
nttrro
oll U
Un
niitt
Check the designation on the inside of the Control
Cabinet side panel (2).
58
01
IM-710429
en-GB
Summary of Contents for ArcamEBM Spectra H
Page 1: ...Original language 01 IM 710429 en GB I IM M Installation Manual Spectra H...
Page 2: ...This page is intentionally left blank...
Page 4: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Page 6: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Page 8: ...This page is intentionally left blank 2 Revision Notes 4 01 IM 710429 en GB...
Page 36: ...This page is intentionally left blank 5 Safety 32 01 IM 710429 en GB...
Page 44: ...This page is intentionally left blank 6 Technical Data 40 01 IM 710429 en GB...