The chamber cabinet has an uneven centre of gravity. Lift only from the front (viewport side) or
the right side (opposite of the cooling system).
1. Check the crate for visual damage. In case of dam-
age, note this on the IIn
nsstta
alllla
attiio
on
n C
Ch
he
ecckklliisstt ((IIC
C)).
2. Open the locking tabs using a carpenter hammer
and a crow bar.
3. Lift off the roof piece.
4. Remove 8
8 screws holding the side pieces to the
transportation beams.
5. Carefully remove the side walls.
6. Remove the straps holding the cabinet to the pallet.
7. Remove the bubble plastic wrap from around the
cabinets.
8. Using a forklift, lift the cabinets approximately 1
15
50
0
m
mm
m ((6
6””)) to allow clearance for the cabinet feet, and
then screw down the cabinet feet so that they carry
the cabinets.
9. Remove the beams underneath the machine together
with the bottom board.
10. Check the cabinets for visual damage. In case of
scratches, dents or other sign of damage, note this on
the IIn
nsstta
alllla
attiio
on
n C
Ch
he
ecckklliisstt ((IIC
C)) and take photos of the
damages.
01
IM-710429
en-GB
45
Summary of Contents for ArcamEBM Spectra H
Page 1: ...Original language 01 IM 710429 en GB I IM M Installation Manual Spectra H...
Page 2: ...This page is intentionally left blank...
Page 4: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Page 6: ...Table of contents ii 01 IM 710429 en GB This page is intentionally left blank...
Page 8: ...This page is intentionally left blank 2 Revision Notes 4 01 IM 710429 en GB...
Page 36: ...This page is intentionally left blank 5 Safety 32 01 IM 710429 en GB...
Page 44: ...This page is intentionally left blank 6 Technical Data 40 01 IM 710429 en GB...