Section 2-3 - Facility needs
2-3-2
Required Facility Needs
NOTE:
GE Healthcare requires a dedicated power and ground for the proper operation of its Ultrasound
system. This dedicated power shall originate at the last distribution panel before the system.
Sites with a mains power system with defined Neutral and Live:
The dedicated line shall consist of one phase, a neutral (not shared with any other circuit), and a full
size ground wire from the distribution panel to the Ultrasound outlet.
Sites with a mains power system without a defined Neutral:
The dedicated line shall consist of one phase (two lines), not shared with any other circuit, and a full
size ground wire from the distribution panel to the Ultrasound outlet.
The following are mandatory site requirements. Additional (optional) recommendations, as well as a
recommended ultrasound room layout, are provided in
Section 2-3-4 "Desirable features"
.
•
Dedicated single branch power outlet of adequate amperage (see
) that meets all local and national codes and is located less than 2.5 m
(8.2 ft.) from the LOGIQ S8 proposed location.
•
Door opening of at least 76 cm (2.5 ft.) in width.
•
Proposed location for the LOGIQ S8 is at least 0.2 m (0.67 ft.) from the walls, to enable cooling.
•
Power outlet and place for any external peripheral are within 2 m (6.5 ft.) of each other with
peripheral within 1 m of the unit to connect cables.
•
Power outlets for other medical equipment.
•
Clean and protected space for storage of probes (either in their case or on a rack).
•
Material to safely clean probes (performed using a plastic container, never metal).
NOTE:
The LOGIQ S8 has one outlet for on board peripherals.
In case of network option:
•
An active network outlet in the vicinity of the ultrasound unit.
•
A network cable of appropriate length (regular Pin-to-Pin network cable).
•
An IT administrator who will assist in configuring the unit to work with your local network.
A fixed IP address is required. Refer to the form provided in
Figure 3-61 Worksheet for DICOM
Network Information on page 3-96
for network details that are required.
NOTE:
All relevant preliminary network port installations at the prepared site must be performed by
authorized contractors. The purchaser of GE equipment must utilize only qualified personnel to
perform servicing of the equipment.
2-3-3
Privacy and Security
Since the LOGIQ systems are integrated into your IT-network, GE wants to make sure that you are
aware of the proactive measures we are taking to secure the system.
For more information on privacy and security, refer to LOGIQ S8 Privacy and Security manual in eDoc
CD.
Summary of Contents for 5418099
Page 11: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL ix ZH CN KO ...
Page 12: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL x ...
Page 32: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL 16 ...
Page 416: ...GE HEALTHCARE DIRECTION 5394227 REVISION 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL Index 4 ...
Page 417: ......