
5 Operation
Evaluation according to the DGS method
5-130
Issue 2 (12/2013)
USM 36
Sound attenuation and transfer correction
There are two possibilities for setting the sound attenu-
ation in the test object:
●
before the DGS calibration
in the DGS function group
REF CORR
using the func-
tion
REF ATTEN
●
at any time (even after the DGS calibration)
in the function group
MAT ATTN
using the function
TEST ATTEN
The transfer corrections can be set as follows:
●
before the DGS calibration
in the DGS function group
REF CORR
using the func-
tion
AMPL CORRECT
●
at any time (even after the DGS calibration)
in the function group
MAT ATTN
using the function
TRANSFER CORR.
The settings of the functions
AMPL CORRECT
and
TRANSFER CORR.
have an additive effect, likewise
the settings of the functions
REF ATTEN
and
TEST
ATTEN
.
Using multiple DGS curves
After turning the DGS evaluation on, at least one curve
is displayed for a certain ERS (equivalent reflector size).
For some test specifications according to DGS, certain
tolerance limits in dB below and/or above this curve
must be monitored.
You can set up to four additional curves by adjusting
their offsets from the original curve in dB values. These
curves have no effect on the displayed measurement
reading or on other settings.
Summary of Contents for 37 400
Page 1: ...USM 36 Technical Reference and Operating Manual ...
Page 5: ...USM 36 Issue 2 12 2013 0 5 Second operating level ...
Page 6: ...0 6 Issue 2 12 2013 USM 36 Second operating level continued ...
Page 10: ...0 10 Issue 2 12 2013 USM 36 ...
Page 20: ...0 20 Issue 2 12 2013 USM 36 ...
Page 21: ...USM 36 Issue 2 12 2013 1 1 Introduction 1 ...
Page 35: ...USM 36 Issue 2 12 2013 2 1 Standard package and accessories 2 ...
Page 40: ...2 Standard package and accessories Recommended accessories 2 6 Issue 2 12 2013 USM 36 ...
Page 41: ...USM 36 Issue 2 12 2013 3 1 Initial start up 3 ...
Page 53: ...USM 36 Issue 2 12 2013 4 1 Principles of operation 4 ...
Page 76: ...4 24 Issue 2 12 2013 USM 36 ...
Page 77: ...USM 36 Issue 2 12 2013 5 1 Operation 5 ...
Page 212: ...5 136 Issue 2 12 2013 USM 36 ...
Page 213: ...USM 36 Issue 2 12 2013 6 1 Documentation 6 ...
Page 242: ...6 30 Issue 2 12 2013 USM 36 ...
Page 243: ...USM 36 Issue 2 12 2013 7 1 Maintenance and care 7 ...
Page 249: ...USM 36 Issue 2 12 2013 8 1 Interfaces and Peripherals 8 ...
Page 253: ...USM 36 Issue 2 12 2013 9 1 Appendix 9 ...
Page 268: ...9 16 Issue 2 12 2013 USM 36 9 4 Recycling directives Overview 5 4 4 5 6 1 7 3 2 3 ...
Page 273: ...Recycling directives 9 Appendix USM 36 Issue 2 12 2013 9 21 6 6 6 ...
Page 274: ...9 Appendix Recycling directives 9 22 Issue 2 12 2013 USM 36 7 7 8 6 8 ...
Page 279: ...USM 36 Issue 2 12 2013 10 1 Specifications 10 ...
Page 289: ...USM 36 Issue 2 12 2013 11 1 Index 11 ...
Page 305: ...11 Index USM 36 Issue 2 12 2013 11 17 Z Zoom 4 3 ...