GE Multilin
C60 Breaker Protection System
C-11
APPENDIX C
C.5 IEC 61850 IMPLEMENTATION VIA ENERVISTA UR SETUP
C
C.5IEC 61850 IMPLEMENTATION VIA ENERVISTA UR SETUP
C.5.1 OVERVIEW
The C60 can be configured for IEC 61850 via the EnerVista UR Setup software as follows.
1.
An ICD file is generated for the C60 by the EnerVista UR Setup software that describe the capabilities of the IED.
2.
The ICD file is then imported into a system configurator along with other ICD files for other IEDs (from GE or other ven-
dors) for system configuration.
3.
The result is saved to a SCD file, which is then imported back to EnerVista UR Setup to create one or more settings
file(s). The settings file(s) can then be used to update the relay(s) with the new configuration information.
The configuration process is illustrated below.
Figure 0–1: IED CONFIGURATION PROCESS
The following acronyms and abbreviations are used in the procedures describing the IED configuration process for IEC
61850:
•
BDA: Basic Data Attribute, that is not structured
•
DAI: Instantiated Data Attribute
•
DO: Data Object type or instance, depending on the context
842790A1.CDR
Ethernet
System configurator
SCD file
System specification tool
SSD file
System
specification data
ICD file 2
Process of
creating ICD
(vendor 2)
Creating ICD (GE Multilin)
EnerVista
UR Setup
ICD file 1
IED (UR-series)
OR
ICD file 3
ICD file
N
UR relay 1
Updating IED with new configuration (GE Multilin)
EnerVista UR Setup
Vendor relay 2
Vendor relay 3
Vendor relay
N
Setting files
(.URS)
IEC 61850 related
configuration for the
IED (GSSE/GOOSE,
server, logical node
prefixes, MMXU
deadbands, GGIO2
control, etc.)
Import
URS 1
URS 2
URS
X
Write settings
file to device
Write settings file
to other devices
Vendor specific tool
for updating new
configuration to IED
(vendor 2)
Vendor specific tool
for updating new
configuration to IED
(vendor 3)
System Configuration
(network, cross-
communications, IED setting
modification, etc.)
Process of
creating ICD
(vendor 3)
Process of
creating ICD
(vendor )
N
Vendor specific tool
for updating new
configuration to IED
(vendor )
N
UR relay 2
UR relay
X
Summary of Contents for C60
Page 2: ......
Page 4: ......
Page 11: ...GE Multilin C60 Breaker Protection System xi TABLE OF CONTENTS INDEX ...
Page 12: ...xii C60 Breaker Protection System GE Multilin TABLE OF CONTENTS ...
Page 32: ...1 20 C60 Breaker Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 50: ...2 18 C60 Breaker Protection System GE Multilin 2 2 SPECIFICATIONS 2 PRODUCT DESCRIPTION 2 ...
Page 128: ...4 30 C60 Breaker Protection System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Page 394: ...9 4 C60 Breaker Protection System GE Multilin 9 1 FAULT LOCATOR 9 THEORY OF OPERATION 9 ...
Page 516: ...D 10 C60 Breaker Protection System GE Multilin D 1 OVERVIEW APPENDIXD D ...
Page 528: ...E 12 C60 Breaker Protection System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...