GBC StreamPunch Ultra/Ultra MP
11-05-2018
RTPS
2-30
RTP 2.8 Checking Obstruction in Paper Path
Use this RTP to checking for an obstruction in the paper path.
When inspecting for obstruction to paper path, look for any ripped pieces
of paper or any other objects like loose fasteners along the paper path. A
few key areas to inspect are shown below:
Area 1 (Entrance)
1. Open the Front Door.
2. Open the Bypass Panel.
3. Inspect the gap between the Drive Roller and the sheet metal panel
for any objects.
Area 2 (Entrance Idler Panel Assembly)
1. At the top of Area 2 (Entrance Idler Panel Assembly), check if there is
a 2 to 3mm gap for sheet flow.
2. If the Lower entrance panel (PL #) is bent, Replace it (ARP #); If the
Inner Entrance panel (PL #) is bent, Replace it (ARP #).
Summary of Contents for StreamPunch Ultra
Page 2: ...Service Manual 11 05 2018 GBC StreamPunch Ultra Ultra MP ii ...
Page 9: ...GBC StreamPunch Ultra Ultra MP 11 05 2018 Service Manual ix Notes ...
Page 17: ...Service Call Procedures 02 03 2017 GBC StreamPunch Ultra Ultra MP 1 8 Notes ...
Page 66: ...GBC StreamPunch Ultra Ultra MP 11 05 2018 RTPS 2 49 Notes ...
Page 231: ...GBC StreamPunch Ultra Ultra MP 02 03 2017 Adjustments Repairs 4 151 Notes ...
Page 354: ...General Procedures and Information 11 05 2018 GBC StreamPunch Ultra Ultra MP 6 80 Notes ...
Page 356: ...Wiring Data 05 10 2018 GBC StreamPunch Ultra Ultra MP 7 2 This page intentionally left blank ...
Page 359: ...GBC StreamPunch Ultra Ultra MP 05 10 2018 Wiring Data 7 5 Plug Jack connectors ...
Page 369: ...Installation Instructions 02 03 2017 GBC StreamPunch Ultra Ultra MP 8 10 Notes ...