1.4.11 Back Gauge Solenoid Inspection and Cleaning
Maintenance Schedule
Clean every 750K cycles.
Procedure
•
Inspect and ensure the Back Gauge solenoid linkage moves freely. Press
linkage down and release [1]. Linkage should return.
•
Clean out the solenoid and surrounding area with a vacuum cleaner and
canned air [2]. Make sure the solenoid is clean and dry.
Note:
Do not apply lubricants to the solenoid or linkage.
To remove and inspect the back gauge, see “Back Gauge Assembly” on page 4-
36 and “Back Gauge Removal” on page 4-37.
Figure 1.15 Inspect and Clean Back Gauge Solenoid.
[1]
[2]
Summary of Contents for AdvancedPunch
Page 1: ...Document 7712571 Rev C1 23 08 2013 AdvancedPunch Technical Service Manual ...
Page 143: ...Section 5 5 4 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual ...
Page 144: ...Parts List Advanced Punch Service Manual Copyright 2009 GBC All rights reserved 5 5 ...
Page 149: ...Section 5 5 10 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual ...
Page 150: ...Parts List Advanced Punch Service Manual Copyright 2009 GBC All rights reserved 5 11 ...
Page 199: ...Section 8 8 4 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual 2 1 ...
Page 201: ...Section 8 8 6 Copyright 2009 GBC All rights reserved Advanced Punch Service Manual 2 1 2 1 2x ...