background image

STEPS

1.  Assemble the bottom corners (AB7 and AB8) to form the bottom support. Repeat with second pair  

 

of bottom corners.

2.  Insert a vertical pipe (AB9) into one end of each bottom support.

3.  Insert a top arch (AB6) onto the vertical pipes to connect the two supports.

4.  Slide the sling on the remaining top arch (AB6).

5.  Insert a vertical pipe (AB9) into the remaining end of each bottom support.

6.  Insert the remaining top arch (AB6) with the sling onto the vertical pipes.

7.  Remove the previously installed top arch (AB6), pass it through the remaining end seam of the sling (AB1), 

and re-insert onto the vertical pipes.

8.  Secure a connecting pipe (AB3) at each bottom corner over top of the sling, to provide tension. Use the 1 ¾” 

bolts (O) and wing nuts (Q).

9.  Assemble the top rails (AB4 and AB5) and secure each end to the top arches (AB6) using 1 ¾” bolts (O) 

and wing nuts (Q).

10. Secure the middle arch (AB10) to the center of the top rails, using 2 ½” bolts (P) and wing nuts (Q).

11. Install the cover (AB2) over the frame of the shelter, making sure the opening faces the desired direction.

Reviews:

Related manuals for ABRI BUCHES