14
GATES.COM
seTup
Gates GC20 Cortex
Figure 15: Calibration Settings screen
5.
Tap
PERFORM INITIAL SETUP CALIBRATION
. The tablet guides you step-by-
step through the initial calibration. There are two steps: Step 1 (Figure 16)
requires no additional tools. You will be instructed on a series of steps to
purge the air from all lines by cycling the crimper five times. Step 2 requires
a hose, coupling (stem), and die to perform a crimp and measure it for
compliance.
Figure 16: Cycling the crimper
6.
Tap
PROCEED
when you are ready. The application displays Calibration cycle
one (Figure 17).
WARNING:
Make sure that area under pusher cup is clear of die cone or die sets.