Installation, Operation & Maintenance Manual
Blanketing Pressure Regulator - Celtic N
Gascat – Indústria e Comércio Ltda
Page 1: ...Installation Operation Maintenance Manual Blanketing Pressure Regulator Celtic N Gascat Ind stria e Com rcio Ltda...
Page 2: ...lo CEP 13347 990 Brazil Phone 55 19 3875 7511 Fax 55 19 3894 5674 Email vendas gascat com br The comments below while not completely inclusive provide guidance on possible sources of risk to safety an...
Page 3: ...for higher durability Due to its compact size and small weight the regulator does not require special brackets for installation and is widely applicable in the Chemical and Oil Industry Celtic N regul...
Page 4: ...g to ANSI B1 20 1 or BSP according to BS 21 DIN 2999 Flanged ND 1 1 2 ND 2 150 300 ANSI B16 5 50mm DIN PN16 Interconnecting connection to the Tank Connector in AISI 316 1 2 OD Options of the capacity...
Page 5: ...lator Main Regulator ND To ease future maintenance provision shall be made for shut off valves installation in the supply sensor and downstream lines of the main regulator We recommend installing a pr...
Page 6: ...sor diaphragm 01 52 46B Up to 1 5 bar 01 53 02 01 53 02A 01 53 02B 01 53 02C 01 52 46C 1 5 to 4 0 bar 05 30 mmWC 10 50 mmWC 15 80 mmWC 30 150 mmWC 01 52 46D 3 5 to 8 0 bar 05 30 mmWC 10 55 mmWC 30 130...
Page 7: ...stallation Operation Maintenance Manual Blanketing Pressure Regulator Celtic N MI 20 Prepared by Checked by Approved by CSQ Quality Control Date Revision Page Vanizio Vanizio Lizo Celso Schettini Rube...
Page 8: ...stallation Operation Maintenance Manual Blanketing Pressure Regulator Celtic N MI 20 Prepared by Checked by Approved by CSQ Quality Control Date Revision Page Vanizio Vanizio Lizo Celso Schettini Rube...
Page 9: ...stallation Operation Maintenance Manual Blanketing Pressure Regulator Celtic N MI 20 Prepared by Checked by Approved by CSQ Quality Control Date Revision Page Vanizio Vanizio Lizo Celso Schettini Rube...
Page 10: ...t Downstream or upstream main regulator blocking valve fully or partially closed Check Filter obstruction upstream of the main regulator if installed Clean or replace filter element Defect Likely caus...
Page 11: ...12 months period from the date of invoicing if the products are in operation extending the warrant up to 18 months in case they are in stock Such warranty only covers those cases for which the occurre...