11 SERVICE WORK ON THE CHASSIS
40
Guideline
Screw, top triple clamp M6
12 Nm (8.9 lbf ft)
–
Tighten screws
5
.
Guideline
Screw, bottom triple
clamp
M6
10 Nm (7.4 lbf ft)
Info
Grooves are milled into the side of the upper end of the fork
legs. The first milled groove (from the top) must be flush
with the upper edge of the upper triple clamp.
The suspension is located in the left fork leg. The rebound
damping is located in the right fork leg.
Finishing work
–
Install the front wheel.
–
Install the front brake caliper.
–
Install the brake disc guard at the front.
–
Install the front fender. (
–
Install the headlight mask. (
11.6
Removing the lower triple clamp
Preparatory work
–
Raise the motorcycle with a lift stand. (
–
Remove the front wheel.
–
Remove front brake disc guard.
–
Remove front brake caliper.
–
Remove the front fender. (
–
Remove the headlight mask. (
–
Remove the fork legs.
E01347-12
Main work
–
Remove handlebar cushion
1
.
E01411-10
–
Remove screws
2
.
–
Take off handlebar and place it to the rear carefully.
Info
Cover the components to protect them against damage.
Do not kink the cables and lines.