![GARO ENTITY PRO Installation And Operations Download Page 20](http://html2.mh-extra.com/html/garo/entity-pro/entity-pro_installation-and-operations_3595309020.webp)
E. Front cover
4.7
TO ENSURE THE NECESSARY TOOLS
•
Make sure that the necessary tools for the
installation are available.
4.8
TO ENSURE THE NECESSARY
INSTALLATION MATERIAL
•
Make sure that the necessary installation materials
are available.
A. Power cable.
B. Ethernet cable with suitable RJ45 plug, if ethernet is
used.
C. Screws and plugs that are suitable for the wall
material, at a maximum diameter of 6 mm and a
maximum screw head diameter of 14 mm.
D. Cable grommets (M32) that is suitable for the entry
point of the power cable. For cables that enter from
the top of the charging station, use a IP54 cable
grommet with integrated cable strain relief function
as a minimum requirement.
1
2
3
4
TX20
A
B
C
D
20
Summary of Contents for ENTITY PRO
Page 1: ...GAROEntityProinstallationand operation GARO Entity Pro installation and operation...
Page 4: ......
Page 8: ......
Page 10: ......
Page 74: ......
Page 84: ......
Page 90: ......
Page 91: ...EC DECLARATION OF CONFORMITY 91 EC Declaration of conformity...