3.3

PRODUCT VARIANTS

The Entity Pro charging station (and separate charging

unit) is available in several product variants.

A

B

C

D

13

Product overview

Summary of Contents for ENTITY PRO

Page 1: ...GAROEntityProinstallationand operation GARO Entity Pro installation and operation...

Page 2: ...2 Simple setup scenarios 22 4 10 3 Advanced setup scenarios 22 4 11 To decide the position of the charging station 23 4 12 Cable installation 23 4 12 1 To install the stickers for IT 230 V 24 4 12 2...

Page 3: ...n light 76 5 2 To schedule charging 77 5 3 To monitor the charging process 77 5 4 To stop the charging of the electrical vehicle 77 6 Maintenance 79 6 1 To clean the charging station 79 6 2 To do a vi...

Page 4: ......

Page 5: ...controlled by one device either a charging station or a load interface to act as a master device Normally the Connection group also defines how the internet is connected to the units trough a master...

Page 6: ...ner can add other owners manage access for EV drivers and EV driver groups manage charger groups and create locations organizations and EV driver groups The owner can monitor and control status of the...

Page 7: ...UK GARO Electric Ltd Sales Customer Service Unit 16 Urban Express Park Aston Hall Road Birmingham B6 7FH 7 Introduction...

Page 8: ......

Page 9: ...s and regulations not to exceed charging current limitations Ventilation signal from EV is not supported This means that test of State D is not possible Adapters for charging connectors are not allowe...

Page 10: ......

Page 11: ...ront cover for charging units without an MID certified visible energy meter The front cover is available in several colors D Front cover for charging units with an MID certified visible energy meter T...

Page 12: ...veral colors Installation bracket single IB The installation bracket is where the physical installation is done It contains a permanent RFID tag with the identity of the physical charging station The...

Page 13: ...3 3 PRODUCT VARIANTS The Entity Pro charging station and separate charging unit is available in several product variants A B C D 13 Product overview...

Page 14: ...visible energy meter The product concept can for special high volume orders be customized to with or without the features listed below Type 2 outlet or fixed cable Long fixed cable 8 m or normal fixed...

Page 15: ...Visible MID energy meter optional H All pole circuit breaker manual reset I PE disconnection relay PME protection variant only for UK only J 2 port Ethernet switch RJ45 K Control cable port and conne...

Page 16: ...nal ID label placement after installation R Label load interface type S Sealing label T RFID reader area 3 5 DIMENSIONS 240 mm 150 mm 340 mm 480 mm 150 mm 340 mm 16 Product overview 2 The fixed cable...

Page 17: ...ts Only a technically skilled person with the necessary knowledge of the GARO Entity charging station may replace the charging unit 4 3 PERSONAL PROTECTIVE EQUIPMENT WARNING Make sure that the correct...

Page 18: ...ion s C Decide on access control for EV drivers It is possible to control access with the GARO Connect app or RFID tags where controlled authorization is necessary Those can also be combined in a sche...

Page 19: ...sure that all the necessary product s and accessories are available before the installation is started O Start the physical installation 4 5 TO GENERATE THE INSTALLATION CODE An installation code is...

Page 20: ...rnet cable with suitable RJ45 plug if ethernet is used C Screws and plugs that are suitable for the wall material at a maximum diameter of 6 mm and a maximum screw head diameter of 14 mm D Cable gromm...

Page 21: ...distances or obstacles may require physical ethernet cable connections NOTE A connection group is limited to max 32 units If more units needs to be used in the system then subgroups needs to be intro...

Page 22: ...the distance X between the charging stations is short and there are no radio obstacles it is possible to use a mesh Wi Fi connection between the master charging station A and the other charging statio...

Page 23: ...e position of the charging station is approved from an accessibility C perspective Comply with local requirements 4 12 CABLE INSTALLATION The GARO Entity is designed to work with both 400 V TN S defau...

Page 24: ...m the inlet hole of the power cable b If there are several charging stations to be daisy chained with the same feeding cable also remove the knock out for the outlet hole of the second power cable c I...

Page 25: ...ak out for the outlet hole of the second ethernet cable 3 If a control cable is to be used one option is to use the lower entrypoint To remove the break out use a flat screwdriver NOTE Maximum cable d...

Page 26: ...cessories 4 12 4 TO PREPARE THE POWER CABLE FOR INSTALLATION CAUTION If it is necessary to pass the connection terminal with connection of the power cable due to dual power cables in the same directio...

Page 27: ...ead the power cable through the grommet in the power cable inlet hole 3 Make sure that the cable sheet reaches 2 mm above the bracket for the cable strain relief 4 Install the cable strain relief to f...

Page 28: ...ially when installing several charging stations in one location GARO Entity PRO is available with a built in phase management system that when using DLM automatically selects the phase s that can be u...

Page 29: ...s A use a flat screwdriver and push the orange button to open the terminal b If the wires have cable ferrules B or solid conductors C push the wires into the terminal 3 To remove any wire push a flat...

Page 30: ...minal page 28 4 12 7 TO PREPARE THE INSTALLATION BRACKET WITH ETHERNET CABLE S If ethernet should be used the installation bracket must be prepared with the ethernet cable s 1 Thread the ethernet cabl...

Page 31: ...TO INSTALL THE CONTROL CABLE TO THE INSTALLATION BRACKET NOTE The charging station has a control input that can be used to enable and disable charging This digital input signal limits the charging cur...

Page 32: ...spring mechanism in the connector before you push the cable in NOTE If wires need to be disconnected use a flat screwdriver to push the orange button to open the terminal 4 12 11 TO CHANGE THE POSITIO...

Page 33: ...sonal injury or death 1 Make sure that the power voltage is off 2 Do a visual inspection and make sure that nobody accidentally can access the installation bracket s Make sure that it is safe to apply...

Page 34: ...to the terminal page 28 6 Switch the power voltage to off 7 Read the QR code on the installation bracket using the Gar Connect App At this step it is time to connect the charging station created in t...

Page 35: ...e installation of the charging unit 1 Attach the protection cover to the installation bracket 2 Tighten the screws with a Torx TX20 until the protection cover is tight against the installation bracket...

Page 36: ...gs e g if it shall act as master with a local Wi Fi as the internet connection then at this time the internet connectivity settings in the GARO Connect app should be made Refer to Create and setup a l...

Page 37: ...pproximately 2 minutes and is shown with a green light indication 5 Set the charging station to state B Shown with a blue solid light indication 6 Set the charging station to state C Shown with a blue...

Page 38: ...arth faults AC and DC with a test instrument 11 If necessary reset the all pole circuit breaker Refer to 6 5 To do a reset after a minor ground fault page 80 12 Set the charging station to state A 13...

Page 39: ...complete the whole installation of the connection group and to test it before the installation is handed over to owner for operation 4 13 GARO CONNECT 4 13 1 THE GARO CONNECT APP The function of the G...

Page 40: ...aller Download the GARO Connect app 6 Owner or Installer on behalf of the Owner Prepare the installation and invite the Installer 7 Installer Install the charging stations s CS s 8 Installer Install t...

Page 41: ...dd a location group charging station etcetera Master The icon is shown beside the master charging station or load interface The master unit can act as a gateway to Internet If a connection group is se...

Page 42: ...enu load and use manage charging stations and users or install charging stations Personal settings Manage name and e mail address Click the settings icon next to your name to manage personal settings...

Page 43: ...ging cable Type 2 that is connected to the charging station This means that the charging station has a fixed cable Only possible for Garo Entity CS Type 2 outlet The icon is for the Type 2 outlet whic...

Page 44: ...anization if it is needed This is not mandatory for every installation Add more persons as owners 3 Create the logical charging station s CS in the GARO Connect app The logical charging station s CS i...

Page 45: ...the app Follow the instructions on the screen 3 Log on to the app with the provided credentials 4 Select Manage chargers 5 Create the charging station or charging stations for the location default loc...

Page 46: ...ate charging stations once invited with the installation code from the owner 6 Go to Location settings and choose Invite installer 7 Generate an installation code An e mail address can to the installe...

Page 47: ...tings for each charging station can be changed Click on applicable charging station then Charger Settings and follow the instructions in the app Enable charging station Under Manage chargers and users...

Page 48: ...e seen as overridden by the free use Invite drivers The owner can invite EV drivers from the app Click Charger Settings select Users and follow the instructions in the app EV drivers can be added indi...

Page 49: ...an organization The organization is a good tool when administrating several locations Advanced owner tools Additional owners can be added and removed to a location and organization However an organiz...

Page 50: ...tallation code is related to a location 2 Select the location that the owner has set up 3 Create or choose charging station 4 Perform the physical installation Refer to 4 Installation page 17 5 Connec...

Page 51: ...3 Choose Install chargers If the owner has sent an invitation the invitation screen will automatically show Go to Step 4 4 Enter the installation code provided by the owner 51 Installation...

Page 52: ...to start an installation If a new installation code is generated by the owner the old code becomes invalid and cannot be used A location is normally equal to an electrical mains system of a building s...

Page 53: ...d cloud connection Internet to a CS is connected in this priority 1 Ethernet cable 2 Mesh Wi Fi if the charging station is part of a connection group 3 Local Wi Fi requires manual setting 4 4 G LTE Th...

Page 54: ...ile with app and the charging station To set up a direct connection use the charging unit ID label to enter the credentials to the GARO Connect app The QR code is scanned via the GARO Connect app NOTE...

Page 55: ...cable If neither ethernet nor Wi Fi is available the charging unit will automatically connect through 4 G LTE If the charging station is configured as part of a connection group trough a mesh Wi Fi t...

Page 56: ...ays be updated but never downgraded as this is not allowed due to cyber security It is highly recommended to enable automatic update of firmware default setting 10 Configuration settings There are sev...

Page 57: ...inalize the installation by testing the charging station with an EV tester or an EV 12 Declare installation as completed After final testing the installation of the charging unit can be declared ready...

Page 58: ...ettings installer The DLM settings are common but not mandatory Create a connection group for the charging stations Connection group s can be created to control maximal current consumption by the char...

Page 59: ...etup as a master unit Other charging station units can be connected to the master unit using mesh Wi Fi ethernet cable or both The master charging station unit is the bridge between the mesh Wi Fi and...

Page 60: ...n Refer to 4 14 3 To install the load interface in an electrical cabinet page 68 5 Connect the created load interface in the app to a physical load interface by scanning the QR code on the load interf...

Page 61: ...e access point to the DLM unit Once the internet icon is connected to the charging station the app device mobile phone will communicate with the DLM unit over the internet so the direct connection sha...

Page 62: ...internet gateway master The connection group is also defined by a maximum current which is typically the same size as the fuse that is to be protected from overload The connection group either consist...

Page 63: ...s the same structure as meshed Wi Fi or ethernet cables NOTE The Load Interface is available in two versions GARO Entity Balance Basic and GARO Entity Balance Advanced Their difference lies in connect...

Page 64: ...By using the GARO Connect app any limitation that occurs can be analyzed to see what causes the limitation 64 Installation...

Page 65: ...ND Black L CT2 White K CT1 White K CT3 GND Black L CT3 White K PE GND L N M Bus Energy Meter M Bus M Bus Modbus Energy Meter B A Modbus B Z Modbus A Y GND Relay controlled auxillary unit max 250V AC 3...

Page 66: ...monitored Measured current in fuse by LI 2 through CT I max Fuse size in this case 100A I monitored Measured current in fuse by LI 1 through HAN interface Incomming current Main fuse Note Only CS load...

Page 67: ...WWW 3 level Connection group CG Communication structure Wi Fi Mesh CS1 LI 2 MASTER CG A1A CG A1 MASTER CG A1 LI 1 LOCAL Wi Fi CS2 MASTER CG A1A F1 CS3 CS4 Mesh Station Li acting as range extender Wi F...

Page 68: ...nits are available at GARO GARO Entity Balance BASIC and GARO Entity Balance ADVANCED NOTE This chapter shows the installation of the GARO Entity Balance BASIC model The process for the GARO Entity Ba...

Page 69: ...ce to the 230V AC Refer to the electrical schedule for all electrical connections 6 Connect the Load interface to the protection device 7 If current is measured using current transformer choose the co...

Page 70: ...ation of the GARO Entity Balance BASIC and the GARO 0 333 mV CT clamps that are available as accessory The process for the GARO Entity Balance ADVANCED is similar 8 Dismantle the CT wires and connect...

Page 71: ...mmunications to the modern Main utility meters based on RJ12 or RJ45 connections HAN is only available on GARO Entity Balance BASIC 12 The load Interface is a part of the total GARO Entity Charging St...

Page 72: ...net other radio equipment etc 15 The long range panel mounted circular disc Wi Fi antenna is available as accessory at GARO It is used when the distance to the Wi Fi or mesh Wi Fi node other entity un...

Page 73: ...on the load interface does not turn green within 90 sec of power 18 Download the GARO app on AppStore or Google Play store 19 Test the load management setup to ensure that the current is limited at hi...

Page 74: ......

Page 75: ...cation authorization is necessary Do one of the steps that follow NOTE If the charging station is set to free charge mode default no authorization will be necessary and the charging starts immediately...

Page 76: ...act is not in correct position Try to reconnect D Yellow slow blinking light 1 Hz The charging station is reserved or awaits authorization by the EV Driver E Yellow fast blinking light 10 Hz The autho...

Page 77: ...to each charging station that is in use by an EV Driver account identity up to the same access level The charging process can be started stopped and charging scheduled see the status of the charging...

Page 78: ...CAUTION Do not leave the Type 2 contact on the ground Always hang it up or store it in a dry location 78 Operation...

Page 79: ...y reset should only be done as a last resort in case of errors such as lost contact to the network or the GARO Connect app 1 Stop charging and disconnect any EV 2 Remove the front cover of the chargin...

Page 80: ...cuit breaker can trip either due to a earth fault short circuit or overload a short circuit 1 If there is an EV connected to the charging station unplug the Type 2 charging connector 2 Unlock and remo...

Page 81: ...staller or a person acting on behalf of an authorized installer may replace the installation bracket NOTE Only 1 installation bracket can be installed connected to 1 charging station in the app If an...

Page 82: ...e user and the owner if configured 1 Disconnect the EV 2 Contact the installer to investigate the root cause of the problem Reset the circuit breaker 3 Press the test button marked T to conduct a grou...

Page 83: ...al enable signal The indication light shows a slow blinking yellow light Before starting the charging process do a check of the Type 2 connectors If the charging process is stopped remove the charging...

Page 84: ......

Page 85: ...door Location type Non restricted access Rated voltage TN TT 2 3 phase 400 VAC 50 Hz TN TT 1 phase 230 VAC 50 Hz IT 2 3 phase 230 VAC 50 Hz Rated current 32 A or 20 A depending on fixed cable version...

Page 86: ...rrent of an assembly 10 kA Short circuit protective device type C Rated impulse withstand voltage 4 kV TBC Rated insulation voltage 230 V 400 V Rated diversity factor RDF 1 Pollution degree 3 EMC envi...

Page 87: ...cation type Restricted access Rated voltage TN IT TT 1 phase 230 VAC 50 Hz Rated current 13 mA Installation systems TT IT and TT system Power 3W Protection class IP20 Temperature range 20 C to 50 C We...

Page 88: ...Wi Fi 2 4 GHz mesh HAN RJ 45 input EN 13757 2 1 N A HAN RJ 12 input 1 N A Current transformer input 333 mV x3 N A Current transformer input 0 5 A N A x3 M Bus input N A 1 Modbus input RS 485 N A 1 Re...

Page 89: ...enses A copy of the licenses are available in a separate document Source code can be obtained from GARO for a period of 3 years after the final shipment of the product which may be no earlier than 202...

Page 90: ......

Page 91: ...EC DECLARATION OF CONFORMITY 91 EC Declaration of conformity...