6. Cut and dismantle the wires. Use a wire ferrule (A)
for strained power wire conductors (B).
CAUTION
Make sure that the protective earth cable is a little bit
longer than the other cables.
NOTE
It is highly recommended that the feeding fuse to all
power cables are based on all-pole breakers (MCB/
MCCB).
4.12.5
TO CONNECT THE POWER CABLE TO THE
TERMINAL
Electric vehicles charge on one, (two) or three phases.
Phase loads must be addressed, especially when
installing several charging stations in one location.
GARO Entity PRO is available with a built-in phase
management system, that when using DLM,
automatically selects the phase(s) that can be used. This
means, that the charging stations involved can be
installed as L1 to L1, L2 to L2 and L3 to L3.
If charging units without this function are used, it is
highly recommended to rotate phases one step for each
charging station. The rotation must also be configured
in the GARO Connect app to reflect exactly how each
charging station is connected to the grid.
Another reason to install charging stations with rotation
between all stations is that if many one-phase vehicles
are charging, the DLM may perform better in keeping
three-phase charging in use. The reason for this is
because the used phases will be more evenly
distributed.
Install the power lines as follows:
1. Install the wires of the power cable according to
installation type.
18 mm
A
B
Version: 1.3
31
Summary of Contents for ENTITY PRO
Page 4: ......
Page 8: ......
Page 10: ......
Page 18: ......
Page 48: ...100A LI 1 LI 2 48 Version 1 3 Installation...
Page 100: ......
Page 101: ...EU DECLARATION OF CONFORMITY Version 1 3 101 EU Declaration of conformity...
Page 102: ...102 Version 1 3 EU Declaration of conformity...