G1000 NXi System Maintenance Manual
Page 116
King Air 300 Series
Revision 1
190-00716-N1
•
Engine Signal Conditioner #2 near mounting holes of case: __________
mΩ
•
Top metal case of GCU 477: __________ mΩ
Cabin Compartment
•
GSA 80 (Roll) Servo body: __________
mΩ
•
GPA 65 body (if installed)
: __________ mΩ
Phase 4 Electrical Bonding Procedure
Using one of the two measurement methods in Section 4.5.2 record the bonding measurement
for the following equipment. Some equipment in the list is optional and may not be installed.
Ensure that at each other tes
t point, no more than 5 mΩ is present.
Nose Section
•
GWX 68 or GWX 70 body: __________
mΩ
Nose Avionics Compartment
•
GIA 1 top: __________
mΩ
•
GIA 2 top: __________
mΩ
•
GSU 75B, GRS 77, or GRS 7800 #1 metal base: __________
mΩ
•
GSU 75B, GRS 77, or GRS 7800 #2 metal base: __________
mΩ
•
Standby battery: __________
mΩ
•
GTS 820/850/Processor metal base: __________ mΩ
Rear Fuselage and Empennage
•
GMU 44 #1 metal base: __________
mΩ
•
GMU 44 #2 metal base: __________
mΩ
•
GSA 80 (Pitch) Servo body: __________
mΩ
•
GSA 80 (Pitch Trim) Servo body: __________
mΩ
•
GSA 9000 (Yaw) Servo body: __________
mΩ
•
GRA 5500 Radar Altimeter __________
mΩ
•
GTX 335R #1, GTX 345R #1, GTX 33 #1, or GTX 3000 #1
top: __________ mΩ
•
GTX 335R #2, GTX 33 #2, or GTX 3000 #2 top: __________
mΩ
•
GDL 59 top: __________ mΩ
•
GSR 56 metal base: _____
_____ mΩ
•
GSD 41 top:
__________ mΩ
Summary of Contents for G1000 NXi