
GB
- 13 -
4. Technical data
Idle speed n
0
....................................12,000 min
-1
Air speed ...............................................210 km/h
L
WA
sound power level ........................ 79,5 dB(A)
L
pA
sound pressure level ..................... 68,5 dB(A)
K uncertainty ........................................... 3 dB(A)
Guaranteed sound power level L
WA
: ........ 87 dB(A)
Vibration a
hv
.........................................
≤ 2.5 m/s
2
K uncertainty ...........................................1.5 m/s
2
Weight: .......................................................1.5 kg
Important!
The equipment is supplied without batteries and
without a charger is allowed to be used only with
the lithium-ion batteries of the Power-X-Change
series!
Power-X-Change
20 V, 1.5 Ah ..............................5 lithium-ion cells
20 V, 3.0 Ah ............................10 lithium-ion cells
20 V, 4.0 Ah ............................10 lithium-ion cells
The lithium-ion batteries of the Power-X-Change
series are allowed to be charged only with the
Power-X charger.
Charging unit
Mains voltage ................... 200-250 V ~ 50-60 Hz
Output
Rated voltage ........................................ 21 V d. c.
Rated current ....................................... 3000 mA
The machine may exceed 85 dB (A). The operator
will require noise protection measures if this is
the case.
The specified vibration value was established in
accordance with a standardized testing method. It
may change according to how the electric equip-
ment is used and may exceed the specified value
in exceptional circumstances.
The specified vibration value can be used for initi
-
al assessment of a harmful effect.
Caution!
The vibration value changes according to the
area of application of the electric equipment and
may exceed the specified value in exceptional
circumstances.
Keep the noise emissions and vibrations to a
minimum.
•
Only use appliances which are in perfect wor-
king order.
•
Service and clean the appliance regularly.
•
Adapt your working style to suit the appliance.
•
Do not overload the appliance.
•
Have the appliance serviced whenever ne-
cessary.
•
Switch the appliance off when it is not in use.
•
Wear protective gloves.
5. Before starting the equipment
The equipment is supplied without batteries
and without a charger.
5.1 Fitting the blower tube (Fig. 3)
Plug the blower tube (Fig. 1) to the motor unit
(Item 3).
5.2 Fitting the battery pack (Fig. 4a/4b)
Press the pushlock button of the battery pack as
shown in Fig. 4a and push the battery pack into
the mount provided. When the battery pack is po-
sitioned as in Fig. 4b, make sure that the pushlock
button latches in place! To remove the battery
pack, proceed in reverse order.
5.3 Charging the battery (Fig. 5)
1. Take the battery pack out of the equipment.
Do this by pressing the side pushlock buttons.
2. Check that your mains voltage is the same as
that marked on the rating plate of the battery
charger. Insert the power plug of the charger
(4) into the mains socket outlet. The green
LED will then begin to flash.
3. Insert the battery pack (5) into the battery
charger (4).
4. In the section entitled „Charger indicator“ you
will find a table with an explanation of the LED
indicator on the charger.
The battery pack can become a little warm during
the charging. This is normal.
If the battery pack fails to charge, check:
•
whether there is voltage at the socket outlet
•
whether there is good contact at the charging
contacts
Anl_GLB_E_20_Li_OA_SPK7.indb 13
12.10.2015 12:09:53
Summary of Contents for GLB-E 20 Li OA
Page 2: ...2 1 3 3 1 4a 1 3 5 2 2 3 1 A Anl_GLB_E_20_Li_OA_SPK7 indb 2 12 10 2015 12 09 52...
Page 3: ...3 4b 5 4 5 6 1 2 3 3 4 5 Anl_GLB_E_20_Li_OA_SPK7 indb 3 12 10 2015 12 09 52...
Page 99: ...BG 99 8 9 10 5 30 C Anl_GLB_E_20_Li_OA_SPK7 indb 99 12 10 2015 12 10 00...
Page 101: ...BG 101 l 2012 19 EO iSC GmbH Anl_GLB_E_20_Li_OA_SPK7 indb 101 12 10 2015 12 10 00...
Page 102: ...BG 102 www isc gmbh info Anl_GLB_E_20_Li_OA_SPK7 indb 102 12 10 2015 12 10 00...
Page 103: ...BG 103 1 2 3 4 84 5 www isc gmbh info Anl_GLB_E_20_Li_OA_SPK7 indb 103 12 10 2015 12 10 00...
Page 130: ...RU 130 2012 19 EG ISC GmbH pa e c a e e e Anl_GLB_E_20_Li_OA_SPK7 indb 130 12 10 2015 12 10 02...
Page 131: ...RU 131 www isc gmbh info Anl_GLB_E_20_Li_OA_SPK7 indb 131 12 10 2015 12 10 02...
Page 132: ...RU 132 1 2 3 4 84 5 www isc gmbh info Anl_GLB_E_20_Li_OA_SPK7 indb 132 12 10 2015 12 10 02...
Page 190: ...190 Anl_GLB_E_20_Li_OA_SPK7 indb 190 12 10 2015 12 10 06...
Page 191: ...191 Anl_GLB_E_20_Li_OA_SPK7 indb 191 12 10 2015 12 10 06...
Page 192: ...EH 09 2015 01 Anl_GLB_E_20_Li_OA_SPK7 indb 192 12 10 2015 12 10 06...